Symantec 2010 Windows 7 Migration EMEA Results
Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry 2
Key Topics Attitudes about migrating Manpower requirements Preparing for the migration General recommendations Results of the migration 3
4 Attitudes About Migrating
Timing and Motivations Typically wait six to 12 months Only 5% migrate immediately Performance, reliability and end-user experience motivated migration Most (57%) set ROI goals 91% met ROI goals 5
6 Manpower Requirements
Manpower requirements Typically involve almost half of IT staff Most automated the process 15 PCs worth automating Time consuming aspects: – Planning (18%) – Actual execution of upgrade (12%) – Reinstalling applications (10%) – Inventorying existing machines (9%) – Running pilot tests (9%) 7
8 Preparing for the Migration
Before the migration What to capture beforehand – User files & documents – Links to network drives – User profiles Processor speed, RAM, budget, PC age important 12 IT man-hours in preparation 9
Hardware recommendations CPU – Minimum: 2 to 2.5 GHz – Optimal: 2.5 to 3 GHz RAM – Minimum: 2 GB – Optimal: 4 GB Storage – Minimum: 200 to 500 GB – Optimal: 500 GB to 1 TB Video RAM – Minimum: 512 MB – Optimal: 1 GB or more 10
11 General Recommendations
General recommendations Standardization, added security, and virtual desktop 71% replace incompatible applications 12
Ensuring success / Easing the process Planning Training Pilot tests 13
14 Results of the Migration
Results of the migration 75% said process was smooth 56% said easier than last migration Most achieved key motivations Most ran into delays End-user satisfaction increased over time 15
Best vs. Worst Practices in Information Management Users offline 2 hours 60% of users extremely satisfied Differences 20 IT man-hours in preparation Extremely important: – Advanced planning (56% ) – Upgrading hardware (45%) – Pilot test (45%) – Training (44%) – Capture user profiles (42%) – Proper inventory (35%) Users offline 6 hours 25% of users extremely satisfied Differences 9 IT man-hours in preparation Extremely important: – Advanced planning (30% ) – Upgrading hardware (31%) – Pilot test (34%) – Training (26%) – Capture user profiles (27%) – Proper inventory (24%) Top tier resultsBottom tier results
17 Appendix All questions included
Expected use of Windows 7 18
User downtime 19
User downtime 20
Migration planning 21
Transition difficulty 22
Additional technologies 23
Delaying issues 24
Machine types 25
Machine types 26
Previous operating system 27
Influencing factors 28
When to upgrade 29
Economic impact 30
Current machines vs. new machines 31
Upgrading vs. fresh install 32
Communication 33
End user reaction 34
IT workforce involvement 35
Setting ROIs 36
Meeting ROIs 37
Affected factors 38
Minimizing cost 39
Successful migrations 40
Migration process 41
Automation vs. manual 42
Previous migrations 43
Previous migrations 44
Migration tools 45
Post-migration issues 46
Migration approaches 47
Migration approaches 48
Incompatible applications 49
Pre-migration captures 50
Helpful factors 51
Helpful factors 52
Pilot tests 53
Automatic vs. manual migrations 54
Hardware specifications 55
Hardware specifications / recommendations 56
Hardware specifications / recommendations 57
Hardware specifications / recommendations 58
Hardware specifications / recommendations 59
Hardware upgrades 60