Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.

Slides:



Advertisements
Similar presentations
4 basic approaches to determining energy efficiency benefits (savings) 1.Stipulated or deemed savings 2.Individual Building Metering – Measurement and.
Advertisements

Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30,
UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
RTF Lighting Standard Protocol Review of Hours of Operations, Controls Savings, and Variation.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
DISTRIBUTION EFFICIENCY UPDATE 1. Distribution Efficiency – Quick Review Tier 1 study (19 circuits) completed in 2011 – Four circuits identified for pilot.
Ductless Heat Pumps in Residential Applications Proposed Research Plan.
Energy Performance Analysis with RETScreen
+ Impact Evaluations and Measurement and Verification First we will focus on ‘Gross Savings’ Determination - savings determined irrespective of why 1 Kentucky.
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
Evaluation of Energy Savings for Strip Curtains Presented To RTF Scott Moore PECI Sr. Engineer June 2, 2009.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Dairy Milking Machine Vacuum Pump VFD Savings Calculator Follow-up from the last RTF meeting with more field data Regional Technical Forum December 7,
Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Energy Smart Industrial (ESI) Energy Management Pilot Review October 12, 2011.
Advanced Power Strips (APS) Planning UES Measure Proposal Regional Technical Forum August 20, 2013.
Retrofit Doors to Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Capacity Impacts of Energy Efficiency What We Know and What We Don’t Know March 11, 2014.
Copyright © 2005 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Own Use Gas Review of 2000 Model.
Energy Free Stock Tanks Review of Existing Deemed Savings Regional Technical Forum July 7, 2009.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
M&V Part 2: Risk Assessment & Responsibility Allocation.
LED Case Lighting in Vertical and Semi-Vertical Open Refrigerated Cases Eric Mullendore – Energy Analyst PECI 6/29/2010.
EnergySmart Grocer Program Evaluation Findings Summary PWP, Inc.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Strip Curtains for Refrigerated Walk-in Boxes Michele Friedrich, PE – Sr. Engineer Eric Mullendore – Energy Analyst PECI 8/3/2010.
Forecasting and Verifying the Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
M&V Background and Applications
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE March 18 th, 2015 Residential New Construction Standard Protocol Subcommittee Kick-off.
EvergreenEcon.com ESA 2011 Impact Evaluation Draft Report Public Workshop #2 August 7, 2013 Presented By: Steve Grover, President.
Anti-Sweat Heater Control Small Saver UES Measure Regional Technical Forum September 17, 2013.
Deemed Savings Update: ECMs in Display Cases Ben Cartwright PECI January 5, 2009.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
EER Analysis Results Regional Technical Forum March 18, 2014.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
Forecasting and Verifying Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Schools Lighting Hours of Use Data Regional Technical Forum May 13, 2014.
RTU Savings Research Project RTU Savings Research Project: Findings and Recommendations Regional Technical Forum February 3, 2009 Mark Cherniack Howard.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Measurement and Verification of Refrigeration Measures in 4 Grocery Stores in Pacific County Presented to the Regional Technical Forum August 8 th, 2006.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
High Efficiency Evaporator Coils for Medium Temperature Cases Dustin Bailey, Engineer PECI Jan 5, 2010.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Advanced Lighting Control Systems (ALCS) Energy Estimation Tool Pacific Gas & Electric Company Dave Alexander.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum July 15, 2014.
Energy Project M&V: Reports that Add Value October 27, 2015.
Multifamily Homes: Calibration Update Regional Technical Forum December 8 th, 2015.
PNW RoofTop Unit Working Group - RTUG – RTU Savings Research Project Phase 3 December 15, 2009.
Overview of Commercial Existing Building Commissioning and M&V Approaches July 7, 2009 Regional Technical Forum Dave Moser, P.E.
A Reliable but Simplified Method for Measuring the Savings from Advanced RTU Control Retrofits February 13, 2013 Presentation to: RTF Commercial Rooftop.
ENERGY STAR Commercial Refrigerators and Freezers Regional Technical Forum January 21 st, 2016 Mohit Singh-Chhabra.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
G UIDELINE R EVISIONS – R ELEASE February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Residential Behavior-based Programs Measure Development Update Ryan Firestone Regional Technical Forum March 15, 2016.
Achieving Deep Energy Savings in the Grocery Market -A comprehensive approach to retail- Diane Levin November 2, 2010.
A Calculator for Reliably Measuring the Savings from Advanced RTU Control Retrofits August 27, 2015 Presentation to: RTF Commercial Rooftop Unit Working.
Amy Allen, David Jump, Raphael Vitti, kW Engineering
Chapter 10: ANNUAL ENERGY ESTIMATION METHODS
EM&V Planning and EM&V Issues
Presentation transcript:

Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy Litow Jamie Anthony Mark Effinger

2 Recommissioning commercial retail facilities: A whole building approach to quantifying energy savings Overview –Goal today: RTF provisional approval of approach for pilot projects –In brief: Project approach and value Market potential and benefits –In detail Origins Energy savings methodology –Next steps

3 Project approach and value What is whole building recommissioning? –Optimize all building systems, 80%+ of usage Why is it a useful approach? –Missed opportunities Why now? Evolution Market –Energy cost –Technology Program –Technical approach –Persistence

4 Overview - project approach Interval metering at the building level, pre and post Pre inspection and documentation, sensors and logs Recommissioning process Post inspection and documentation Energy savings quantified (more later) Persistence monitoring (three year)

5 Market potential Building types – refrigeration is important –Convenience stores –Grocery stores and standard supermarkets –Large stores Savings range –Average of 7-10% annual savings –Typical range 5-15% –1 in 10, 20% or more possible

6 Benefits of taking a whole building approach Big picture –Leveraging AMI investments –Leadership Capacity building Drive market to systems approach –Measurement to determine savings more powerful than estimation Local picture - Optimized buildings –Systems approach No missed opportunities –Persistence monitoring (3 years)

7 Origins of the whole building approach and basis of the methodology Long history, 1980s PRISM IPMVP, 1997 ASHRAE Guideline (GL) ASHRAE Research project 1050, 2002 California Commissioning Collaborative – Guideline for Verifying Existing Building Project Savings Using Interval Data Energy Models: IPMVP Options B and C, 2008 “Verification of Savings” methodology –Whole building energy use –Many, interactive ECMs

8 Verification of whole building approach: normalized savings 1.Acquire baseline data, utility or logged 2.Model energy use as function of variable(s) (e.g. DB) for pre ReCx 3.Estimate savings and savings uncertainty and required post period 4.Acquire post-ReCx data, utility or logged 5.Model energy use as function of variable(s) for post 6.Drive each model with “normal” conditions (TMY or influential variables) to determine annualized pre and post energy use 7.Savings = modeled annualized baseline - modeled, annualized post- ReCx 8.Evaluate overall uncertainty using ASHRAE GL 14

9 Verification of Savings (VoS) methodology: discussion of the method, 1 VoS is a proven method Change point model, all hourly power data points with corresponding DB temperature –We also looked at other methodologies 4 Parameter model Ambient Temp B3 C Energy use B2 B1 C Ambient Temp Energy use 2 Parameter model

10 Verification of savings methodology: discussion of the method, 2 Example follows a proven method among several options Method uses statistics to determine accuracy –R 2 : proportion of variability in a data set that is accounted for by the statistical model 0 to 1 range, >.7 considered “good” –CV (RMSE): differences between values predicted by a model and the values actually observed from the thing being modeled %, <7% “good” –R 2 : provides a measure of how well future outcomes are likely to be predicted by the model. –CV (RMSE): evaluates the relative closeness of the predictions to the actual values

11 Verification of savings methodology: discussion of the method, 3 Example follows a proven method among several options Range of post data to see temp variation, typically over swing season Latent loads (case infiltration/defrost) accounted for? –DB is proven for other building types –DB is provides best correlation to power vs. WB, RH, DP, W –Will look at other variables, evaluate if DB is best for PNW CZ and refrigeration –Need to field test Estimated savings uncertainty–CCC meets approach, ASHRAE GL 14 requirements – 68% confidence with < or = to 50% uncertainty ok

12 Example: Verification of savings methodology Sample site –Grocery 100,000 ft 2 –ReCx and retrofits –591 days of interval data 411 pre 180 post –OAT DB 1F to 110F Average 56F –RH % Average 53% –Observed OAT 73% of TMY range

13 Energy savings calculation methodology Change point on all data, DB R squared:.74 and.64 CV (RMSE): 5.5% and 5.2% Annual savings: 541,520 kwh Post change point Pre change point

14 Energy savings calculation methodology Method comparisons 1.Change point on all data, DB 2.Change point on all data, WB 3.Linear on all data, DB 4.Linear on all data, WB 5.2 nd degree polynomial, averaged power vs. weather bin, DB 6.2 nd degree polynomial on all data, DB 7.2 nd degree polynomial on all data, WB

15 Energy savings calculation methodology Other areas of interest –Post period perspectives Post ReCx duration –Season very important, range of temperatures needed –Period can be shorter if timed right Estimated savings uncertainty

16 Post period duration and timing 1+ year pre project: R 2.72 and CV RMSE 5.7% Change point for this building, this CZ

17 Post period duration and timing 2 months post project Dec 07-Jan 08: R 2.27 and CV RMSE 6.7%

18 Post period duration and timing 2 months post project Mar-Apr 08: R 2.69 and CV RMSE 4.2%

19 Post period duration and timing 3 months post project Dec 07-Feb 08: R 2.36 and CV RMSE 6.2%

20 Post period duration and timing 3 months post project Feb-Apr 08: R 2.67 and CV RMSE 4.8% Nearly as good as 5 th mos post!

21 Post period duration and timing 4 months post project Dec 07- Mar 08: R 2.49 and CV RMSE 5.8%

22 Post period duration and timing 5 months post project Dec 07- April 08: R 2.60 and CV RMSE 5.6% Appropriate change point visible

23 Energy savings calculation methodology Uncertainty – using CCC Verification of Savings method

24 Conclusions on methodology Use change point models with driving variable(s) Look for importance of latent loads in pilots Post required will vary with season –Shorter in the spring than in the winter Uncertainty – follows VoS guidance, meets ASHRAE GL 14

25 Next steps – pilots Provisional approval to claim savings using this approach Pilots on several facilities Refine approach Present findings to RTF