FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Machine Protection: Status + Outlook Status of the fast protection system Beam.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
The applications of FA-M3 PLC used in SSRF ZHOU Dayong
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
ISIS Beam Protection System and MICE operation. Dean Adams 29 Nov 07 Presented by Chris Rogers.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
ORNL/SNS Spallation Neutron Source Low-Level RF Control System Kay-Uwe Kasemir, Mark Champion April 2005 EPICS Meeting 2005, SLAC.
The Machine Protection System for the European XFEL E. Castro on behalf of the MPS team
Status of the Roman Pot Movement System and the Interlocks Mario Deile
NMLTA Protection System Update -Loss Monitors- Arden Warner October 13 th, 2010 Arden Warner, FNAL.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
TESLA Test Facility TTF II Review Meeting, Salzau, January 2003 Introduction to the Electron Beam Diagnostic Session Dirk Nölle DESY, MPY
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
High Current Run I 2015 Feb 3 22:45 to Feb. 4 23:00 High Current Run II 2015 Feb 5 12:15 to Feb. 6 13:00 Current ~ 20 mA Approx. 40 trips, i.e. fast shutter.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
Machine Protection TTF Martin Staack DESY MVP TTF2 Review Meeting at Salzau, January 2003.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
M. Körfer, DESY Salzau Light guide dosimeters and loss monitors H. Henschel, J. Kuhnhenn Fraunhofer-Gesellschaft INT M. Körfer, K. Wittenburg.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Nick Walker (DESY) John Carwardine (ANL) GDE ILC10 Beijing March 2010 Cryomodule String Test: TTF/FLASH 9mA Experiment.
02/18/09 Dump line beam steering and beam losses (Sept 26, 2008 studies) Xiaowei Dong & John Carwardine (Argonne) TTF/FLASH 9mA meeting, 23 February 2009.
K.Honkavaara, LCLS ICW06 LCLS Injector Commissioning Workshop, SLAC, October 9-11, 2006 Linac Experience at FLASH Katja Honkavaara University of Hamburg.
MI primer for NuMI users  Getting beam  TLG modules  Timelines  Beam intensity  NuMI kickers  Extraction bumps and last turn positions  Batch positions.
John Carwardine 21 st October 2010 TTF/FLASH 9mA studies: Main studies objectives for January 2011.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Jean-Luc Biarrotte, SPL HOM Workshop, CERN, June 25-26, A few longitudinal BBU simulations (in the SPL case) J-Luc Biarrotte CNRS, IPN Orsay.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Injector RF and Synchrotron RF Present Status, Activities, Plans PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 1.
John Carwardine 29 October, mA meeting 1. Agenda 9mA workshop Data analysis DAQ refresher / online database 2.
John Carwardine 13 th April, 2011 Report on the 9mA program.
NML Machine Protection System (MPS) Arden Warner Fermilab August 2 nd, 2007.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 LLRF for the FLASH 9mA Program S. Simrock DESY, Hamburg, Germany.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
John Carwardine January 16, 2009 Some results and data from January studies.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
Notes from Tom’s visit 1. Controls is under-staffed 2. Common Diagnostics platforms (BPM, FCT, DCCT, BLM,…) 3. Where possible, ‘Smart’ Diagnostics, running.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
ASTA Machine Protection System (MPS) Status and Commissioning Plan ASTA Machine Protection System (MPS) Status and Commissioning Plan Arden Warner Arden.
Mitigation Devices External Interface ICS Nick Levchenko Lund Date:
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
Summary of Session 1 - CLIC MP workshop 6-8/6/2012, R.Schmidt 1.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
FLASH. Free-Electron Laser in Hamburg TTF/FLASH: Injector Performance Dark Current Video ‘flags’ Comments based on Desy visit, 5 th May, /19/2010Desy.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
ESS LLRF and Beam Interaction
Introduction; Machine protection, experience and challenges: Review of existing solutions and challenges faced by future installations Purpose of machine.
DRY RUNS 2015 Status and program of the Dry Runs in 2015
LLRF systems status update
RF interlocks for higher intensities (LMC 15 June)
Planning the Experiment
Outlook of future studies to reach maximum gradient and current
XFEL Vacuum System Commissioning
Notes on Machine Protection for long bunch trains
Diagnostics overview and FB for the XFEL bunch compressors
RF Local Protection System
UITF Conduct of Operations Review
Presentation transcript:

FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Machine Protection: Status + Outlook Status of the fast protection system Beam loss monitors for the dump line Small issues, miscellaneous

FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Fast Protection: Overview Beam Interlock Concentrators (BICs) Beam Loss Monitors (BLMs) Toroid Protection System (TPS) Miscellaneous (coupler interlocks,...) Injector Laser Pulse Controller RF Inhibit ACC1 LLRF Controllers alarm signals interlock signals

FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Fast Protection: Overview Beam Interlock Concentrators (BICs) Beam Loss Monitors (BLMs) Toroid Protection System (TPS) Miscellaneous (coupler interlocks,...) Injector Laser Pulse Controller RF Inhibit ACC1 LLRF Controllers alarm signals interlock signals

FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Beam Loss Monitors Sufficient instrumentation up to dump entrance New Čerenkov BLMs added (1 installed, 1 in next weeks) Shutdown: Long ionization chambers (K. Wittenburg): integration to MPS prepared Čerenkov BLM with longitudinal resolution (M. Körfer): no integration to MPS IR-UND Dump Čerenkov BLM w/o longitudinal resolution Čerenkov BLM with longitudinal resolution

FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Fast Protection: Overview Beam Interlock Concentrators (BICs) Beam Loss Monitors (BLMs) Toroid Protection System (TPS) Miscellaneous (coupler interlocks,...) Injector Laser Pulse Controller RF Inhibit ACC1 LLRF Controllers alarm signals interlock signals

FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Toroid Protection System Bypass TPS #1 and #2 operational, but... Re-calibration required because of major changes to toroid signal levels (time needed: ~2 h at low losses) Designed for up to 9 MHz, but never tested

FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Fast Protection: Overview Beam Interlock Concentrators (BICs) Beam Loss Monitors (BLMs) Toroid Protection System (TPS) Miscellaneous (coupler interlocks,...) Injector Laser Pulse Controller RF Inhibit ACC1 LLRF Controllers alarm signals interlock signals

FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Miscellaneous Alarm Sources Coupler interlocks: ACC1–5 OK ACC6, ACC7, ACC39 to be added LLRF exceptions: prepared, but not used New toroid integrator (~May): limits charge to 30 nC/bunch train in short pulse mode Quench detection for 9 mA run?

FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Fast Protection: Overview Beam Interlock Concentrators (BICs) Beam Loss Monitors (BLMs) Toroid Protection System (TPS) Miscellaneous (coupler interlocks,...) Injector Laser Pulse Controller RF Inhibit ACC1 LLRF Controllers alarm signals interlock signals

FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Connections to LLRF Controllers Connection MPS  ACC1 available ACC1 LLRF is aware of MPS alarms: output is zeroed for remaining pulse Past coupler interlock problems solved New problem with adaptive feedforward: irritated by shortened RF pulse  instability Do we need connections to the LLRF of the other modules, e.g. for beam loading compensation? shortening of ACC1 RF pulses disabled until there is a solution

FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) The end.