FP420 R&D Project – Brainstorming session on mechanics 28 March 06 1 D. D. INFN To/CERN PH CMM FP420 Integration Environment.

Slides:



Advertisements
Similar presentations
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Cryostat Production Readiness Review January 23, 2002 T. Nicol – Fermilab
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS240. Integration of Moving Beam Pipe and detector box. 1. Re-collection Layout of moving beam pipe.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
The integration of 420 m detectors into the LHC
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Overview of the ESS Linac Cryogenic Distribution System
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Design ideas for a cos(2q) magnet
Teleconf ACS – FREIA 28th March 2017
Status of the low-β triplets
GSI, for the CBM Collaboration
CERN – Zanon discussions
Roadmap for triplet cryostats
HFM Test Station Main Cryostat
LEP cryostat Procurement strategy and plans
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Cryo-assembly design D. Ramos, V. Parma, C. Mucher, H. Prin, M. Souchet, J. Hrivnak, M. Moretti, L. Mora, F. Savary, L. Gentini Review of the 11T Dipoles.
NOVA DESK RANGE.
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
Teleconference ACS – FREIA 18th April 2017
5K or not? & TTF module thermal modeling update
Status of cryostat integration and conceptual design
Cedric Garion, TE-VSC-DLM, WP12
TTF module thermal modeling
From Design to Installation courtesy R. Folch S. Atieh TS / MME
The 11T cryo-assembly: summary of design and integration aspects
Design of Distribution Feedbox at LHC P7
LARP Phase II Secondary Collimator RC-1
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
PANDA The conceptual design of the control Dewar
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
HL-LHC Engineering Change Request # REDUCTION OF Q1 BEAM SCREEN COOLING TUBE DIAMETER FROM Ø16 MM TO Ø10 MM N. Kos TE-VSC TCC #77,
Hl-Lhc Triplet FSI target
JLAB CHL 2K COLD BOX REPLACEMENT
Presentation transcript:

FP420 R&D Project – Brainstorming session on mechanics 28 March 06 1 D. D. INFN To/CERN PH CMM FP420 Integration Environment

FP420 R&D Project – Brainstorming session on mechanics 28 March 06 2 D. D. INFN To/CERN PH CMM Connection Cryostat 1.9K MLI (2x10layers) – 4K/6mm Vacuum >= 2mm Thermal shield (actively cooled 80K) – 1mm MLI (2x15layers) – 80K/12mm Vacuum >= 4mm 300K FROM 1.9K to 300K: AT LEAST 25mm LineT(K)Ø i – Ø e (mm) M1,M2,M3 Bus-bars N Auxiliary bus-bars X Heat exchanger E Thermal shield C‘ Supports posts and beam screens V1,V2 He jackets V1 V2 M1; M2; M3; X C E N N Connection Cryostat. Lines to be kept for continuity and insulation requirements

FP420 R&D Project – Brainstorming session on mechanics 28 March 06 3 D. D. INFN To/CERN PH CMM Layout on LHC IP1/5

FP420 R&D Project – Brainstorming session on mechanics 28 March 06 4 D. D. INFN To/CERN PH CMM Integration of FP420. Proposal 1

He II Beam pipes Heat exchanger BusBars Support posts (  T) Usable Volume (Tamb) Vacuum Vessel Cold to warm transitionwarm to cold transition S. Marque / D. Dattola FP /11/2005

FP420 R&D Project – Brainstorming session on mechanics 28 March 06 6 D. D. INFN To/CERN PH CMM Slot on vacuum vessel Xsection

FP420 R&D Project – Brainstorming session on mechanics 28 March 06 7 D. D. INFN To/CERN PH CMM Slots on vacuum vessel

FP420 R&D Project – Brainstorming session on mechanics 28 March 06 8 D. D. INFN To/CERN PH CMM Dimension and positioning of slots

FP420 R&D Project – Brainstorming session on mechanics 28 March 06 9 D. D. INFN To/CERN PH CMM Micro Pot I

FP420 R&D Project – Brainstorming session on mechanics 28 March D. D. INFN To/CERN PH CMM Micro Pot II

FP420 R&D Project – Brainstorming session on mechanics 28 March D. D. INFN To/CERN PH CMM Micro Pot III

FP420 R&D Project – Brainstorming session on mechanics 28 March D. D. INFN To/CERN PH CMM Moving Short Pipe I

FP420 R&D Project – Brainstorming session on mechanics 28 March D. D. INFN To/CERN PH CMM Moving Short Pipe II

FP420 R&D Project – Brainstorming session on mechanics 28 March D. D. INFN To/CERN PH CMM Positioningtable for MSP (Moving Short Pipe) Structure: Base plate and carriage made from precision machined aluminum extrusion or steel with reference edge Guideway: Ball Rail® Systems with four long runner blocks per carriage Precision Ball Screw Assembly to tolerance class 7 with clearance-free nut system Fixed bearing end plates with two-row, preloaded angular contact ball bearing Floating bearing end-plates with double floating bearing system Accessories: Bellows Integral glass scale Internal or external mechanical operated switch Internal or external iduction-type proximity switch Socket and mating plug for the switches Aluminum frame cable duct 5-phase stepping motors Maintainance-free digital AC servomotors

FP420 R&D Project – Brainstorming session on mechanics 28 March D. D. INFN To/CERN PH CMM Shielding ? Dose rate reduced from 1000->30 Gy/y with 15mm thick lead shielding box on beam tubes

FP420 R&D Project – Brainstorming session on mechanics 28 March D. D. INFN To/CERN PH CMM LHC Vacuum System (from LHC TDR)

FP420 R&D Project – Brainstorming session on mechanics 28 March D. D. INFN To/CERN PH CMM LHC Vacuum System (from LHC TDR)

FP420 R&D Project – Brainstorming session on mechanics 28 March D. D. INFN To/CERN PH CMM Thermal design I (From LHC TDR)

FP420 R&D Project – Brainstorming session on mechanics 28 March D. D. INFN To/CERN PH CMM Thermal design II (From LHC TDR) Complete LHC TDR