Keith Smith, P.E. ODOT District 8 Environmental Engineer October 2015.

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Traffic Crash Characteristics for Jackson Area Transportation Study Wayne State University Transportation Research Group November 26, 2007.
TRAC Request: Maintain Tier II Status Maintain $5 million for further investigation / Use toward ODOT portion TRAC Request: Maintain Tier II Status Maintain.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
Hardin County Engineering Department September 12, 2006.
Corridor #5 Update United States Senate Briefing September 26, 2007.
Environmental Assessment Public Meeting
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
System Management and Operations System Development and Design Growth and Development Plan Components E AST -W EST G ATEWAY.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Miller Road Feasibility Study & Reconstruction Project Information and Kick-off Meeting Presented by: The Corradino Group of Michigan, Inc. ROWE INC. Genesee.
SAFETY FUNDING APPLICATION STA STA-62 & Harrisburg/Middlebranch and Harrisburg Rd & 30 th St. Safety Improvements.
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
All Roads Transportation Safety (ARTS) Program Kevin J. Haas, P.E. Traffic Investigations Engineer, ODOT February 26, 2015.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
The Basics of CFI ABMB CFI.avi  At-Grade Intersection  Left-turns happen in advance of the main intersection  Movements occur simultaneously  This.
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Special STP Application Cycle for SFY 2016 Projects ICC and Executive Committee Meetings September 2015.
Imagine the Possibilities… Vision from the 2002 Rail Plan.
Interpreting Demand and Capacity for Street and Highway Design Lecture 6 CE 5720 Norman Garrick Norman W. Garrick.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Engaging State DOT’s Engaging State DOT’s 2008 ITS America State Chapters Council Annual Meeting and State Chapters Strengthening Workshop Bernie Arseneau,
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
Traffic Flow Parameters Surface Street Application.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
System Management and Operations System Development and Design Growth and Development Plan Components E AST -W EST G ATEWAY.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Abstract Background Methodology Methods While the project is in the data-collection and background research phase, there are several studies that utilize.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
MVRPC TRAC Project Overview Brian O. Martin Executive Director October 13, 2015.
STA US-30 Presentation for TRAC – October 13, 2015
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
US Route 33 Access Management Study Purpose- Determine feasibility of converting US 33 from Hamilton Road in Franklin County to Carroll in Fairfield County.
Transportation Systems Management and Operations: Why It Matters Presenter Name Date AGENCY LOGO Photo: © Shutterstock.com/iofoto ( )
MED SR 18 Corridor Project MED PID October 13, 2015.
Project Sponsor: Ohio Department of Transportation District 12.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
The I-465 West Leg Reconstruction Project
DATA Transportation 101 Project Status March 20, 2002
District 6 – Safety Applications
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Highway 14 – Owatonna to Dodge Center District 6 Update
Mobility Fund High Impact/Low Cost Projects: Cape Fear RPO
Chicago to Council Bluffs-Omaha
Presentation transcript:

Keith Smith, P.E. ODOT District 8 Environmental Engineer October 2015

 Access Ohio 2040 –US 35 is designated as a Statewide Highway Corridor, a corridor with statewide significance for Ohio’s economic vitality.  Travel efficiency is the predominant transportation issue in the project area.  US 35, with five at-grade intersections within the project area, does not have enough capacity to serve existing transportation demands.  The 2012 levels of service are at or close to failing at the US 35/Factory Road intersection. By 2030, US 35 approaches to the signal at Factory, Orchard Lane, and Valley-Trebein are forecast to be Level of Service (LOS) F.  Final component of a long term program to upgrade US 35, between Dayton and into West Virginia  This component and overall project has been highly supported by Local and State Officials

 23,700 Tons of Freight per day  $71.75 Million per day  20 hours of delay per peak hour for trucks  100 hours of delay of commerce per day

GRE-US35 - ( ) Histogram 3 From 01/01/2011 to 12/31/ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ NUMB ER OF CR A S HES LOGPOINT LOGPOINT_SLM_NBR Count of ACCIDENTS_POINTS_NBR LOCATION FREQUENCY CHART BY TYPE OF CRASH GRE‐ ‐ ‐2014 CRASH DATA Pedalcycles Other Object Overturning Unknown Other Non‐Collision Backing Sideswipe ‐ Meeting Left Turn Animal Angle Sideswipe ‐ Passing Fixed Object Rear End TYPE_OF_CRASH_TXT Valley SLM 6.24 Shakertown SLM 4.3 Factory SLM 4.51 Alpha SLM 4.69 Orchard SLM 5.04

Recent Developments -Stage 1 Plans and Environmental Clearance Complete -City of Beavercreek is working towards implementing the Shakertown Road relocation as an effort to advance safety measures within their fiscal abilities. Sale 2019 $3.4M - Working with Local Agencies on Funding Plan - Projects are currently underway to upgrade signals and add backer plates to help improve safety conditions. -District is currently investigating short term improvements at Orchard and Valley Trebein, adding turn lanes to reduce congestion.

 Assessment of Feasible Alternatives Complete  Development of Preferred Alternative  2014 – Stage 1 Design Complete  Environmental Clearance Complete  Right of Way  2018 – Construction Valley Trebein with Possible Design Build Scope for Factory/Orchard

 $2.5M Existing Funds ◦ $1.85 Complete Plans and Acquire R/W for Valley Trebein ◦ $650K to Develop R/W Plans for Factory/Orchard  Local Contributions ◦ $3.4M Shakertown Relocation by City of Beavercreek  STP funds from MVRPC for 2020, 70/30 split ◦ $100K Funding Contribution from Greene County and Beavercreek Township ◦ $220K estimated R/W donation – Valley Springs Farm  Additional Funding Needs ◦ $ 6M Right of Way Acquisition at Factory/Orchard ◦ $26M Construction Valley Trebein / Tier 1 ◦ $87M (future) Construction of Factory/Orchard