LU and SEU testing at STAR and LBNL 88” cyclotron LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans IPHC – LBL.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

STAR Pixel Detector Latch-up in Phase-1, SUZE and Mimosa22 Tests and analysis by Michal Szelezniak.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
PROBE CARD INTEGRATION IN pALPIDEfs TEST SYSTEM ALICE | ITS-MFT Mini-Week | | Markus Keil.
Fabrication & Assembly of Opto-Rx12 Modules for CMS- Preshower S. K. Lalwani Electronics Division Bhabha Atomic Research Centre Mumbai –
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
-1- Current Telescope Strengths High resolution (~2.5um) Adaptability Ease of use – Currently borrowed by SPS collimator group Weaknesses Small number.
Wojciech Dulinski Mimosa-18 (High Resolution Tracker) IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France Mini.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
PXL Electronics Status update for HFT TC meeting on October 14, 2010 at BNL 1HFT TC 05/11/ LG.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
DESY test beam (DAQ integration, measurement plans, analysis) Mathieu Benoit.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
ULTIMATE: Preliminary Test Results IPHC-LBNL Phone Conference Outline  Ultimate test status  Analogue outputs (tested by Mathieu)  Pixel array + Discriminators.
Test setup 07/08/ Components Labview control application I2C communication FPGA firmware IC board 2.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
EUDET Pixel-related DESY Tobias Haas 29 June 2006.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Slides for Opto-Working Group on COTS and PIC Microcontroller D. Underwood Sept 12, 2012.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Investigating latchup in the PXL detector Outline: What is latchup? – the consequences and sources of latchup – techniques to reduce latchup sensitivity.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Elena Rocco Nikhef, The Netherlands On behalf of the ALICE Utrecht-Nikhef group Jamboree – Utrecht December 2012.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
DCFEB Production for LS2
The STAR Heavy Flavor Tracker PXL detector readout electronics
Novosibirsk, September, 2017
Test Boards Design for LTDB
INSIDE in-beam PET system assembly and test at INFN Torino
Overview & status of SEU Test Bench
HERD Prototype Beam Test
Sheng-Li Liu, James Pinfold. University of Alberta
A microTCA Based DAQ System for the CMS GEM Upgrade
UK ECAL Hardware Status
State of developments on Readout interface of European DHCAL
Presentation transcript:

LU and SEU testing at STAR and LBNL 88” cyclotron LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans IPHC – LBL phone meeting May 5, 2011

MS IPHC - LBL phone meeting, May 5, LU testing at STAR The electronics box contains: 8 LU protected regulation PS PCBs (each is polyfused) an NI DAQ6008 USB module a PCB with electronic switches a USB/fiber converter Monitored power: 2 × VDA 2 × VDD 2 × VMEM 1 × VREG

MS IPHC - LBL phone meeting, May 5, LU testing at STAR STAR

MS IPHC - LBL phone meeting, May 5, st (and so far the only) latch up (?) at VMEM Begin monitoring: 13 April 2011, ~12:00 pm (EDT) First registered event: 17 April 2011, ~9:00 pm (EDT) – Beam status at the time of the event No new events until now (May 5, 2011) (500 GeV p+p)

MS IPHC - LBL phone meeting, May 5, LU and SEU at 88” Test chamber Readout system Test PCB

MS IPHC - LBL phone meeting, May 5, LU and SEU at 88” cyclotron Status: – No progress in measurements since our last report (Nov. 29) – SEU monitoring firmware in a validation phase – No beam time scheduled; we expect to be on-call for beam availability – Integration of Ultimate into the upcoming set of tests

MS IPHC - LBL phone meeting, May 5, Test integration with IPHC During my visit at IPHC in February/March, Guy and I agreed on the interface between his memory test PCB and our setup: – Mounting holes (compatible with the existing fixture) – cable connectors (compatible with our setup) The test PCB will easily interface to our Xilinx FPGA board for SEU and LU monitoring

MS IPHC - LBL phone meeting, May 5, Test plans LU tests for Mimosa26 with 20 µm epi SEU tests for both Mimosa 26 chips (15 and 20 µm epi ) SEU for all ladder/MTB components SEU and LU for Ultimate Memory test structures from IPHC (if available) Time frame – undetermined at this time – Beam time at the cyclotron appears fully booked until January 2012 (some openings might become available)

MS IPHC - LBL phone meeting, May 5, That’s all for now …