Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.

Slides:



Advertisements
Similar presentations
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Advertisements

9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
1 Asian Region Mechanical Design ILC Mechanical & Electrical Review Masanobu Miyahara /KEK Atsushi Enomoto /KEK Masahito Huse /Nikken Sekkei 2012/3/21.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
Pipe Supports and Restraints
Team 2: Kelly Foster Chad Mills Lirjon Llusho Dave Rosso September 30, 2009.
MONALISA installation at the ATF2 ATF2 weekly meeting.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
E Huedem, Nov ILC VALUE ENGINEERING SESSION of POWER & COOLING (Focus on Main Shaft 7) November 27, 2007 INFORMATION PHASE Conventional.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
DUMPS, STOPPERS & COLLIMATORS NLC 1999-ERA COST ESTIMATES Eric Doyle 3 May 2006.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
MC Beamline Tom lackowski L1 Manager. Project Organization Jan. 2013T. Lackowski - MC Beamline2.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
T EVATRON LCW COOLING R ECONFIGURATION A NALYSIS T EVATRON D ECOMMISSIONING A CTIVITY Abhishek Deshpande 09/29/
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
High Power Dumps – RDR 10 atm. Cylinder water vessel with copper plate back end, 1.5m diameter x 6.5m long, in a 15 x 3 x 4 m^3 shielded enclosure, with.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Requirements for computing room A. Gianoli, M. Serra, P. Valente.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
1 ESS Warm End Linac Cooling Water 5-6 May 2014 John Jurns.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Mike Andrews August 30, Weeks 1-5 Activities Rad survey open to supervised access & re-core Install crane electronics & remove shield wall Retrieve.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Update on the PSB Cooling and Ventilation Systems
CBETA Technical Review
Conventional Facility & Siting (CF&S) Overview for the Positron Source
FRIB Cryogenic Support
Cryoplant Installation Scope
CERN Data Centre ‘Building 513 on the Meyrin Site’
Heating, Ventilating, and Air Conditioning
News and brief overview of Beamline plans for the next few months
Heating, Ventilating, and Air-Conditioning
Extract from today’s talk given to DCB
Liebert DSE High efficiency thermal management
Presentation transcript:

Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems

Absorber Hall RAW Room : Plan Layout September 9, 2010 Karl Williams – Absorber Hall RAW Systems 2 ABSORBER RAW ROOM 625 sq ft Room for 6 skids Each skid 6’w x 12’l x 10’h Minimum 12’ work height Includes DI Bottle storage

Absorber Hall RAW Room : 3-D Layout September 9, 2010 Karl Williams – Absorber Hall RAW Systems 3

Absorber Hall WBS Absorber Hall Components Decay Pipe Downstream RAW Skid Absorber RAW Skid Intermediate Cooling System Deep Tunnel Cooling System Ground Water Tritium Mitigation Skid RAW Water Tritium Mitigation Skid September 9, 2010 Karl Williams – Absorber Hall RAW Systems 4

Absorber Hall WBS With Comments Absorber Hall Components Decay Pipe Downstream RAW Skid Not considered part of package at this time Absorber RAW Skid Intermediate Cooling System Deep Tunnel Cooling System Split with Civil, only actual Hx interface included at this time Ground Water Tritium Mitigation Skid Possibly included in Civil, originally used as a place-holder RAW Water Tritium Mitigation Skid September 9, 2010 Karl Williams – Absorber Hall RAW Systems 5

General RAW Room Requirements Absorber Hall 25’ x 25’ minimum floor space 12’ minimum floor-to-ceiling clearance Includes placement for (3) skids 6’W x 12’L x 10’H, + floor space for DI bottles LCW header routing through the enclosure will require an envelope of 1’ x 2’ along magnet side of enclosure wall 8’W x 10’ minimum door size RAW room MMC requires buckets for (3) skids with (2) 50 hp pumps, and reserve capacity for controllers AH electrical should include at least (2) 480-V welding outlets, 1 in the RAW room, and 1 near RAW line routing Chillers for 450 kW initial cooling capacity of RAW room components, expandable / upgradeable to 750 kW Instrumentation room will require 1 partial rack for LCW ACNET instrumentation September 9, 2010 Karl Williams – Absorber Hall RAW Systems 6

General MI-68 Room Requirements MI-68 Absorber Hall Service Building At this time, there does not appear to be cooling system requirements for components at the surface. However, heat removal requirements at the surface for RAW systems located in the Absorber Hall are significant. Chiller / Heat Exchanger for AH RAW systems, including two 6” IPS Schedule SS lines in the shaft, from the enclosure to the service building Chillers for 450 kW initial cooling capacity of RAW room components, expandable / upgradeable to 850 kW September 9, 2010 Karl Williams – Absorber Hall RAW Systems 7

Schedule & Costs IDWBSNameStartFinishEsc SWFEsc M&S Raw Water Systs1/4/104/30/15$2,337,474$1,399, Absorber Hall Components1/4/104/30/15$1,059,648$658, Decay Pipe Downstream RAW Skid1/4/104/30/15$177,489$106, Absorber RAW Skid1/4/104/30/15$177,489$106, Intermediate Cooling Skid1/4/104/30/15$177,489$106, Deep Tunnel Cooling Syst1/4/104/28/15$181,378$130, Ground Water Tritium Mitigation Skid1/4/104/30/15$172,854$104, RAW Syst Tritium Mitigation Skid1/4/104/30/15$172,947$104,213 September 9, 2010 Karl Williams – Absorber Hall RAW Systems 8

Schedule & Costs – Adjusted IDWBSNameStartFinishEsc SWFEsc M&S Raw Water Systs1/4/104/30/15$1,842,027$1, Absorber Hall Components1/4/104/30/15$564,201$343, Decay Pipe Downstream RAW Skid (Removed) Absorber RAW Skid1/4/104/30/15$177,489$106, Intermediate Cooling Skid1/4/104/30/15$177,489$106, Deep Tunnel Cooling Syst1/4/104/28/15$36,276$26,128 (Reduced by 80%) Ground Water Tritium Mitigation Skid (Removed) RAW Syst Tritium Mitigation Skid1/4/104/30/15$172,947$104,213 September 9, 2010 Karl Williams – Absorber Hall RAW Systems 9

Risks Heat loads, equipment sizing not fully defined as yet Difficult to size for 700kW beam, yet provide for 2.3MW beam –Cooling systems don’t work well sized for one load, and operated at a fraction of that load For 700kW systems piped for 2.3MW operation, reduced fluid velocity due to larger pipe size may help induce corrosion –Piping, pumping sizes adequate for 2.3MW are significantly larger than those for 700kW –Trade-off of expense & room for larger pipe now vs. possibility of never being utilized at higher capacity later –RAW room sizing is limited for future increases in capacities Studies of DI Bottle usage may show more room required for spent bottle storage September 9, 2010 Karl Williams – Absorber Hall RAW Systems 10