1 DRAFT EB / EE / ES / HB / PP1 MAINTENANCE (RADIATION SHIELDING & TOOLING FOR INSTALLATION) A.SURKOV University of Wisconsin CERN 09.08.2011.

Similar presentations


Presentation on theme: "1 DRAFT EB / EE / ES / HB / PP1 MAINTENANCE (RADIATION SHIELDING & TOOLING FOR INSTALLATION) A.SURKOV University of Wisconsin CERN 09.08.2011."— Presentation transcript:

1 1 DRAFT EB / EE / ES / HB / PP1 MAINTENANCE (RADIATION SHIELDING & TOOLING FOR INSTALLATION) A.SURKOV University of Wisconsin CERN 09.08.2011

2 2 The goal of design: To provide maintenance and services works of EB / EE / ES / HB / PP1 / PIXEL / TK (from Tracker Bulkhead to 11m); To provide maintenance and services works of EB / EE / ES / HB / PP1 / PIXEL / TK (from Tracker Bulkhead to 11m); To provide safe access to all central subdetectors; To provide safe access to all central subdetectors; The set tooling & radiation shielding should provide full compatibilities with all activities; The set tooling & radiation shielding should provide full compatibilities with all activities; We try to use present equipment from P5 (main platform, “gasprom” platform, yellow structures, EB platform with “enfourneur” We try to use present equipment from P5 (main platform, “gasprom” platform, yellow structures, EB platform with “enfourneur”

3 3

4 4 EB MAINTENANCE (super module reinstallation)

5 5 EB PLATFORM MODIFICATION

6 6 EB TOOLING INSTALLATION

7 7 EB platform/VT cable treys conflict

8 8 EB platform/VT cable trays conflict

9 9 EB SUPER MODULE REINSTALLATION

10 10

11 11 TK/BP shielding interface

12 12 Bulkhead & BP shielding

13 13 Shielding support fix onto PP1

14 14 Shielding support fix onto PP1

15 15 BP & forward shielding

16 16 BP shielding in open position

17 17 Radiation shielding & supports system (EB/HB/ES/EE maintenance)

18 18 Bulkhead shielding & support installation onto PP1

19 19 Shielding/BP interface

20 20 Front shielding disk with support installation

21 21 Tooling for support & shielding installation

22 22

23 23

24 24 Temporary bar installation

25 25 Temporary bar removed

26 26 Shielding support installation onto PP1

27 27 Shielding support installation onto PP1

28 28 Stair-platform & special scaffolding compatibility

29 29 Star-platform & special scaffolding compatibility

30 30 Winch system for counter weight stroke

31 31 Tooling for Support & shielding installation

32 32 Counterweight remove

33 33 BP shielding installation

34 34 BP shielding installation (step by step)

35 35 Back shielding installation

36 36 BP temporary support installation

37 37 Shield seismic load stabilization

38 38 Shield seismic load stabilization

39 39 HB/EB/ES/EE maintenance

40 40 HB/TK/PP1 zone maintenance

41 41 Radiation shielding & supports system (EB/HB/PP1 maintenance)

42 42 BP shielding installation

43 43

44 44 PIXEL/ES/EE maintenance

45 45 PIXEL REINSTALLATION (LAYOUT)