Update on Micro Channel Cooling Collaboration Meeting 08.12.2009, G. Nüßle.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
122 Nov GTK Microchannel Cooling Hydraulic simulation with Rectangular Manifold Enrico Da Riva, Vinod Rao CERN (EN/CV/DC) 22 th Nov 2011 E. Da Riva,
Mechanical Status of ECAL Marc Anduze – 30/10/06.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Liquid Argon in a Large Tank --- Some Thermodynamic Calculations Zhijing Tang November 4, 2004.
1 21/10/2011 GTK Microchannel Cooling coupled simulation Enrico Da Riva, Vinod Rao CERN (EN/CV/DC) 21 st October 2011 E. Da Riva, V. Rao.
– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /21 GTK COOLING: STATUS OF THE MICRO-CHANNEL OPTION Paolo.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
20 th June 20111Enrico Da Riva, V. Rao Project Request and Geometry constraints June 20 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Metal Soldering Connectors Kovar connectors 6mm diameter with a small pin to enter in the hole Developed for NA62 project 3µm.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
1 Estimation of Dynamic Force Coefficients from a Wet (Foamy) Annular Seal Progress Year 1 May rd Turbomachinery Research Consortium Meeting Gary.
DCLL ½ port Test Blanket Module thermal-hydraulic analysis Presented by P. Calderoni March 3, 2004 UCLA.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
Report on testing Snake2 u-channel. P. Jalocha & J. Buytaert. 8 June 2015.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
Installation of the T600 at Fermilab CSN2, September 22,
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Microchannel Cooling D. Bouit, J. Daguin, A. Jilg, L. Kottelat, A. Mapelli, J. Noel, P. Petagna, G. Romagnoli – CERN PH-DT K. Howell – Georges Mason University.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
GTK Controls and Safety Thermal results with the ceramic heater Kaitlin Howell, Georg Nüßle, Paolo Petagna,
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
Anti project. F. Raffaelli. INFN CERN, April 05 th, Thermal Analysis of the Anti transportation. -Calculation of the manhole loads due to the valve.
DT-LHCb coordination meeting 18 April 2016
Microchannel cooling - Update
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Service channels between Tracker and PP1
Ti/SS transitions A.Basti INFN-PISA*
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Local Supports for Inclined Layout: CERN Update
Micro-channel Cooling
Performance of an Automated Water Based Cooling System for CBM MuCh
Pixel cooling specifications
SILICON PIXELS DETECTOR
ALICE PD group meeting Andrea Francescon.
Microfluidic devices for thermal management
FP420 Detector Cooling Thermal Considerations
WG4 – Progress report R. Santoro and A. Tauro.
Date of download: 3/4/2018 Copyright © ASME. All rights reserved.
Tests on a dummy facet of PIX upgrade using CO2 cooling
Presentation transcript:

Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle

Outline Micro channel clamp system Microchannel cooling test stand Next Steps

Micro Channel Clamps - Concept Silicon wafer is clamped between (red) metal blocks Seal material is present between blocks and wafer 2 blue plates are sufficiently rigid to ensure homogeneous force distribution on the wafer Micro channels are fed via grooves inside the red blocks

Micro Channel Clamps - Design First design for test configuration to validate the clamp concept The round holes in the transparent blocks connect the external cooling circuit to internal grooves These longitudinal grooves feed the micro channels in the silicon wafer

Clamps: single compression test Setup: 2 identical blocks top and bottom Seal: 2mm silicone foam Test object: 0.5mm thick Si wafer Result: Reached compression force of more than 10kN without failure Seal is compressed to less than 50% of its original thickness Conclusion: Seal is too soft, danger of contact metal to silicon

Clamps: parallel compression and pressure test Setup: 2 identical blocks on the bottom 2 identical blocks on top Seals: 1.6mm NBR Seals have openings in the center resembling the grooves in the blocks One block connected to N 2 bottle for pressure test Results: Reached compression force of more than 10kN and 15 bar pressure without failure Seal compression not visible Conclusion: Seal hardness is good Parallel compression with possible

Clamps: parallel compression and pressure test Comments: Pressure caused an outward force on the seal of ~200N Conservative approach with a friction coefficient of 0.2 asks for a compression force of 200N/0.2 = 1kN to keep the seal in place A vertical displacement of the seal is not visible

Micro Channel Cooling Test Stand 3d design for instrumentation and piping is finalized Most components have arrived Rack has been mounted Arrival of the booster pump is estimated for mid- December Pump for C 6 F 14 cooling unit is being installed

3d design has been finalized Most components have arrived Missing: booster pump Test stand PID

Next steps Build micro channel clamps prototype Investigate leak tightness of clamp system Test the micro channels with gas and liquid Build up test stand

Microchannel cooling – Status Cooling plate prototype: design finished, production at EPFL started prototype EPFL with Pyrex(Glass) cover plate, later silicon connections in design process Thermal interface: max. Temperature allowed 170°C? test kit for soldering at low temperature will be obtained test of technique from electronic design (Staystic) Test stand: C 6 F 14 cooling unit has been recovered, pump ordered design for test stand has been finalized booster pump for test circuit has been ordered valves, piping, instruments: awaiting offer material for rack construction has been ordered

ComponentMaterialThickness [μm]X0 [%] SensorSi Bump BondsPb-Sn~ Readout ChipSi Cooling PlateSi~150~0.15 Sum~0.47 Materials in the sensor area The total material budget (material in the beam) allowed for the GTK module is 0.5% X 0 (radiation length).

C 6 F 14 cooling liquid of choice C 6 F -20°CH 2 +20°C Density  kg/m 3 ] Viscosity  [10 -7 m 2 /s] Heat capacity c p [J/(kg K)] Thermal conductivity  [10 -2 W/(m K)] radiation hard thermally and chemically stable nonflammable, nontoxic, nonconducting known and used at CERN (CMS and Atlas Tracker) used in liquid phase C 3 F 8 is an option in case of to high pressure in the cooling plate for C 6 F 14

Fluid temperature difference 12bar pressure drop2bar pressure drop Temperature difference between inlet and outlet for channels of 50  m x 50  m