Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.

Slides:



Advertisements
Similar presentations
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Sector Processor – to – Muon Sorter tests M.Matveev Rice University January 8, 2004.
Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
CSC Endcap Muon Port Card Status Mikhail Matveev Rice University.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Status of the CSC Track-Finder Darin Acosta University of Florida.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
CSC Endcap Muon Sorter Mezzanine Board Rice University July 4, 2014.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
RPC Upscope Meeting Jay Hauser 05 Feb 20101/11 Overview of the CSC Phase I Upgrade plans ME4/2 upgrade: 72 new large chambers for high-luminosity triggering.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
The CCB, TTC and so forth Paul Padley, Mike Matveev.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
The CMS Modular Track Finder (MTF7) Trigger Board D. Acosta, G. Brown, A. Carnes, M. Carver, D. Curry, G.P. Di Giovanni, I. Furic, A. Kropivnitskaya, A.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
OTMB Development and Upgrade Plan for LS2
CSC Hardware Upgrade Status
University of Wisconsin
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
Muon Track-Finder Trigger
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
Irradiation Test of the Spartan-6 Muon Port Card Mezzanine
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
TMB, RAT, and ALCT Status Report
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
TMB and RAT Status Report
CSC Trigger Meeting Summary
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
Muon Port Card Latency, October 2015
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012

April 23, 2012 CSC Trigger Upgrade Meeting 2 CSC EMU Electronics

April 23, 2012 CSC Trigger Upgrade Meeting 3 MPC Upgrade Requirements n Be able to deliver all 18 trigger primitives from the EMU peripheral crate to the upgraded Sector Processor (currently, only 3 LCTs out of 18 are delivered) n Preserve sorting capabilities of the Muon Port Card n Preserve 3 “old” 1.6Gbps optical links to the present CSC Track Finder

April 23, 2012 CSC Trigger Upgrade Meeting 4 Upgrade Developments n Use existing Muon Port Card main board - TMB interface remains unchanged (2 LCTs per 80MHz) - 3 “old” optical links are still available n First prototype ( ) was based on Virtex-5 FPGA - Expensive FPGA ($1610) - 12 external TLK2501 serializers - High power consumption - 2.4Gbps/channel data rate - one SNAP12 optical transmitter n Second prototype (2012) is based on Spartan-6 FPGA - Inexpensive FPGA ($280) - 8 embedded GTP serializers - 3.2Gbps/channel data rate - Modest power consumption - one SNAP12 optical transmitter

April 23, 2012 CSC Trigger Upgrade Meeting 5 Spartan-6 Mezzanine

April 23, 2012 CSC Trigger Upgrade Meeting 6 Old And New Mezzanines Installed Production MPC with Virtex-E mezzanine (2005) Upgrade prototype 1 Virtex-5 mezzanine (2011) Upgrade prototype 2 Spartan-6 mezzanine (2012)

April 23, 2012 CSC Trigger Upgrade Meeting 7 Status as of April 2012 ■ Three Spartan-6 mezzanines are installed on a spare production MPC boards; two of them are equipped with optical transmitter ■ Ran PRBS and FPGA-to-FPGA data transmission tests with SP10 Receiver at the University of Florida in April Board 1: - 2 channels out of 8 failed… soldering issue… fixed later - on remaining 6 channels: PRBS test OK, BER < per channel Random data patterns from FPGA to FPGA: ~66K iterations, 510 words each; no errors Board 2: - All 8 channels OK; PRBS transmission OK; Random data patterns from FPGA to FPGA: 1K iterations, 510 words each; no errors ■ Tested with 9 TMBs in the peripheral crate; same “safe window” as production board

April 23, 2012 CSC Trigger Upgrade Meeting 8 Latency Measurements ■ Present system at CMS: 580 ns - TLK2501 Transmitter (80MHz) ~23 ns m optical MMF fiber ~500 ns - TLK2501 Receiver (80MHz) ~57 ns ■ New system (prototypes): 589 ns - Spartan-6 GTP Transmitter (3.2Gbps) ~20 ns (without Tx buffer, measured) m optical MMF fiber ~500 ns - Virtex-6 GTX receiver (3.2Gbps) ~69 ns (without Rx buffer, estimate)

April 23, 2012 CSC Trigger Upgrade Meeting 9 Other Measurements ■ Power consumption: - Spartan-6 FPGA ~1A Vccint (1.2V) ~0.15A Vccaux+Vcco (3.3V) ~ 0.8A GTPs (1.2V) - MPC (main board + mezzanine) 3.3V

April 23, 2012 CSC Trigger Upgrade Meeting 10 Irradiation Test of Spartan-6 FPGA ■ Planned for summer 2012 ■ 5 to 15 seconds between SEU, more frequent with higher flux ■ Average dose to get an error is ~12 rad. With the average flux of ~10 7 protons/cm 2 /s, the cross section of SEU is ~10 -8 cm 2 per device. ■ Assuming 10-year fluence of ~10 11 neutrons per cm 2 [1] at full LHC design luminosity, the worst case SEU rate would be cm 2 x neutrons/cm 2 / 10 8 sec = 10 -5, or 1 SEU in ~ 3 hours per MPC [1]

April 23, 2012 CSC Trigger Upgrade Meeting 11 Production Cost Estimate Spartan-6 Mezzanine FPGA$280 SNAP12 Transmitter$500 Other components$300 Fabrication and Assembly$400 Total$1,480 ● Optical cable with 12 fibers, 100 m - $429 ● Will need 80 mezzanines and 120 optical cables (including one spare per peripheral crate)

April 23, 2012 CSC Trigger Upgrade Meeting 12 MPC Upgrade Plans ■ Continue testing of the existing Spartan-6 and SP10 prototypes - test stands at Rice and UF for firmware and hardware developments - have 2 Muon Port Cards with new Spartan-6 mezzanines and one SP10 board with Virtex-6 receiver - continue data transmission tests at UF in April-May ■ Proceed with the Spartan-6 pre-production prototype design - replace connector to optical plug-in card with more reliable (similar to one used on SP10 board) - minor schematic and layout fixes - complete schematic in September - produce and test 3 prototypes by December 2012 ■ Production and Installation - integration tests with the new SP board in the 1 st half of fabrication and tests of 80 mezzanine boards – 2 nd half of equip all MPC boards with new mezzanines, re-work front panels, re-test boards – end early install at CMS – spring 2014