George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.

Slides:



Advertisements
Similar presentations
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Advertisements

1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Frequency Responsive Reserve Process Update
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Western Electricity Coordinating Council Market Issues Subcommittee Report to the Market Interface Committee Philip Tice October 30-31, 2008.
VGS-Planning Work Group (PWG) Activity Update to PCC Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 9-11, 2010.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Section 4.9 Review Work Group Update to Board of Directors March 11, 2015.
RPEWG Report Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014 RS Meeting 1.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Variable Generation Subcommittee Update to PCC Ann Finley - VGS-PCC Liaison Metropolitan Water District of So. Cal October 7, 2014 Salt Lake City, Utah.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Al Hefner (NIST Lead) Frances Cleveland (Technical Champion)
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
IEEE 1547: The DG Interconnection Standard
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee Report for ISAS Robin Chung August 20, 2014 Salt Lake City, UT.
Ann Finley VGS-PCC Liaison VGS Discussion March 25-26, 2014 Salt Lake City, Utah.
Victoria L. Ravenscroft Senior Policy Analyst Reliability Planning and Performance Analysis Information Sharing Policy Update March 25-26, 2014 Standing.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Base Case Coordination System Report Philip Augustin – TSS Chair Nathan Powell – PCC Staff Liaison July 2015 Salt Lake City, UT W ESTERN E LECTRICITY C.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
VARIABLE GENERATION OPERATING RESERVE TASK FORCE VARIABLE GENERATION OPERATING RESERVE TASK FORCE Don Badley, Chair VGORTF Report to Operating Committee.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
Integration of Variable Generation Task Force (IVGTF) Mark Lauby Manager, Reliability Assessments
Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010 WECC VGS--REC Impacts Work Team Update Paul F Arnold—VP ColumbiaGrid.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
Parks & Recreation Service Delivery Model Review Progress Report #1 City of Pitt Meadows Council January 19,
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Ann Finley VGS-PCC Liaison VGS Discussion July 15-16, 2014 Salt Lake City, Utah.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Bert Peters Chair, Path Operator Task Force
Reliability Assessment Guidebook (RAG): Status Report
Reliability Assessment Guidebook (RAG): Status Report
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Western Electricity Coordinating Council
Integration of Variable Generation Task Force (IVGTF)
Anitha Neve Operations and Interchange Specialist
Anitha Neve Operations and Interchange Specialist
Integration of Variable Generation Task Force (IVGTF): Status
Anitha Neve Operations and Interchange Specialist
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
Integration of Variable Generation Task Force (IVGTF)
Planning Coordinator Function Task Force
Western Electricity Coordinating Council
Anitha Neve Operations and Interchange Specialist
GENERATOR OPERATOR WORK GROUP
Variable Generation Subcommittee Update to PCC
Planning Coordinator Function Task Force
Generator Operator Work Group (GOWG)
GENERATOR OPERATOR WORK GROUP
Bert Peters Chair, Path Operator Task Force
Information Sharing Policy Update March 25-26, 2014
Presentation transcript:

George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC

2 Develop a document to: Share Lessons Learned or Best Practices on Variable Generation (VG): o Interconnection requirements o Modeling o Operations Address some recommendations in the NERC report dated March 2012 Collect information from areas with high VG penetration to assist areas with emerging VG Assignment from PCC

3 Background

4 PCC Decision to Start VGITF – October 2014 Outline – March 2015 First Draft – July 2015 Final Draft – October 2015 Final Paper for Approval – March 2016 Progress

5 Who are the Target Readers? o Planning Personnel Wind, Solar Bulk Transmission Interconnection Planning and Operation Issues Scope

6 Introduction Reactive Power and Voltage Control Active Power and Frequency Control System Studies o Scope o Models Commercial Operations o Test o Monitoring Other Issues o Harmonics o SSR Contents

7 What is the desire of PCC: More Materials Gathered on Wind or Less? More or Less Materials gathered on Planning? More or Less Materials gathered on Operations? Content Question to PCC

8 Publish as a White Paper upon PCC Approval – March 2016 o Complete Draft – 11/15/15 o WECC Editorial Changes – 12/15/15 o Public Comments – 1/15/2016 o Final Draft for PCC Approval – mid-February 2016 Other Options? Future Activities of this Task Force o Next Phase with Focus on Solar, Energy Storage Next Steps for Consideration

9 George Zhou (650) Ann Finley (213) Nathan Powell (801) Contacts