AQ Review 2009. Team August 2009 Dean Johnson Operations Manager Analytical Services Susan Prosser AQ Officer John Harris AQ Administrator.

Slides:



Advertisements
Similar presentations
Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
Advertisements

Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
THEFT OF GAS TEAM. THEFT OF GAS TEAM PO Box 6803, 31 Homer Road, Solihull, B91 3LT Fax : Free Phone : Seamus Rogers Account.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Chubaka Producciones Presenta :.
SGN S&U Update Lisa Warnock 1 st November Agenda Data cleansing (set to dead/extinct) Shipper interaction SGN root cause measures.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Budget Prep Budget Prep Dates Budgets will be released mid-May Budgets will be due to the Budget Office on June 18 th Budget will be finalized and.
Acceleration Update: BEA’s New Release Schedule for Local Area Personal Income and Product Statistics Jim Zavrel Association for University Business and.
The AQ Operational Review Group ‘Mid-process’ Forum Via teleconference 4 th September 2014 “Whilst every effort is made to ensure the technical accuracy.
Version /08/2008 The AQ calculation and validation process Compiled and delivered from the xoserve AQ Team for Review Group 209 Susan Prosser & Steve.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Version /08/2008 The AQ calculation and validation process Compiled and delivered from the xoserve AQ Team for Review Group 209 Susan Prosser & Steve.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Distribution Workgroup 24/11/16
Options for Mod 640 Replacement
Performance Indicators
Market Trials ChMC 8th August 2018.
iGT Agency Services Background
PN UNC Workgroup iGT Services
DSC Change Committee Summary – 7th November
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Exit Capacity Substitution and Revision
DSC Change Committee Summary – 12th September
DSC Change Committee Summary – 11th July
Consideration of issues raised by UNC Modification Proposal 0244
Impacts of Project Nexus Implementation Date to AQ17
McDonald’s calendar 2007.
DSC Change Committee Summary – 10th October
UNC Modification 0531 Provision of Industry Testing System
QSEC auction timetable
Market Differentiation Workgroup Market Sector Flag Analysis
Connected System Exit Points - Update
Consideration of issues raised by UNC Modification Proposal 0244
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
CSEPs SPA Rejections November 2007 update
MOD 640 INVOICING VALIDATION RULES
Gas Customer Forum Project Nexus xoserve update (as of 19th July 2010) 26th July 2010 Final.
DN Interruption Phase II
Dave Addison August 2008 Application Support Updates
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Modification Proposal 136
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Customer Issue Management CoMC Update
McDonald’s calendar 2007.
Customer Issue Management CoMC Update for April & May 2019
CSEPs SPA Rejections January – August 2007
Operational Update 1.
Further Considerations
Customer Issue Management Dashboard CoMC - July 2019
Customer Issue Management Dashboard CoMC - July 2019
2015 January February March April May June July August September
DSC Change Committee Update
Presentation transcript:

AQ Review 2009

Team August 2009 Dean Johnson Operations Manager Analytical Services Susan Prosser AQ Officer John Harris AQ Administrator Ian Bevan Account Assistant Nicky Kingham Account Assistant Andy Hinton Account Assistant

2009 AQ Timetable / Progress DATE ACTION COMPLETE 26th March 2009Recalculation of Smaller Supply Point AQs  1st May 2009Recalculation of Larger Supply Point AQs  19th May 2009 First release: iGT (Weather correction and CV data)  19th – 30th May 2009 Domestic & Threshold Crosser T04 Files sent to Industry  1st June 2009 Domestic AQ Amendment Window Opens  12th June 2009 Start of BSSOQ Review Process  20th – 30th June 2009 I&C T04 Files sent to Shippers  1st July 2009 I&C Amendment Window Opens  1st July 2009 First Release of MOD81  10th July 2009BSSOQ files to Shippers  31st July 2009 AQ Appeal Window Closes  3rd August 2009 Second Release of MOD81  3rd August 2009 Second Release of OFGEM Report  13th August 2009 Last day for Shipper Amendment Files AQ & BSSOQ 20th August 2009 Final release: iGT (Weather correction and CV data) 10th - 14th September 2009 IX NRO/NRL files sent to Shippers (S91, S92, T68) 14th September 2009 AQ Appeal Window Opens 17th September 2009Run Emergency Contact Reports (732,000kWh+) 1st October 2009 Final AQ Implemented 1st October 2009Release Emergency Contact Reports (732,000 kWh+) 30th October 2009 Final Release of MOD81 30th October 2009Final OFGEM Report

What’s Next?  13 th August - Amendment Window closes. Last day for AQ and BSSOQ amendments.  10 th – 14 th September - NRO / NRL files sent to Shippers.  23 rd – 25 th September - System Catch up.  1 st October - Go Live. * For any updates or news, please refer to the xoserve website. (