2008013448 Choi Su Min.  1.HULL WORK - the steel is cut, shaped and assembled into block in accordance with the design, Normally 150~200 blocks are.

Slides:



Advertisements
Similar presentations
Product Design Lesson 1 – Lamination. Lamination Sometimes it is not economical or suitable to use a solid wood in the production of a product. This is.
Advertisements

Wright Line By Alexzander Downs Noopur Srivastava Amit Chaturvedi Amit Jhawar Yi-fang Lin.
Lecture 9: Structural Engineering Design and Drafting
Ship witch. Designing the ship in a computer program AUTO CAD.
___________________________________________________________________________ Operations Research  Jan Fábry Cutting Stock Problem Linear Programming.
MGT Liquid & Process Systems Designing and manufacturing of custom-made, innovative stainless steel process solutions Privately owned 40 years of experience.
SAMSUNG HEAVY INDUSTRIES SAMSUNG Global Trend toward Protection of the Environment in Shipbuilding Industries October 16, 2010 Samsung Heavy Industries.
HYDROFORMING PROCESS SHORT DESCRIPTION DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from John Andersen.
Skilled Trades 1201 Floor Framing
Company Profiles and Introduction
View from the bridge wing in the drydock of open cargo holds forward.
Our Profile Corporate Milestone MSE start to established First Dry-docking repair for bulk.
Shipyard Layout. Big Bigger Biggest Manufacturing Processes.
Regal Marine Design Process A design group comes up with ideas for new boats that will fit in with the image of Regal Marine The design is then checked.
Buoyancy and Archimede’s Principle
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
 What I learned from doing this project was, Surface Area. We had to find the total surface area of the cars, break down the car into shapes and find.
BHEL Haridwar. BHEL – A Glance Indian integrated power plant equipment manufacturer, established in Products and services available for Power, Transmission,
Stunningly beautiful wooden yachts with superb performance, combining elegant looks with state of the art marine technology. These yachts are immensely.
Ship Building Process Su-jin Kim Manufacturing Process
Enduring Idea: Fantasy Topic: Architecture First Grade Janet Malone Lakeview Design Center.
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
Penny Boat Lab Analysis
PUBLIC JOINT STOCK COMPANY Kerch, August 2013 Shipyard ZALIV.
1 Kemano, British Columbia, Canada 1950 to 1954 The largest underground power house in the world at the time.
Ken YoussefiUC Berkeley 1 Structural, Piping, and Welding Drawings.
 1. steel cutting  2. block  3. deck house.
IBTTA April 19, 2009 Bay Area Toll Authority San Francisco-Oakland Bay Bridge East Span Seismic Replacement Project.
Investment Project Black Sea Ship-building Yard. 2 Key Information Public JSC “Black Sea Ship-building Yard” is one of the largest ship-building.
TYPES OF AIR TRANSPORTATION
Section 2.  How can a huge ship float? Because the force pushing up on the ship opposes the weight of the ship pushing down  Supporting force is called.
Structural Engineering Design and Drafting
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
최민 수 Choi Min Su.  Introduction of Hyundai Hysco  Definition of cold rolled steel & steel pipe  Manufacturing process of cold.
___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Cutting Stock Problem Linear.
Maritime Museum – Litochoro Litochoro’s Maritime Museum is located in the centre of our town. It is a quite recent museum, with exhibits related to the.
 Explain how and why you might use acetate and foam in an architectural model.
Arbor Project Copyright © Texas Education Agency, All rights reserved.
Lesson 2: Manufacturing. *What is JIT? Just-in-time (JIT) is an inventory strategy that strives to improve a business's return on investment by reducing.
Supplier Development project Tools for supplier development Inspiration for tools to be used in workshops.
Volume and Surface Area Review. How much cardboard would you need to make a shipping carton with dimensions 10 inches by 8 inches by 20 inches?
The Gateway of Indian Drop Forging Welcome to Veraval Main Road, Veraval (Shapar) – , Dist. Rajkot, Gujarat, India. Phone no. : /3030,
АНАЛИЗ ИСПОЛЬЗОВАНИЯ ТЕРРИТОРИЙ СРЗ «НЕРПА» ДЛЯ РАЗМЕЩЕНИЯ ГРАЖДАНСКИХ ЗАКАЗОВ Construction and modernization of fishing vessels.
Best Quality Green Technology High Confidence
UNIT 2 MARINE VEHICLES Marine vehicles operate in or on water, for the purposes of transportation, recovery of natural resources, warfare, research or.
WHAT IS IT? Investigating Literature Through Pictures.
Part One “The Importance of Inventory.” Chapter Six: Inventory.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
Add: Gieng Day – Halong city – Quang Ninh province * Tel: * Fax: * Tel: * Fax:
Activity Tracker This is Activity Tracker for residents of Living It Up Retirement Community. This is a pocket sized guide that can easily be transported.
TOPIC 4: SHIPYARD PRACTICES.
Objective - To solve work problems Work Rate TimeWork Done Work Rate TimeWork Done 5 hrs.1 Job.
Universal Systems Model. Has 4 elements – Has 4 elements – Inputs Inputs Process Process Output Output Feedback Feedback.
Financial Elements 1. Firm’s Main Objective is Value Creation for Shareholders and Other Stakeholders.
The Process of Making The Best CO2 Machine! Agricultural Mechanics / Woodshop Mr. Weaver The Process of Making The Best.
UNIT - 4.
Beautiful.
Why Door Com?.
Project Charter 1 4 Business Case Roles & Responsibilities
Teknologi Dan Rekayasa
Benefits of Building a Home in Shipping Containers
Arch205 building construction wall systems- Steel
FILL IT UP!! FILL IT UP!! FILL IT UP.
International Chamber of Shipping
Building Construction I Sofia Sebastian 1
One way to find the surface area of ANY SOLID:
STEEL PLATES.
Ferrol Shipyard Total area : m² Dock equipment : m.
Regression and Correlation of Data
Presentation transcript:

Choi Su Min

 1.HULL WORK - the steel is cut, shaped and assembled into block in accordance with the design, Normally 150~200 blocks are required to assemble one ship.  2.TRANSPORTING - The equipment to transport block to the work place.  3.FITTING WORK - block undergoes fitting and painting work in shelter house.  4.DOCK WORK - Blocks are assembled in the dock. After assembling all block the dock is filled with the sea-water for launching the ship.  5.QUAY - The work -place for fitting works after launching, and Various on-board tests are carried out before sea-trial. HMD has 2.6Km long quay.