Booster L12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
Progress of the BEPCII Injection System Kang Wen.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
PIP Update Aug 15 th Agenda Summary Update – Current Activities Dennis Barak / Kiyomi Seiya - High-Power Ferrite Testing Ryan Crawford - Linac and.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
Hanford Status Slides. Cask/Transportation System Fabrication of Casks complete (5 total) Delivery of 3 (of 5) trailers complete MCO Loading System (MLS)
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
Booster Beam Notching Overview for 2012 S. Chaurize December 7, 2011.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
1 April 30, 2015 PXIE Fabrication Update Matt Hoff LBNL April 30, 2015 Daughter and Son to Work Day April 23, 2015 Ari and Kwin, my wife’s cousin’s kids.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
STATUS OF NOKER PULSER FOR SHORT MAGNETS C. C. JENSEN DECEMBER 4, 2013.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Booster Beam Notching Installation Update PIP Talk Salah Chaurize February 20, 2013.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Upgrading 600L/s IPPS Gustavo Alverio University of Central Florida August 5, 2003.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
PIP Wednesday March 21, /21/12 Agenda Project Update(s) Pellico - PIP Status Talk(s) 1.Ryan Crawford: Linac Power Distribution - Shutdown 2012 activities.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
PIP Update Dec 17 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
PIP Update Talk Booster Notched Beam Kicker Pulser General Talk The Long and Short of It S. Chaurize October 24, 2012.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
ActivRACTM 30P Mobilized Storage System
KICKER STATUS G-2 meeting March 5, 2014
Polarized 3He target installation
Presentation transcript:

Booster L12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize

Current Status L12 Noker Systems Tunnel Prep work 85% Complete Two of three Noker kicker magnets have been rotated using new magnet angle brackets and end plates. Third magnet will be rotated this week. Maintenance work in progress on kicker load resistors. Charging resistor module need component fabrication. L12 Noker power supply systems controls migration completed and tested. Working on timing/trigger module installation for Noker Thyratron firing. New Thyratron cabinet construction in progress.

Before After Noker and MKS04 Racks

East Gallery Thyratron Cabinets

Load Resistors And Charging Resistor Box

Rotated Magnet support plates.

Current Status L13 Absorber Systems Tunnel prep work 90% Complete Floor and wall marking to be laid out to show foot print of K and L Blocks and wall shielding support section locations. Small concrete blocks have been painted by AD Techs. Machined Beam tube and liner components in hand at Meson Assembly Building. Preassemble of components in progress. V. Sidorov is refining design details for aisle side beam kick configuration. V. Sidorov is overseeing preassembly efforts by PPD Techs. So far parts are going together as planned. Liner parts are heavy precision milled components.

Vacuum Liner

Moving block support plates.

Moving block assembly parts

Preassembly process at MAB

Booster Long 13

Illustration of Wall shielding and blocks in tunnel