Proton Improvement Plan William Pellico 44th Fermilab Users' Meeting June 1-2, 2011.

Slides:



Advertisements
Similar presentations
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Advertisements

Proton Source Task Force Directorate's Meeting Tuesday, October 5 W. Pellico.
PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
PIP Update June 26 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Proton Improvement Plan (PIP) William Pellico PIP and MI 700 kW review 21 – 22 January 2015.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
F Project X Overview Dave McGinnis October 12, 2007.
Proton Improvement Plan Bob Zwaska July 7, 2014 All-Experimenters Meeting.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Proton Improvement Plan Accelerator Sector Planning and Strategy Oct. 27 and 28 W. Pellico Bob Zwaska, Keith Gollwitzer, Fernanda Garcia Valery Lebedev,
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Sept. 18 th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Pat.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP FY15 Q4 Report W. Pellico PIP PMG November 5 th 2015.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Proton Improvement Plan William Pellico Fermilab Institutional Review June 6-9, 2011.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
Proton Improvement Plan (PIP) William Pellico Fermilab Annual Science and Technology Review September 5-7, 2012.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Proton Source Task Force William Pellico Mu2e Working Group Meeting (WGM) on Wednesday, Jul 21.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI ISIS Developments David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Proton Economics Eric Prebys FNAL Accelerator Division.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI
The SPL-based Proton Driver at CERN
Presentation transcript:

Proton Improvement Plan William Pellico 44th Fermilab Users' Meeting June 1-2, 2011

Outline Introduction Proton Source Review Proton Source Improvement Plan Current Proton Source Projects and Effort Conclusion 44th Fermilab Users' Meeting, June 1-2,

Introduction 44th Fermilab Users' Meeting, June 1-2, The Fermilab Proton Source (PS) consists of: The Pre-Acc, Linac, and 8 GeV Booster accelerators Three transport lines Three beam absorbers Two low energy beam facilities The Neutron Therapy Facility The Muon Test Area Designed and built over 40 years ago, the Proton Source remains largely unchanged. The ability to deliver 8 GeV protons has been essential for successes of the Run II, neutrino, and test-beam programs. These machines are expected to deliver ever higher performance to support the laboratory’s experimental High Energy Physics objectives for the next decade or longer.

Proton Source Review Pre-Acc/Linac A 400 MeV negative hydrogen ion accelerator comprising:  25 keV H-minus magnetron ion source  Two 750 keV electrostatic Cockcroft Walton accelerators  116 MeV, MHz drift-tube (Alvarez) linac  805 MHz side-coupled cavity linac to 400 MeV Booster 8 GeV, 15 Hz synchrotron with a 474 meter circumference.  Using multi-turn injection and a stripping foil, 400 Mev Beam is injected into the Booster from the Linac via the 400 MeV transport line.  Booster accelerates the beam from 400 MeV to 8 GeV in about 35 milliseconds.  Booster 8 GeV proton beam is extracted down the MI-8 line for the Main Injector or the 8 GeV neutrino experiments 44th Fermilab Users' Meeting, June 1-2,

Pre-Accelerator Linac Booster 44th Fermilab Users' Meeting, June 1-2, Proton Source Review – PS Layout MTA NTF

Proton Source Review – Basic Hardware 44th Fermilab Users' Meeting, June 1-2, MHz Alvarez LE Accelerating Cavity 800 MHz Klystron High Energy Linac Cockcroft-Walton H- Booster Gradient Magnet Booster RF Cavity

Proton Source Improvement Plan (PIP) A recognition that, until the Project-X linear accelerator is operational, the entire domestic accelerator-based high-energy physics program is powered by the 40+ year old Proton Source. Despite age-related issues of reliability and availability of spare components, demands on the Proton Source continue to increase. Experiments that have received Fermilab PAC approval or are in the DOE CD-process expect a factor of two increase of the current proton delivery rate within the coming decade. 44th Fermilab Users' Meeting, June 1-2,

8 Proton Source Improvement Plan (PIP) Proton source throughput goals for the next decade. Present Proton Flux

Proton Source Improvement Plan (PIP) 44th Fermilab Users' Meeting, June 1-2, Beam repetition rate goals through the next decade Present Beam Cycle Rate

44th Fermilab Users' Meeting, June 1-2, Proton Source Improvement Plan Goals The goals of the Proton Improvement Plan are to: o Increase the beam repetition rate from the present ~7 Hz to 15 Hz o Eliminate major reliability vulnerabilities and maintain reliability at present levels (>85%) at the full repetition rate o Eliminate major obsolescence issues o Increase the proton source throughput, with a goal of > 2E17 protons/hour o Ensure a useful operating life of the proton source through at least 2025

Proton Source Improvement Plan Scope The scope of the Proton Improvement Plan includes: o Upgrading or replacing components required to reach the Booster 15 Hz repetition rate o Replacing components that risk poor reliability o Replacing obsolete or soon to be obsolete components o Doubling the 8 GeV Beam Flux o Studying beam dynamics to diagnose performance limitations and develop mitigation strategies o Implementing operational changes to reduce beam loss o Beam flux will be increased by cycle rate not by increased cycle intensity 44th Fermilab Users' Meeting, June 1-2,

o The Cockcroft-Walton system o Drift Tube Linac RF Power Systems o Booster RF Solid State Program o Booster RF Cavities, Tuners, Anode Supplies, and Bias Supplies o Beam Instrumentation and Controls o Linac and Booster Conventional Systems o Vacuum system upgrades o Booster Gradient Magnet Spares 44th Fermilab Users' Meeting, June 1-2, Proton Source Improvement Plan Scope – Major Items/Categories

Current Proton Source PIP Work Underway Pre-Acc and Linac Cockcroft Walton Replacement  Started FY09 using operating funds  Completion set date June FY12 Linac Dump Repair Linac Optics High Power RF MHz Drive System Buildup of 7835 Power Tube Inventory Booster Solid State RF Power Drivers  First solid state system installed FY04  Solid state project tasks started FY06  4 of 19 solid state stations now installed Collimator System Review Cogging System Upgrade Booster Orbit/Aperture Work Fast Kicker (Built – Testing) Booster Gradient Magnet  Build Spare Inventory  Prepare Required Hardware 44th Fermilab Users' Meeting, June 1-2,

The timeline for the implementing PIP depends upon: 1. Funding 1. M&S funding profile 2. Capturing engineering design effort to match the M&S profile 2. Manpower 1. Identifying qualified personnel 2. Committing key personnel to the effort for several years 3. Project Development 1. Reaching sound technical solutions to challenging and expensive problems that are now just in a pre-conceptual stage 4. Operational Beam Constraints 1. Integrating necessary machine studies and shutdowns with ongoing operational commitments 44th Fermilab Users' Meeting, June 1-2, Proton Source Improvement Plan Timeline Constraints

Proton Source Improvement Plan Initial M&S Cost Estimates (Millions of $) o Project Management-- o DTL High Power RF System 13 o Pre-Acc RFQ Completion.750 o New Booster RF Cavities 18 o Booster Tuner System Upgrade2 o Doubling beam throughput (Physics)-- o Collimator system1.5 o Instrumentation and Control1.5 o BRF Anode and Bias supplies & test stand 1.7 o Booster Solid state systems 3.7 o Conventional Systems Upgrades 2.3 o Vacuum System Upgrades.4 o TOTAL44.85 B est-effort cost estimates based on experience and recent similar procurements. Estimates for the larger cost elements should be considered as appropriate at the conceptual level 44th Fermilab Users' Meeting, June 1-2,

Proton Source Improvement Plan FY Funding Profile Guidance YearM&S Funding (Millions) FY126.2 FY136.2 FY FY FY166.4 These numbers were provided as guidance for PIP planning. Some items in the plan are ready to be procured even in FY11. Areas that require additional design/engineering work must be allocated labor resources consistent with the out-year M&S profile. 44th Fermilab Users' Meeting, June 1-2,

Labor estimates were developed by the responsible support departments and based upon current work. As with the cost estimates, labor estimates for the large projects are just in the initial planning stages and should be considered as a first pass estimates. o Project Management9 o DTL High Power RF System Phase 50 o Pre-Acc RFQ Completion10 o New Booster RF Cavities 39 o Booster Tuner System Upgrade6 o Doubling beam throughput (Physics)8 o Collimator system7 o Instrumentation and Control15 o BRF Anode and Bias supplies & test stand 6 o Booster Solid state systems 9 o Conventional Systems Upgrades 5 o Vacuum System Upgrades 6 o TOTAL (Units FTE years)170 44th Fermilab Users' Meeting, June 1-2, Proton Source Improvement Plan Labor Estimate

Proton Improvement Plan Bill Pellico Bob Webber, Deputy Bob Zwaska, Deputy Booster RF John Reid Solid State Tom Kubicki Anode PS Rene Padilla Cavities Joe Dey Tuners Bias Supplies Spare Cavity Mike May Cavity Test Stand Linac RF Ralph Pasquinelli PreAccelerator C. Y. Tan 200 MHz HLRF Ralph Pasquinelli Linac Modulators Fernanda Garcia Power Distribution Steve Hayes Linac and Booster Power Distribution Equipment Steve Hayes Booster Power Distribution Duct Steve Hayes Proton Source Utilities Todd Sullivan Linac Vacuum Systems Booster Vacuum Systems 95LCW System Maurice Ball Booster Sumps Todd Sullivan Other Utilities / FESS Todd Sullivan Instrumentation & Controls Craig Drennan Linac Controls Craig Drennan Booster Controls Craig Drennan Beam Physics Valeri Lebedev Linac Linac Front End and Emittance Control C. Y. Tan Linac Lattice and Collimation Dave McGinniss Linac Notch Creation Jim Lackey 400 MeV Optics Matching Fernanda Garcia 400 MeV Collimation Valeri Lebedev Booster Booster Cogging Kiyomi Seiya Booster Notcher Jim Lackey Booster Collimation Nikolai Mokhov Booster Orbit and Alignment Kiyomi Seiya Booster Instabilities & Feedback Booster Optics Injection Painting Radiation Shielding Peter Kasper Initial PIP Management Laboratory Management is in the process of allocating labor resources – post Collider. The time critical areas have been identified and there has been a concentrated effort to allocate labor to those sections of the PIP.

Upgrade Success - Historical Performance 44th Fermilab Users' Meeting, June 1-2, Proton Improvement Examples: Booster Collimators FY04 Booster Low Level/Damping FY04 New Booster Injection Line FY FY06 Removal of L13 Extraction Region FY07 Linac Quad PS FY07 Linac Low Energy Low Level FY08 New Ramped Correctors FY09 Record Year FY10

The Proton Source has faithfully served the needs of the Fermilab program for more than 40 years. Demands for doubling the proton throughput with continued highly reliable operation necessitate a dedicated program of improvements to secure the viable operation of the Proton Source for the next 15+ years. A plan at the level of 45M$ M&S over the next five fiscal years has been developed. Staffing at the level of ~33 FTEs per year is required to carry out the plan. Improvement Plan funds must be in addition to the current annual operating funding for the plan to be successful. References [1] A Plan for Delivery of 8-GeV Protons through 2025, Beams-doc-3781, [2] Proton Source Task Force Report, Beams-doc-3660, [3] Proton Source December 2010 Workshop, 44th Fermilab Users' Meeting, June 1-2, Proton Source Improvement Plan Summary