DECISION DOCUMENT EXECUTIVE SUMMARY SCOPE AND REQUIREMENTS OPTIONS CONSIDERED COST BENEFIT ANALYSIS RESOURCE IMPACT ANALYSIS GENERAL FORMAT.

Slides:



Advertisements
Similar presentations
EasyDirector® Simplifying the way you manage your business... Full-Featured Contact & Customer Relationship Management Tool Prepared by AITechConsulting.
Advertisements

P ROJECT C LOSEOUT. Introduction This purpose of this presentation is to summarize key project closeout information and feedback for purposes of presenting.
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
“Take your gradebook to the next level with GradeSpeed.NET” Gradebook Features Presentation.
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
Network Design and Implementation
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Software Development Problems Range of Intervention Theory Prevention, Treatment and Maintenance Planning, Development and Use Cost of Intervention.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Computers: Tools for an Information Age
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Ground Control™ Document Control and Training Manager
Claim Tracking System. Why was the Claim Tracking System Built? Mandated by the 2002 Legislature Automated Monthly Summary Reports Track and Ensure Construction.
1a Job Descriptions for Personnel Involved in PAT Implementation Materials Developed by The IRIS Center, University of Maryland.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
2010 Practice Management Annual Conference PCLaw® Office Efficiency Tools – Calendaring, Phone Call & Document Management Presented by: Deborah Schaefer.
Database Software Application
Computerised Maintenance Management Systems
CSO’s 2014 Training & Networking Conference | Austin, TX | Copyright © 2014 CSO Research, Inc.... For CSO Add-ons CSO Presenters: Chris and Jillian Utah.
SATERN for Supervisors May Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.  Log.
Systems Analysis and Design: The Big Picture
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
1 of 39 DQO Implementation Process: Flow Chart and Wall Charts 30 minutes DQO Training Course Day 2 Module 8 Presenter: Sebastian Tindall.
M EETING S CHEDULER S YSTEM Team Members: Aaron Tull Rachel Weldon Derek Horner.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Contractors & contracts
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
CRM- The Systems House, Inc. 1 CRM Relationship Development MDS Sales Management Tools.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
© 2003 East Collaborative e ast COLLABORATIVE ® eC SoftwareProducts TrackeCHealth.
Chapter 16 Structured Systems Analysis. Learning Objectives Know goals, plans, tasks, tools, & results of systems analysis Understand/appreciate costs.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Appalachian Student Advising Program - ASAP Central Desk Functions.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
ME 481 Mechanical Engineering Design Projects Project Management.
Ashley Hawley. Project Description Business Need User Profiles Development Technology Testing Plan Deliverables Demonstration Conclusion.
T.E.A.M. Training: Microsoft Outlook 2010 Scheduling & Facilitating Meetings.
SATERN for Supervisors Updated: January Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.
Operational Planning preparing to act Conservation Coaches Network New Coach Training.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Life Cycle – Project Initiation © Ed Green Penn State University All Rights Reserved.
By Matt Baker Eric Sprauve Stephen Cauterucio. The Problem Advisors create a sign-up sheet to be posted on the door of their office. These sign-up sheets.
1 SMART Training Update – May 2011 Michaela Butterworth.
Project Charters Module 3
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Users December 2009.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Student Records Training Team
SharePoint Administrative Communications Planning: Dynamic User Notifications for Upgrades, Migrations, Testing, … PRESENTED BY ROBERT FREEMAN (
INFORMATION X INFO425: Systems Design Systems Design Project Deliverable 1.
Computerised Maintenance Management Systems
Project Management Update TAC Team Meeting
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Impact Research 1 Enabling Decision Making Through Business Intelligence: Preview of Report.
Impacts of implementation of 4PM Vesna Kobal, Arctur d.o.o. Rijeka, april 2014.
IIS Project and Contact Management Systems (CMS): An Efficient Comprehensive Management Approach to IIS Recruitment, Training and EHR Integration IIS Community.
ACC 542 Entire Course For more classes visit ACC 542 Week 1 Individual Assignment Computer Information System Brief ACC 542 Week.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
ITEC 275 Computer Networks – Switching, Routing, and WANs
Systems Analysis and Design in a Changing World, Fifth Edition
Electrical Engineering
BIS 221 MENTOR Lessons in Excellence- -bis221mentor.com.
BIS 221 RANK Education for Service-- bis221rank.com.
Project Plan Template (Help text appears in cursive on slides and in the notes field)
CIS12-3 IT Project Management
Presentation transcript:

DECISION DOCUMENT EXECUTIVE SUMMARY SCOPE AND REQUIREMENTS OPTIONS CONSIDERED COST BENEFIT ANALYSIS RESOURCE IMPACT ANALYSIS GENERAL FORMAT

DECISION DOCUMENT ONE PAGE SUMMARY Brief Narrative High Level Requirements General Requirements Summarized Three Year Cost Projection Recommended Solution APPROVALS PAGE Decision Makers/Funding People Key Implementers EXECUTIVE SUMMARY

EXECUTIVE SUMMARY SAMPLE Advisors must be more efficient using computer technology for student scheduling, documentation, and reporting. High Level Requirements Students schedule, reschedule and cancel appointments Automate the documentation of advised student records Automatic advisor schedules, workload reports and graphics General Requirements Summarized Three Year Cost Projection Recommended Solution We believe Vendor 2 meets our long-term needs and budget. StudentAdvisorReportsSystemNice WtRkScWtRkScWtRkScWtRkScWtRkScTotals Vendor Vendor FY11FY12FY13 Vendor 1$12,000$1,000 Vendor 2$11,040$840

DECISION DOCUMENT SCOPE AND REQUIREMENTS PROJECT SCOPE NARRATIVE -Defines Project Boundaries HIGH LEVEL REQUIREMENTS -General Definitions

SCOPE AND RQMTS SAMPLE Scope With budget constraints, limited resources, and the need to reduce work loads, advisors and staff must use their time more efficiently. They can reduce time consuming activities with available software and technology. This includes student scheduling, documenting visits, and duties related to student tracking, record transfers, and student advising reports. High Level Requirements Students schedule, reschedule and cancel their appointments Reduce no-show appointments with automated student reminders Automate the documentation of advised student records Advisors have more time to advise students into majors of study Maximize staff resources to provide student advising services Manage one calendar efficiently and prevent conflicts Capture advisor and student data with available statistics Automate advisor schedules, workload reports and graphics

DECISION DOCUMENT OPTIONS CONSIDERED DECISION ANALYSIS CRITERIA REQUIREMENTS LIST DESCRIPTIONS WEIGHTED REQUIREMENTS SCHEME VENDOR RANKING RESULTS VENDOR RECOMMENDATIONS

DECISION DOCUMENT DECISION ANALYSIS CRITERIA Must Have Requirements Meets or Does Not Meet Criteria Nice-to-Have Requirements

DECISION ANALYSIS CRITERIA SAMPLE Must Have Criteria 1 = Meets Criteria 0 = Doesn't Meet Criteria Vend 1Vend 2Vend 3 Vend 4 Vend 5 1. Student Options Advisor Responsibilities Reporting Capacities System Capabilities System Implementation Go or No-Go Ranking Go No-Go

DECISION DOCUMENT RQMTS LIST DESCRIPTIONS Describe the Must Have Requirements Detail the Rqmts for Evaluation Ranking May Include Nice-to-Have Requirements

RQMTS LIST DESCRIPTION SAMPLE Student Capabilities 1. General ease of system use for students 2. Students required to “login” to system 3. Web-access to schedule/reschedule, cancel appts 4. Automatic student appt reminders via 5. Automatic student appt reminders via text msgs 6. Limit one appointment per student per day 7. Schedule student groups (vets, nursing) 8. Schedule students by advisor name

DECISION DOCUMENT WEIGHTED REQUIREMENTS SCHEME Ranks the General Requirements Importance -Assign a numerical weight to each Ranks the Detail Requirements -Assign a numerical weight to each Ranks the Nice-to-Have Requirements -Assign numerical weights < “Must Have”

WEIGHTED RQMTS SCHEME SAMPLE RqmtWeightRankScore Rqmt A Rqmt B9981 Rqmt C8864 Rqmt D7749 Rqmt E6636 Rqmt F5525 Rqmt G4416 Rqmt H339 Rqmt I224 Rqmt J111

DECISION DOCUMENT VENDOR RANKING RESULTS Use a Major/Detail Rqmts Ranking Table - Roll Up Totals by Major/Detail Rqmts Show a Major Rqmts Summary Table

VENDOR RANKING RESULTS SAMPLE Vendor 1 Advisor Recording WeightRankScore a. Enter student visit notes b. Attendance (show/no-show) 9545 c. Search by student name d. Track unscheduled visits 8864 e. Appts - office, phone, s 7535 f. Advisor notification check-in 8324 g. Purge/transfer records 7642 Weighted Sub-Totals Total Percent 100% 78%

DECISION DOCUMENT COST BENEFIT ANALYSIS VENDOR COST COMPARISONS THREE-FIVE YEAR COST PROJECTIONS COST BENEFITS SUMMARY

COST BENEFIT ANALYSIS SAMPLE Requirements Vendor 1Vendor 2 1. Onetime software cost5,0004, Yearly maintenance cost1, Initial service package cost 4. Yearly service package cost 5. Server requirements2, Computer requirements3, System training cost1,000 Totals $12,000$11,040

DECISION DOCUMENT RESOURCE IMPACT ANALYSIS PERSONNEL RESOURCES COMPUTER OPERATING RESOURCES IMPLEMENTATION PLAN –RECOMMENDED TEAM –SCHEDULE OF EVENTS –POTENTIAL CONFLICTS

DECISION DOCUMENT HIGHLY EFFECTIVE PROCESS -General to Specific FACILITATES AGREEMENT -All Organizations Including IT DOCUMENTS DIRECTION - Excellent Communication Tool RESULTS OF USING THIS METHOD