Presentation is loading. Please wait.

Presentation is loading. Please wait.

GENERATOR OPERATOR WORK GROUP

Similar presentations


Presentation on theme: "GENERATOR OPERATOR WORK GROUP"— Presentation transcript:

1 GENERATOR OPERATOR WORK GROUP
Winter Preparations for Upcoming Season November 7, 2017 Salt Lake City, Utah

2 NERC MATERIALS Review cold weather training materials on nerc.com
Lessons Learned video Review Lessons Learned on nerc.com Lessons Learned

3 GENERATOR OPERATOR WORK GROUP
GADS Reporting for Wind November 7, 2017 Salt Lake City, Utah

4 REPORTING SCHEDULE New requirement for Wind
2017 reporting is voluntary Becomes mandatory in 2018 with a phased implementation 2018 – report for plants 200 MW or greater 2019 – report for plants 100 MW or greater 2020 – report for plants 75 MW or greater

5 NERC MATERIALS NERC has offered several trainings to wind generators.
Materials from trainings can be found here. NERC has published a detailed instruction guide for reporting Instructions can be seen here. Register for access to GADS submission site Contact to set up test accounts or for any questions

6 GENERATOR OPERATOR WORK GROUP
Misoperations in WECC November 7, 2017 Salt Lake City, Utah

7 WECC MATERIALS WECC Misoperation page Reduction Strategy papers
2017 Workshop materials


Download ppt "GENERATOR OPERATOR WORK GROUP"

Similar presentations


Ads by Google