ECE 477 Final Presentation Team 4  Spring 2011 Petra M. Alex B. Alex G. Kim S.

Slides:



Advertisements
Similar presentations
ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
Advertisements

ECE 477 Final Presentation Team 6  Spring 2010 Digital Sound Projection.
ECE 477 Final Presentation Team ??  Fall 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 10  Spring 2008 Paul Ng Daniel Bixby Matt Ligocki David Collins Paul Ng Daniel Bixby Matt Ligocki David Collins.
ECE 477 F INAL P RESENTATION T EAM 10  S PRING 2013 Ruiyang Lin Vipul Bhat Julia Liston Krithika Iyer.
ECE 477 Design Review Team 7  Spring 2011 Paste a photo of team members here, annotated with names of team members. Stuart Pulliam Will Granger Linda.
ECE 477 Final Presentation Team 15  Spring 2013 Andrew Batek, Jackson McCormick, Carey Woolet, Justin Lindley.
ECE 477 Final Presentation Team 03  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 FINAL PRESENTATION TEAM 7  SPRING 2013 COST ROBOT ERIC OSBORNE, BRYAN DALLAS, ANDREW LOVELESS, CAROLINE TRIPPEL.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
ALEX BUSCHKOETTER ALEX GLENN KIMBERLY SOONG PETRA MUSTAFA Group 4: 3MS.
ECE 477 Final Presentation Team 16 − Spring 2013 Scott Stack Neil Kumar Jon Roose John Hubberts.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Final Presentation Team 7  Spring 2011 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Final Presentation Team 20  Spring 2013 Jordan Wagner Justin Spencer Mark Sears John Jachna.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Final Presentation Final Packaged Design.
ECE 477 Final Presentation Group 14  Spring 2005 BENNY PARICHEY RAKESH ANUBHAV.
ECE 477 Final Presentation Team 12  Spring 2010 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
ECE 477 Final Presentation Team 14  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 1  Fall 2006 Sumanth Peddamatham Alex Tucker Chris Arges Radhika Mulani.
ECE 477 Final Presentation Team 5  Fall 2009 Left to right: Ben, Dennis, Jacqui, Ian.
ECE 477 Final Presentation Team 21 - Spring 2013 Team Members: Duncan Swartz, Jacqueline Greer, Tom Pansino, Mark Tubergen.
ECE 477 Final Presentation Group 3  Spring 2005 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 12  Spring 2013 Xirong Ye Zongyang Zhu Chun Ta Huang Libo Dong.
ECE 477 Final Presentation Team 1  Spring 2012 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 14  Spring 2012.
ECE 477 Final Presentation Team 14  Spring 2010.
ECE 477 Final Presentation Group 10  Spring 2005 Jer-Wei Lam (Sean) Jacinto Chang Ming Sum Wong Kevin Muthuri Team Lead Web:
ECE 477 Final Presentation Team 18  Spring 2013 Derek Pesyna, Tim Brown, Evan Foote, Doug Wile.
ECE 477 Final Presentation Group 2  Spring 2005 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Final Presentation Team 01  Spring 2014 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Final Presentation Team 4  Spring Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Final Presentation Team 9  Spring 2011 Above (Left to Right): Nick Gentry, Oliver Staton, Vineet Ahuja, and Vinayak Gokhale.
ECE 477 Design Review Team 4  Spring 2006 Justin Thacker, Matt Kocsis, Ian Snyder, Dustin Poe.
ECE 477 Final Presentation Team 2  Spring 2010 Caleb Ayew-ew Josh Long Katie Schremser The Digi-Brush.
1 © 2008 RoboRubik ECE 477 Final Presentation Team 11 – Spring 2008 Tyler Heck Dave Bukiet Erik Carron Casey Kloiber.
ECE 477 Final Presentation Team 1  Spring 2013 Zelun Tie Xin Jin Ranmin Chen Hang Xie.
ECE 477 Final Presentation Team 3  Fall 2012 Daniel Carolyn Jonathan Mihir Stein McMican Kuntzman Shah.
ECE 477 Final Presentation Team 01  Spring 2010 Mike Wei Jon SchwarzCarlo Mesina Bill Bergquist.
 Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration  Questions / discussion.
V i t a l i s Wireless Biometric Sensor ECE 477 Final Presentation Team 13  Spring 2013 Paste a photo of team members with completed project here. Annotate.
ECE 477 Final Presentation Team 2  Fall 2010 Shannon Abrell Ben Laskowski Andrew Phillips Rob Swanson.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Final Presentation Team 13  Spring 2012 Martin Pendergast, Stephen Edwards, Nick Kwolek, David Duelmler.
ECE 477 Final Presentation Team 4 Spring Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Final Presentation Team 22  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 01  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Final Design Review
ECE 477 Final Presentation Team 13  Spring 2008 Varun Srichand Anvesh Madhu.
ECE 477 Final Presentation Team 9  Fall 2009 DART.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
<Add team picture or relevant project picture here>
<Add team picture or relevant project picture here>
ECE 477 Final Presentation Team 04  Spring 2010
ECE 477 Final Review: Team #
ECE 477 Final Presentation Team 10  Spring 2008
ECE 477 Final Presentation Team 4  Fall 2010
ECE 477 Final Presentation Team 1  Spring 2008
ECE 477 Senior Design Group 4  Spring 2011
ECE 477 Final Presentation Team 13  Spring 2011
Presentation transcript:

ECE 477 Final Presentation Team 4  Spring 2011 Petra M. Alex B. Alex G. Kim S.

Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges Individual contributionsIndividual contributions Project demonstrationProject demonstration Questions / discussionQuestions / discussion

Project Overview 3MS: Mobile Multi-Point Monitoring System Three main features: Proximity detection and displayProximity detection and display Base and peripheral distance alertsBase and peripheral distance alerts Peripheral wristband tamper detectionPeripheral wristband tamper detection Inspired by a baby monitor and virtual leash.

Block Diagram Base Control

Block Diagram Peripheral Module

Design Challenges Schematic and PCB Design errorsSchematic and PCB Design errors Battery lifeBattery life Datasheet errors and/or misunderstandingsDatasheet errors and/or misunderstandings Audio transmissionAudio transmission

Individual Contributions Team Leader – Alex BuschkoetterTeam Leader – Alex Buschkoetter Team Member 2 – Alex GlennTeam Member 2 – Alex Glenn Team Member 3 – Kimberly SoongTeam Member 3 – Kimberly Soong Team Member 4 – Petra MustafaTeam Member 4 – Petra Mustafa

Team Leader – Alex B. SchematicSchematic PCB DesignPCB Design Hardware debuggingHardware debugging Soldering and trace correctionsSoldering and trace corrections

Member 2 – Alex G. PCB Layout and Trace debuggingPCB Layout and Trace debugging Software design and implementationSoftware design and implementation

Member 3 – Kimberly S. PowerPower SolderingSoldering Hardware debuggingHardware debugging

Member 4 – Petra M. SchematicSchematic PCB Design and LayoutPCB Design and Layout –Host board –Peripheral board 4 layers4 layers PackagingPackaging –AutoCAD

Project Demonstration 1.An ability to detect proximity using RSSI 2.An ability to detect and report the violation of dynamically specified distance thresholds on all devices 3.An ability to monitor and display remaining battery life 4.An ability to detect and report peripheral tampering 5.An ability to interface to an LCD to control and monitor the device

PSSCs Demonstration

Questions / Discussion