UNIVERSITY OF PARDUBICE October 25, 2004

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Symantec 2010 Windows 7 Migration Global Results.
1 A B C
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Slide 1Fig 24-CO, p.737. Slide 2Fig 24-1, p.740 Slide 3Fig 24-2, p.741.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Processes and Operating Systems
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
David Burdett May 11, 2004 Package Binding for WS CDL.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Custom Services and Training Provider Details Chapter 4.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt RhymesMapsMathInsects.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Applicable for Persons Registered under Article 10
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
1. PHOTO INDEX Bayside: Page 5-7 Other Colour Leon: Page 8-10 Cabrera Page Canaria Page Driftwood Page 16 Florence Florence and Corfu Page.
Break Time Remaining 10:00.
This module: Telling the time
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
CS 6143 COMPUTER ARCHITECTURE II SPRING 2014 ACM Principles and Practice of Parallel Programming, PPoPP, 2006 Panel Presentations Parallel Processing is.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
1 DRAFT EB / EE / ES / HB / PP1 MAINTENANCE (RADIATION SHIELDING & TOOLING FOR INSTALLATION) A.SURKOV University of Wisconsin CERN
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST.
Presentation transcript:

UNIVERSITY OF PARDUBICE October 25, 2004 ANSALDO SEGNALAMENTO FERROVIARIO Company overview and ERTMS/ETCS references UNIVERSITY OF PARDUBICE October 25, 2004

Ansaldo Segnalamento Ferroviario Corporate Structure ANSALDO SIGNAL FINMECCANICA Ansaldo Segnalamento Ferroviario

Transportation Sector of Finmeccanica Revenues (M€) 538 547 269 3009 2530 297 Transportation Sector of Finmeccanica TURN-KEY SYSTEMS SIGNALLING ROLLING STOCK 2003 Employees

Corporate Architecture

33 % Degrees 56 % Graduates 11 % Others TOTAL 1040 at Aug. ‘04 Torino ( 300 ) Genova ( 402 ) Napoli ( 185 ) Potenza ( 149 ) Engineering Installation & Commissioning Project Management Company H. Q. R & D Marketing & Sales RAMS Staff Factory 33 % Degrees 56 % Graduates 11 % Others TOTAL 1040 at Aug. ‘04 Manchester ( 4 )

Main Systems and Products Electronic interlockings ERTMS/ETCS Conventional ATC and ATP CTC

Interlockings portfolio: equipped stations ACEI ACC 1000 153 111 40 800 2 811 779 692 600 519 400 262 200 120 62 70 75 80 85 90 95 '00 '04

Roma Junction lay out Operator Interface of the Supervision system Orte Pisa Operator Interface of the Supervision system Viterbo Fara Sabina H. V. Firenze Monterotondo Cesano Settebagni Cab “C” Smistam. La Storta Maccarese Cab “F” Bivio Nord N. Salario M. Mario R. Salario Roma Termini Scalo S. Lorenzo Nomentana Aurelia San Pietro Tiburtina Aeroporto L. Vinci B. Tiburtuina B. Portonaccio P.co Prenestina B. Tuscolana Prenestina Ostiense Trastevere Tuscolana Tor Sapienza Magliana P. Galeria Casilina Salone B. Casilina Lunghezza Bagni Tivoli Roma Junction lay out Guidonia Ciampino Cassino Pescara Torricola V. A. F.

West Coast main line

Automatic Block systems: Lines length equipped 982 218 9963 9395 8500 6402 2768 1970 1975 1980 1985 1990 1995 2003

SCMT: Sistema Controllo Marcia Treno Wayside installations: 2.000 km lines length, 300 stations - Firenze junction: 120 stazioni - Napoli junction: 72 stazioni - Torino junction: 50 stazioni Verona junction: 14 stazioni

Line length (km) under CTC control 1970 1975 1980 1985 1990 1995 2003 1.817 8.774 90 755 568 5.859 3.321

CTC Grande Rete CTC Grande Rete per: Brennero Torino Mi CTC Grande Rete per: Genova junction (650 trains per day) Venezia junction (630 trains per day) Napoli junction (1150 trains per day) Tirrenica line (500 trains per day) Adriatica line (590 trains per day) Bologna - Brennero line (400 trains per day) Palermo junction (490 trains per day) Venezia Bologna Genova Roma Napoli Bari Palermo Messina Siracusa

Italian High Speed Network Main traffic characteristics Main train speed 300 km/h Min. headway 2.5 min Min. timetable 5 min. Electric traction 25 kV ac Long distance trains Fast freight trains

Mass Transit main references Italy Genova Milano linee 1, 2, 3 Napoli Roma linee A, B Perù Lima U K Birmingham Br Belo Horizonte

ERTMS Application Vienna - Budapest line STM for migration strategy Madrid-Sevilla Arezzo-Rigutino H. S. line Tournan-Marles -en-Brie line Plovdiv junction and Stara Zagora-Burgas line Site Tests Ongoing Projects Madrid-Barcelona- French border HS line Whole Italian H. S. network (first line will be Rome-Naples) TGV East Lev. 1 overall network Vienna Budapest line STM for migration strategy

Goals Achieved ASNV involvement in the ERTMS Specs Development as Eurosig/Unisig Member Selection of ASNV technology for Eurobalise ASNV participation in the French and Italian Pilot Projects ASNV leading role in the Vienna-Budapest ERTMS Implementation Project ASNV Extremely successful in EMSET Tests (Madrid-Sevilla)

Goals Achieved ETCS Lev. 1 in Bulgaria (as supplier of components) ETCS Lev. 1 in Hungary (as supplier of components) ETCS Lev. 1, 2 in Madrid-Barcelona (Spanish HSL) ETCS Lev. 2 for all Italian HSL ETCS Lev. 1,2 for the TGV Est Européenne

THE HIGH SPEED PROJECT IN ITALY

Italian Project: Sections

Italian Project: Sections

Italian Project: Sections

Italian Project: Sections

H. S. line Roma-Napoli: system architecture SCC ANSALDO RBC ALSTOM Centro GSM-R SIRTI NSS BSC Posto Centrale Rete TLC-LD SIRTI Posto Periferico Periferia GSM-R SIRTI NVP - GAT ANSALDO BTS Interfaccia CdB audiofr. Cabina Boe ANSALDO Dev. Oleodinamici Dev. Elettromecc. ALSTOM CdB audiofrequenza ALSTOM Altri dispositivi (RTB,…) ALTRI Piazzale

Italian Project: ERTMS overall architecture Milano - Bologna Italian Project: ERTMS overall architecture SCC (Centralized Control System) ANSALDO RBC NSS NMS BSC GSM - R Center SIRTI Fiber Optic Long Distance Communication Network w ay side BTS IXL Eurobalise ALSTOM Oleodinamic and Electromechanical switching machines A.F. Track Circuits Hot box Detection BOMBARDIER Periph. Unit Cabine Field

Italian Project: ERTMS overall architecture Torino - Milano Italian Project: ERTMS overall architecture SCC (Centralized Control System) ANSALDO RBC NSS NMS BSC GSM - R Center SIRTI Fiber Optic Long Distance Communication Network way side BTS IXL Eurobalise ALSTOM Oleodinamic and Electromechanical switching machines A.F. Track Circuits Hot box Detection BOMBARDIER Periph. Unit Cabine Field

Italian Project: ERTMS overall architecture Bologna - Firenze Italian Project: ERTMS overall architecture

TGV Est Européenne ERTMS/ETCS lev. 1 and lev. 2 (plus TVM and electronic IXL’s ) 300 km from Vaires (Paris) to Baudrecourt (Metz) due to open in 2007 Operating speed 320 km/h

ETCS Level 1 – PROJECT Spanish High Speed Lines ASNV is providing for this line both Level 1 and Level 2, with ASFA as a fall back system Project Name Madrid – Lerida Location Spain Name of the Customer GIF Date to be in Commercial Service N/A Date Trials due to/have finished Sept 2004 Conformant with Specification UNISIG 2.0.0 Line Performance – Capacity 11 trains per hour per direction Line Performance – Speed 300 km/h Mixed Traffic Line Yes Number of Complex junctions 13

MADRID - LERIDA line equipped with ERTMS project description and development PUIGVERD DE LLEIDA 440 Km, 13 stations, 1100 track circuits LLEIDA ZA - Aeropuerto EL SEGRE ZARAGOZA BUJARALOZ CALATAYUD PLASENCIA de JALON GOMARA SORIA ARIZA Soria - Calatayud: 90 Km LAS INVERNAS MEDINACELI GUADALAJARA MADRID SUR MADRID

BDŽ (Bulgaria) Sofia – Burgas ETCS – Lev.1 References BDŽ (Bulgaria) Sofia – Burgas Supplier of Alcatel Austria for : BTM and Antennas (184) Eurobalises (1.078)

MÁV (Hungary) Budapest-Kelenföld-Kimle ETCS – Lev.1 References MÁV (Hungary) Budapest-Kelenföld-Kimle Supplier of Alcatel Austria for: BTM and Antennas (20) Eurobalises (1.800)

GIF (Spain) Madrid – Puigvert de Lleida (Lev.1&2) ETCS – Lev.1 References GIF (Spain) Madrid – Puigvert de Lleida (Lev.1&2) Supplier (for the Lev.1 system) of: BTM and Antennas (32) LEU (347) Eurobalises (3.500)

ETCS – Lev.1 References SNCB (Belgium) Design and development of specific LEU for the national application.

ETCS – Lev.1 References RFI (Italy) SCMT EVC (> 1.100) Design, configuration, supply and installation of the complete wayside and on-board system EVC (> 1.100) BTM and Antennas (> 2.200) LEU Cabinets (700) and LEU modules Eurobalises (> 23.000)

RFI (Italy) High Speed Lines ETCS – Lev.1 References RFI (Italy) High Speed Lines Design, configuration, supply and installation of the complete signalling system based on ERTMS/ETCS – Lev.2. RBC (5) LEU (for interconnections) (320) Eurobalises (2.500)

Equipment for ERTMS Balise Transmission Module Encotrak-LEU Unicab –On board Equip. Balise Transmission Module

RBC RBC Platform Vital section: TMR Non vital section: ART1 ed ART2 ISDN-GSMR Non vital section: ART1 ed ART2 Vital Functional Keyboard Non vital Functional Keyboard Operator Interface Diagnostic & Maintenance Interface with others RBC & NVP CC Interface Vital section: TMR

RBC Architecture (ISDN-GSMR) G703/G704 Fast LAN (TCP/IP) CC1 and CC2 Interface to trains G703/G704 Interface to other RBC, NVP Fast LAN (TCP/IP) RBC Architecture

ETCS On-Board EUROCAB 40 3 CSEE Transport Cab Display On-board Computer 3 40 09/01 CSEE Transport

LEU cabinets

LEU module

Eurobalise

Eurobalise installation

Eurobalise programmer and tester

Thank for your attention