GLAST LAT ProjectPisa 9/1/04 A.Brez 1 GLAST Large Area Telescope: Grid interface proposal Alessandro Brez INFN Pisa Gamma-ray Large Area Space Telescope.

Slides:



Advertisements
Similar presentations
Manufacturing Processes lab I Running a lathe machine
Advertisements

How to center the top roller Current Situation The slider is not centered because the bottom slider was not placed at 6 o’clock ?!
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Aerospace Fastener Applications
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMay 20, 2003 LAT Engineering Meeting Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Revisions to Tray Design.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
TKR-Grid I/F Design Options Grid TKR Flexure Shoulder Bolt (close fit) Conical Bushing Grid TKR Flexure Shoulder Bolt Collar/Pin with conical head (pressed.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
Progress on the Coupling Coil & Focus Coil Interface Engineering
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Toshiba high pressure turbine casing for 600 MW power station, showing unusually long clamping bolts with very narrow flanges 1 Bolts in Tension pt 2 Andrei.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
Chapter 11 keys, coupling, and seals
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
© Penn State Food Safety and Sanitation for Food Manufacturers Course Equipment Sanitary Design.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
Small Hole Gauges & Telescoping Gauges. Small Hole Gauges These gauges are used to measure small holes that you need to know the exact measurement.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
Toshiba high pressure turbine casing for 600 MW power station, showing unusually long clamping bolts with very narrow flanges 1 Bolts in Tension pt 2 Andrei.
GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.
Tracker Subsystem GLAST LAT Project 1 ANNEX 1 to NCR/FM/INFN/PI/372 STATIC TEST TORQUE LOSS OUT OF SPEC’S ON BOTTOM TRAY S/N 005 Andrea Tenze
GLAST LAT Projecttitle - MRB 21 June 2005 R. BAGAGLI 1 Threads on flexure MRB Meeting – 21 June 2005.
Annex 5 - Tower and Lock installation
Update on Pavia MM mechanical prototype
Metalwork Threaded Fasteners.
GLAST Large Area Telescope:
Report on construction of LP2 spaceframe endplate
Open Issues Modification of Cactus Arm bending tool required
GLAST LAT System Engineering
MIS™ EM IM Display Top Tray
GLAST Large Area Telescope:
The encapsulation problem of the LAT heavy trays
1st solution. Cut internal to the plate with startup hole
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectPisa 9/1/04 A.Brez 1 GLAST Large Area Telescope: Grid interface proposal Alessandro Brez INFN Pisa Gamma-ray Large Area Space Telescope

GLAST LAT ProjectPisa 9/1/04 A.Brez 2 Last failure The last vibe test failed essentially because: 1)The tolerance between screw shoulder and grid hole was too large (~0.1mm) 2)The screwed part was too short (~3mm) 3)The steel shoulder damaged the Al hole Result: the 4 corner screws were unlocked ¼” 4.95mm thread Al Steel screw with shoulder ¼”-3mils Ti ¼”+1mil

GLAST LAT ProjectPisa 9/1/04 A.Brez 3 Proposal 1)The tolerance between screw shoulder and flexure/grid hole has to be tight on long 2)The grid has to be reinforced with an insert that distributes the load on a larger diameter. We consider the idea to have the tight tolerance by construction even on few points (3) dangerous, we can have real problems mounting all the towers (3X16 joints). The possibility to have a failure mounting one tower cannot be excluded. In the EM tower, with a simplified coupling (cylindrical holes ¼”) we could mount the tower to the grid because there was a 0.1mm tolerance in the shoulder-hole coupling

GLAST LAT ProjectPisa 9/1/04 A.Brez 4 Our concept To guarantee a safe and symmetric joint we propose to separate the alignment points from the joint points. 1) Mount the alignment jig to the bottom tray 2) Dry test 3) Put the inserts with epoxy 4) Align back the tower to the grid 5) Place the screws, RT cure of the adhesive 6) Final torque of the screws, alignment tool is removed

GLAST LAT ProjectPisa 9/1/04 A.Brez 5 Alignment tool The alignment tool is mounted on the bottom tray using the bottom tray reference holes and the M2.5 threaded holes Reference points  3 (the same reference points used for sidewall mounting)

GLAST LAT ProjectPisa 9/1/04 A.Brez 6 Reference to the grid On the grid there are 3 other reference holes. The pin/hole tolerance can be 20  m without mounting problems (3 points)

GLAST LAT ProjectPisa 9/1/04 A.Brez 7Inserts

GLAST LAT ProjectPisa 9/1/04 A.Brez 8

GLAST LAT ProjectPisa 9/1/04 A.Brez 9 The inserts