Presentation is loading. Please wait.

Presentation is loading. Please wait.

ECE 477 Final Presentation Team 04  Spring 2010

Similar presentations


Presentation on theme: "ECE 477 Final Presentation Team 04  Spring 2010"— Presentation transcript:

1 ECE 477 Final Presentation Team 04  Spring 2010
Paste a photo of team members with completed project here. Annotate this photo with names of team members.

2 Outline Project overview Block diagram Design challenges
Individual contributions Project demonstration Questions / discussion

3 Project Overview Laser Tag System with Additional Features
Multiple firing modes RF communication Video Game Style Power-ups Consists of Two Portable Packs & Base

4 Block Diagram - Base

5 Block Diagram - Portable

6 Design Challenges Long distance IR communication
RF collision and communication protocol Battery power (especially for high current LED drive) Packaging to withstand high adrenaline gameplay Innovative bonus features

7 Individual Contributions
Team Leader – Ben Moeller Team Member 2 – Emily Blount Team Member 3 – David Freidin Team Member 4 – Michael Niksa

8 Team Leader – Ben Moeller
Design and implementation of gun housing and base station IR communication hardware design Layout of off-board electronic components Assembled PCB and made cables Packaging design homework Patent liability analysis homework

9 Member 2 – Emily Blount Schematic Drawing and Block Diagram
Website Updates Vest Design and Implementation Sensor Pod Design and Implementation Wiring between pods and gun Testing and Troubleshooting Hardware Design Homework Environmental and Ethical Concerns Homework

10 Member 3 – David Freidin PCB Design and Layout
RF Communication Software IR Communication Software Game Logic Software Testing and Debugging Reliability and Safety Analysis PSSC Demo Video

11 Member 4 – Michael Niksa RF Communciation Research
Low-level Hardware Drivers Microcontroller Prototyping Schematic & PCB Layout Checking Block Diagrams Design Constraint Analysis Overall Software Design Considerations Software & Hardware Debugging

12 Project Demonstration - PSSCs
An ability to wirelessly transmit a shot and receive a hit via Infrared An ability to remotely enable and disable the gun/vest pair An ability to control game operation using base station keypad An ability to wirelessly communicate game statistics to base station via RF An ability to provide user with local display of game information

13 Project Demonstration - Video

14 Questions / Discussion


Download ppt "ECE 477 Final Presentation Team 04  Spring 2010"

Similar presentations


Ads by Google