2009 Hurricane Preparedness Richard Shaheen Sr. Director, Engineering & Technical Services May 6, 2009.

Slides:



Advertisements
Similar presentations
Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
Advertisements

FPUA Storm Readiness 2007 Florida Public Service Commission Internal Affairs May 23, 2007 Craig Brewer- Superintendent of Electric T&D.
Storm Preparedness Workshop Verizon Florida, LLC May 23, 2007.
May 23, STORM PREPAREDNESS EMBARQ – FLORIDA, INC. Sandra Khazraee – Regulatory Manager.
Lee County Electric Cooperative 2006 Hurricane Preparedness Plan.
Hurricane Season Preparedness Briefing Gulf Power Company June 5, 2006.
Progress Energy Florida 2007 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 23, 2007.
Florida Public Service Commission Internal Affairs Hurricane Season Preparation Paul Davis, Director Energy Control Center June 5, 2006.
JEA Storm Readiness 2006 Florida Public Service Commission Internal Affairs June 5, 2006 Presenter: Ted Hobson, VP, Fuels, Purchased Power & Compliance.
FPL Hurricane Assessment Operating Committee January 25, 2005.
Westar Energy Emergency Preparedness and Restoration TFR Meeting June 26, 2012 Jim Tyler Director, Distribution Services.
2011 Windstorm “Be Prepared: Preventing Disaster/ Planning for Recovery” South Bay Cities Council of Governments 13 th Annual General Assembly February.
Facilities Management Post Hurricane Building Assessment and Recovery June 28, 2007.
Emergency Management in Washington State: Our Capabilities, Our Challenges.
Feeder Maintenance Program. The purpose of the Cooperative is to provide safe, reliable, low-cost energy services in fiscally responsible partnership.
What Should Counties Be Doing Now to Prepare? Ray Runo, Director Office of Emergency Operations Florida Department of Health
1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.
 New Zealand Earthquake New Zealand Earthquake  6.3 Magnitude Earthquake  185 Deaths  injuries  Over 1,400 buildings were red or yellow tagged.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
Office of the Surgeon General Medical Reserve Corps September 17, 2004.
United Parcel Service Crisis Management. 2 UPS Network Planning Group Founded: August 28, 1907, in Seattle, Wash., USA World Headquarters: Atlanta, Ga.,
Introduction & Opening Remarks l Hurricanes of 2004 & 2005 highlight the need for a fresh look at these issues l We support this effort and will be active.
Florida Power & Light 2006 Hurricane Preparedness Plan June 5, 2006 Presented by: Geisha Williams.
January 2009 SEMO Ice Storm Extreme Measures IEEE-PES St Louis Chapter Meeting June 18, 2010 Presented by David Wakeman Vice President, Energy Delivery.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
FPSC Electric Utility Infrastructure Workshop Florida Municipal Electric Utilities Alan Shaffer Assistant General Manager - Delivery Lakeland Electric.
Florida Municipal Electric Utilities May 6, 2009 Paul Kalv, Director City of Leesburg Electric Department Florida Public Service Commission Docket No.
1 Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 6, 2009.
1 © AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Florida Public Service Commission’s.
Tampa Electric Company 2009 Hurricane Season Preparation Regan Haines Director, Energy Delivery May 6, 2009.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2014 Hurricane Season Preparation Informal Meeting for Electric Utilities with Florida Public Service Commission Staff March 26, 2014.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Hurricane Season Preparation Briefing Florida Public Service Commission May 1, 2008 Kevin Wailes General Manager – Electric Utility.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
Public Power in Florida Mutual Aid and Storm Readiness Barry Moline Executive Director Florida Municipal Electric Association ,
2009 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 6, 2009.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
2015 Storm Readiness Report Kurt Miller, Director of Engineering Suwannee Valley Electric Cooperative, Inc.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
May 6, STORM PREPAREDNESS EMBARQ – FLORIDA, INC. Sandra Khazraee – Regulatory Manager.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 1, 2008.
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
Informal Meeting with FPSC Staff 2015 Hurricane Season Preparation March 18, 2015.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
City of Sarasota Franchise Agreement Rae Dowling, Buck Martinez and Ken Rubin June 16, 2010.
1 Pepco Emergency Restoration Organization. 2 STORM RESTORATION OVERVIEW Customer Information Call Center VRU Farm (New) CIS EMS TPS/ Distribution System.
Utility Needs and Smart Grid for Major Storm Events
Florida Public Service Commission’s 2007 Storm Preparedness Workshop
2008 Hurricane Season Preparations
Public Power in Florida Mutual Aid and Storm Readiness
Florida Public Service Commission
EMBARQ – FLORIDA, INC STORM PREPAREDNESS May 1, 2008
HURRICANE MATTHEW AFTER ACTION REPORT.
Hurricane Preparedness Plan 2008
Pacific Power Seismic Preparedness Update
Progress Energy Florida 2008 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 1, 2008.
Impacts and Actions Resulting from the August 14, 2003 Blackout
2007 Hurricane Season Preparations
Progress Energy Florida 2006 Hurricane Preparedness Florida PSC Internal Affairs Meeting June 5, 2006.
Florida PSC 2014 Hurricane Season Preparation
Florida PSC Hurricane Preparedness Meeting May 6, 2009
2007 Hurricane Season Preparedness Briefing
Presentation transcript:

2009 Hurricane Preparedness Richard Shaheen Sr. Director, Engineering & Technical Services May 6, 2009

2 Continue to strengthen the infrastructure Prepare the storm organization Refine the restoration plan Enhance communications 2009 Preparations FPL’s Hurricane Preparedness Plan Infrastructure OrganizationCommunication Restoration

3 3-Prong approach CIF Acute Care & Hospitals Centers35 -Highway Crossings40 -‘01’ Switches53 -EOC/Police/Fire 4 Community projects 11 New Design Guidelines (new construction) Continue to Strengthen the Infrastructure Distribution Hardening Infrastructure Communication Communication Organization Restoration

4 Replace all wood structures Replace ceramic post insulators 2009 – replace over 900 wood structures and 400 ceramic post insulators Continue to Strengthen the Infrastructure Transmission Hardening Infrastructure Communication Communication Organization Restoration

5 Continue to Strengthen the Infrastructure Distribution Pole Inspections Infrastructure Communication Communication Organization Restoration FPL owns over 1.1 million poles Inspecting 1/8 of poles each year Approximately 1/3 of first cycle completed Working throughout entire FPL system

6 Continue to Strengthen the Infrastructure Transmission Pole Inspections Infrastructure Communication Communication Organization Restoration 64,000 structures system-wide On-going 6-year cycle Inspect at least 1/6 of system in 2009 Before June 1, 2009, inspect all critical 500kV lines & facilities serving CIF

7 Continue to Strengthen the Infrastructure Distribution Vegetation Management Feeders - 3-year average trim cycle Laterals - 6-year average trim cycle Before June 1 - clear Top CIF Encourage “Right Tree - Right Place” Infrastructure Communication Communication Organization Restoration

8 Continue to Strengthen the Infrastructure Transmission Vegetation Management Cleared 100% of transmission right of way in 2008 Same plan for 2009 Infrastructure Communication Communication Organization Restoration

9 Prepare the Storm Organization Infrastructure Communication Communication Organizatio n Restoration Roles identified and staffed Training updated Training conducted Forensic teams ready Annual Preparations

10 Refine the Restoration Plan Infrastructure Communication Communication Organization Restoration Safely restore in shortest time Resource plans in place –Logistics –Foreign utilities & contract crews –Inventories Applied lessons learned Refined recovery plan

11 Enhance Communications Infrastructure Communication Communication Organization Restoration FPL / County EOC meetings Increased governmental & community communications More detailed estimated restoration times

12 Areas of Concern or Vulnerability Hardening - Multi-Year Effort Multiple Storms Catastrophic Storms Insufficient Resources Infrastructure Organization Communication Restoration

13 Infrastructure strengthened –Hardening; Pole inspections; Vegetation Organization prepared –Trained and ready Restoration plan tested & refined –Lessons learned; Technology; Forensics Communications enhanced –Better information Hurricane Preparedness Plan 2009 Summary Infrastructure Organization Communication Restoration