1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km 12.34 of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’

Slides:



Advertisements
Similar presentations
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
Advertisements

Crop as Damaged by Pond previously Crop as Damaged by Pond previously.
LORD Addl. PD, DRDA, BOLANGIR Presentation by HARISHANKAR.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Pranahita – Chevella Project PHASE - II
Welcome Chhattisgarh 1.
ANNUAL WORK PLAN & BUDGET JHARKHAND MID DAY MEAL SCHEME.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
IWMI Anik Bhaduri, Upali Amarasinghe, Tushaar Shah, BK Anand Benefits and Cost of Irrigation Water Transfers: A case study of Polavaram.
Neotech Institute of technology Department of Civil Engineering
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
RAVINDRA THOSAR RATE AGREEMENT TEAM.  Floods and drought have become a recurring problem in India and the project is aimed at improving the situation.
Hydro Electric Power Plant
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
1 Mid Day Meal Scheme Ministry of HRD Government of India MDM-PAB Meeting – TRIPURA On
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
Budget allocation and release of funds to implementing agencies under ADIP Scheme S.NoFinancial Year Budget Estimate (Rs. In crores) Amount Released (Rs.
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
AWP Performance (Upto Dec 2010)[ Primary] Financial Year No of Institution s EnrolmentPAB Approval Coverage% of PAB Approval %
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
1 1 STRATEGIES FOR ENHANCING FOOD GRAIN PRODUCTION Formulation of Krishi Karman Award Department of Agriculture MANIPUR.
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
FACTS AND FIGURES OF CHHATTISGARH State capitalRaipur Latitude17°46' N to 24°5'N Longitude80°15' E to 84°20' E Geographical Area in Sq. Km135,000 Forest.
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
1. How to write a percent as a decimal…  Divide the percent by 100 or move the decimal point two places to the left 2.
WATER RESOURCES DEPARTMENT
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
Mesopotamia: Cradle of Civilization. Geography of the Fertile Crescent The Valleys of the Tigris and Euphrates river`s were the site of the world's first.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
Mid Day Meal Scheme In Chhattisgarh. FACTS AND FIGURES OF CHHATTISGARH Total population Male Female Literacy rate 71.04% Population.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
PRESENTATION BY K. Manicka Raj, IAS., Commissioner Municipal Corporation, Rajahmundry RESILIENT INFRASTRUCTURE.
:: Presented by :: (Rohit Gupta) DPC (Mahatma Gandhi NREGA) & District Collector Udaipur Mahatma Gandhi NREGA Udaipur.
KALABAGH DAM PROJECT General Reservations of Provinces on KBD Feasibility PROJECT BY RABIA RASHEED SHEHRBANO AKBAR ZIL-E-HUMA AKBAR.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
Mid Day Meal Scheme MDM-PAB Meeting – GUJARAT On
Hyderabad city water supply system
Geography and the Fertile Crescent
Presentation on Ken – Betwa Link Project-Phase-II
Cradle of Civilization
PRESENTATION ON KALESHWARAM PROJECT
Review of CADWM Projects Under PMKSY
Mid Day Meal Scheme MDM-PAB Meeting – Chattisgarh on
Mid Day Meal Scheme MDM-PAB Meeting – Assam On
Mid Day Meal Scheme MDM-PAB Meeting – Daman & Diu on
Mid Day Meal Scheme MDM-PAB Meeting – WEST BENGAL On
Mid Day Meal Scheme MDM-PAB Meeting – MADHYA PRADESH On
MDM-PAB Meeting – Kerala
In India around 70% of total population lives in Rural area
PAB Meeting on National Portal for Mid Day Meal Scheme
Presentation transcript:

1 VENKATANAGARAM PUMPING SCHEME

2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’ – 30” N  Near Katheru village  5 km from Rajahmundry

3 SALIENT FEATURES Water proposed to be lifted cumecs. Ayacut proposed to be irrigated - 36,000 Acs. Drinking water facilities to 1,20,000 population in 28 villages.

4 ADMINISTRATIVE APPROVAL Administrative approval was accorded vide G.O.Ms.No.135, dt Sanctioned estimate no.& amount CR.No.49/ , dt , Rs.97,07,38,000  Work entrusted to M/s.Koya & Co.Construction Pvt. Ltd.,Hyderabad.  Agreement No.& Value 67/ , dt Rs.85,56,59,700

5

6 PROJECT COMPONENTS Stage I:- Lifting of water from River Godavari at KM of Akhanda Godavari Left Bank from to Ayacut benefitted 2,000 Acs existing ayacut. Stage II (a):- Lifting of water from to m. Ayacut benefitted 2,250 Acs existing ayacut.  Stage II (b):- Lifting of water from to m Ayacut benefitted 25,750 Acs new ayacut.  Stage III (From stage II main canal):- Lifting of water from to m Ayacut benefitted 6,000 Acs

7 LAND ACQUISITION Land to be acquired for Head works, pressure main 69 Acs. Land to be acquired for Distributory system 153 Acs.

8 BENEFITS On completion of the pumping scheme 21, MT of food grains valued at crores will be produced annually. Drinking water facility for a population of 1,20,000 people living in 28 villages. B.C. ratio 3.38:1

9 POWER & WATER REQUIREMENT Water Requirement: 3.62 TMC Power Requirement:10 MW

10 BUDGET & EXPENDITURE M.H.161 Venkatanagaram Pumping Scheme 530 Major works Budget Expen. (Rs. in Lakhs) 531 Other Expenditure 7,000 4, Lands