Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.

Slides:



Advertisements
Similar presentations
VETO Analysis Update Michael Wood University of Massachusetts, Amherst Outline Introduction and basics Reconstruction packages Efficiencies Simulation.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
Thomas Jefferson National Accelerator Facility Page 1 Internal Software Review Jefferson Lab November 6-7, 2014 Hall B:User Software Contributions Gerard.
TOF offline and calibration A. De Caro (University and INFN of Salerno)
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
Status of CLAS12 PCAL project
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
CLAS12 CalCom Status Update CLAS Collaboration Meeting November 14, 2014.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Thomas Jefferson National Accelerator Facility Page 1 12 GeV Software and Computing Review Jefferson Lab February 10-11, 2015 Hall B:User Experience and.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Hall-D/GlueX Software Status 12 GeV Software Review III February 11[?], 2015 Mark Ito.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Thomas Jefferson National Accelerator Facility Page Hall B:User Software Contributions Gerard Gilfoyle University of Richmond 12 GeV Upgrade Software Review.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
HCAL General Meeting: DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova Frank Chlebana HCAL General Meeting Apr 21, 2011.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
CBM ECAL simulation status Prokudin Mikhail ITEP.
SoLID simulation with GEMC Zhiwen Zhao 2015/03/26.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
 -bin Number Tower Calibration (ch/GeV) Desired E T matched gain s  =1.0  =2.0 from electrons slopesMIPs EEMC Towers Calibration Run 3 p+p Used 4 methods.
CLAS12 Trigger System part1: Level1 EC Revision 1, Feb 7, 2007.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, June 14 th 2012.
2014 CalCom Activity Plan based on last year’s work and open discussion: Periodic meetings with detector groups to discuss algorithms, discuss software.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
BEACH 04J. Piedra1 SiSA Tracking Silicon stand alone (SiSA) tracking optimization SiSA validation Matthew Herndon University of Wisconsin Joint Physics.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
EC Software Suite 1 EcMon: Monitors raw, calibrated and reconstructed data in real-time with detector map navigation, strip- charts, histograms. Single-event,
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
Thomas Jefferson National Accelerator Facility Page 1 CLAS12 Workshop Jefferson Lab February 23, 2016 Time-of-Flight Software Status Jerry Gilfoyle, Evgeny.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Custom Classes DetectorShapeView2D: Detector mouseover callbacks (default is mouse click). EventControl:
 13 Readout Electronics A First Look 28-Jan-2004.
Forward Tagger Calorimeter Prototype tests at Jlab: report CLAS12 Workshop February 22, 2012 A. Celentano.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
CLAS12 DAQ & Trigger Status
CLAS12 DAQ/Trigger/Online Status
CLAS12 DAQ, Trigger and Online Computing Requirements
CLAS12 software workshop
Nick Markov, UCONN Valery Kubarovsky, JLAB
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
FORWARD CARRIAGE UPDATE – March-July 2015
CLAS12 First Experiment Workshop Report
5% The CMS all silicon tracker simulation
DC monitoring - calibration - simulation - corrections
BESIII EMC electronics
Commissioning of the ALICE-PHOS trigger
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT gains and occupancy of PCAL and FTOF largely stable after 1½ years of running. ECAL issues: Light leaks opened up due to disturbance of taped seams during cable installation. CAEN HV repairs (5 boards and a power supply returned). Some electronics cabling was postponed until patch cables were available. This work is mostly finished and full checkout of ECAL should be completed by end of Next major goal is development of energy sum / cluster trigger in Central Trigger Processor (CTP) when hardware becomes available in early “Final” ECAL/PCAL cosmic calibration will use CTP-based trigger for greater flexibility and efficiency studies of both detectors and trigger.

CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update2 Forward Carriage Commissioning FTOF1A FTOF1B PCAL ECAL Raw Integral Up to now cosmic data taken with FADC raw mode (mode 1) with pedestal subtraction, thresholds and peak summing performed in event decoder and DST ntuples written to disk. Currently we are evaluating pulse mode (mode 3) to enable better data compression and write EVIO files for testing COATJava calibration suites. This requires fine tuning FADC NSA,NSB window parameters and TET thresholds to take into account different pulse shapes in PMTs and optimize pulse integral.

U V Simulation CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update3 GEMC now includes time propagation of light along strips for ECAL and PCAL. DGTZ banks: Raw counts x 24 ps/count to simulate both V1190 / V1290 TDCs. Simulation checked against data using time differences between cosmic muon hits in different U,V,W layers (below). Δ t (U-V) vs. V PMT GEMC Forward Carriage ECAL Sector 1 Forward Carriage data show effect of different cable and light guide lengths and provide estimate of time resolution for simulation. Effective velocity 16 cm / ns

Simulation CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update4 GEMC now properly simulates gain matching algorithm for FTOF. PMTs are not gain matched to each other, but Left, Right adjusted so geometric mean (sqrt L×R) is independent of counter length z. Overall attenuation factor of exp(- 0.5 z / λ ) is built into HV adjustment, in addition to L,R gain balancing. This factor was added to ftof_hitprocess.cc in GEMC. sqrt(L×R) from GEMC before after GEMC Data Pane l 1A 1B

Calibration CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update5 ECAL: Number of events per pixel ECAL: Average ADC per pixel COATJava GUIs developed to display raw and filtered data relevant to ECAL / PCAL energy and timing calibration. GUIs currently use legacy code for isolating suitable muon tracks (pixel cut). Plan is to replace this code with online ECReconstruction service (EcRec). EC Calibrator (EcCal) will perform fitting and display of calibration results (gains, attenuation lengths, timing offsets and other constants.) PCAL: Browser PCAL: Browser ETJava EcRec EcCal CCDB Work in progress: ETJava service, DAQ/CLON prep (Gagik, Sergei) EcRec, CCDB tables (Cole) Schedule: Oct-Nov: Forward Carriage testing of ETJava + event decoder + EcRec. End of 2015: EcCal ready for testing service chain outlined above. Needs to be in place for testing CTP trigger (EcRec vs. FPGA based cluster finding) in 2016.

Reconstruction CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update6 EC / Fortran K. Beard S. Stepanyan W. Brooks EC / Fortran K. Beard S. Stepanyan W. Brooks ECAL / Java S. Mancilla ECAL / Java S. Mancilla PCAL / Java M. Wood PCAL / Java M. Wood EcRec / COATJava / Common Tools G. Gavalian Detector Factory J. Hankins EcRec / COATJava / Common Tools G. Gavalian Detector Factory J. Hankins present EC reconstruction package currently being evaluated by C. Smith in collaboration with Gagik. Under COATJava EC is a unified detector with 3 superlayers: 0=PCAL 1=ECAL inner 2=ECAL outer. Output bank consists of lists of hits, peaks and clusters for each superlayer. ECReconstruction class does not attempt cluster matching between superlayers. Some missing elements need to be re-implemented: 1.Introduction of calibration constants from CCDB (in work). 2.Re-entry points in code for attenuation correction and iteration of reconstruction (in work). 3.Indexing to allow identification of hit members in clusters, peaks (for iteration, calibration). 4.Configuration parameters (thresholds, peak/cluster/iteration options, etc.) 5.Methods for handling two-cluster identification with shared energy in peaks (for pi-zeros). Priorities and Schedule Get elements 1-4 working for cosmic CTP trigger studies (Jan 2016). Implement two-cluster algorithm and test with GEMC studies (Spring 2016). Sector-based trigger: Geometry-based cluster matching in CTP or SSP? Needed for energy sum.