Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.

Slides:



Advertisements
Similar presentations
Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa 1 STATUS REPORT.
Advertisements

JWG, 14 October, 2009, Vladislav Manko Status of work and plans of the Russian group in the ALICE Collaboration as of October, 2009.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
PSD upgrade: Ar-present and Xe-future 1.- Status of the PSD upgrade 2.- PSD performance after upgrade 3.- Problems during the Ar-run 4.- Future scenarios.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Применение MAPD (Zecotek) в адронных калориметрах и многоканальных времяпролетных системах в экспериментах по релятивистской ядерной физике Ф.Ф.Губер,
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
first results from EMCal test beam
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
A.Olchevski, JINR (Dubna) Test Beam studiesof COMPASS ECAL0 Test Beam studies of COMPASS ECAL0 module prototype with MAPD readout ECAL0 Team, JINR, DUBNA.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
GEM Integrated PCB readout and cooling
The PSD at Pb-Pb run PSD drawbacks at Ar beam
Experimental Method: 2 independent detectors on both sides of IP
Calorimeter Mu2e Development electronics Front-end Review
Analog FE circuitry simulation
Start Detector for pion experiments
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
F.Guber, A.Ivashkin INR, Moscow
LHCf – CSN1 Trieste O. Adriani
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Experimental Method: 2 independent detectors on both sides of IP
MEG II実験 液体キセノン検出器の建設状況
Presented by T. Suomijärvi
Presentation transcript:

Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD gain monitoring system -PSD readout upgrade -Nearest plans F.Guber & A.Ivashkin, (INR, Moscow) NA61/SHINE Collaboration meeting, Wroclaw, Poland, October ,

Problems with the PSD in Be-runs 1.No PSD MAPDs and electronics cooling in 2011 Be run; Be runs - the air flow from underground for cooling; Not effective cooling system! 2.The temperature sensors in modules have been not working properly (strange long term behavior of T-sensors). Only 3 normal t-sensors have been used in the last 2013 Be run. 3. HV control system didnt not readout MAPD voltages (minimum functionality). 4. No monitoring system for the MAPD gains (minimum functionality). 5. The rise time of PSD trigger signal is slow – problem with the time-amplitude walk and signal delay in trigger box. 6. Electronics noises are rather small but comparable with MIPs signal. It makes problem with muon calibration. E beam =30AGeV Energy in PSD Temperature MAPD gain ~4 %/ 0 C 2

Strategy of the PSD upgrade in New cooling system with air chiller. 2.New temperature control system. 3. New HV control (readout of real voltages). 4. Monitoring system for the MAPD gains (LED stabilized source). 5. New PSD trigger signal after fast amplifiers. 6. New readout system (fast amplifiers+ DRS4). 7. Compatibility with existing readout. Present status of the rare side of the PSD 3

60 layers Al plate HV distributor PCB board End cover Plastic tube Lead-scinti, WLS-fibers with 11 optcal 11 SiMs board with with electronics with air inlet from air ~120 cm connectors T sensor (Power 0.5W) distributor box 100 – 160 mm Could be ajust in this range Temperature in this area should be ~20 ◦ ±1 ◦ New structure of the PSD electronics and temperature control system Chiller/heater (t~16-20 ○ ) Air distributor box Pumped air Valve on each module air tube 4

Heat sources around photodetectors In PSD module (simulation results - G. Camplone, Enrico Da Riva (CERN)) Main source of heat is FEE !? Effect of surrounding air temperature is negligible? The total heat transferred from the outer surfaces with the room temperature (T = 28 degrees) is highly inferior to the power which dissipate from the PCB board (0.5 W) 5

Temperature distribution in the PSD module (simulation results) Inlet air 12 0 C V=1.26 m/c Air velocity Surrounding air T=28 0 C Air flow does not help? Needs experimental tests! T MAPD ~26 0 C The final concept of the PSD cooling is not fixed yet! 6

New slow control system. Originally developed for COMPASS ECAL Can control up to 127 devices (modules). Can control the gain monitoring system too (next slide). Connection with external computer: USB-2.0 or RS-232. Internal bus: RS485 Maximum length of bus cables: 50 m Controller for SC New HV distribution system Extremely low power consumption. HV stability – 0.01%. One external power supply ~12 V. Permanent check of correct HV values within given HV gate - There is feedback to HV values! Already tested for a few years! ! Developer - HVSys Co., Dubna. It constructed the slow control for COMPASS EM calorimeter with MAPD readout. 7

MAPDs gain monitoring system Light amplitude is controlled by PIN-diode inside with very low temperature dependence. Control of MAPD gain at <1% level 1 device in one module. Based on stabilized LED source. 8

The PSD trigger signal 60 ns 300 ns MAPD signal M~5x10 4 integrated signal M~10 7 ADC signal Be runs: the PSD trigger signal comes after integrators with rise time ~60 ns: rather slow and large time- amplitude walk. Needs careful adjustment for each beam energy and each beam ion. In :…. trigger signal after MAPD – fast signal, no problem with time walk and delay. Fast trigger requires new amplifiers and new adders. Matching with DRS4 readout is needed. Additional (service) PCB to be compatible with old readout is required. 9

First prototype of FEE and slow control system is ready MAPDs Al-plate+ T-sensor LED source HV channels 10 Analog signals +trigger (adder) SC connector PCB with amplifiers and adder Test of prototype is ongoing now 10

PSD upgrade plan: -July – September (Moscow) Production of FEE prototype and test at test-bench. -October-November (CERN) Assembling and test of new electronics for one module at CERN -November – February 2014 (Moscow) Mass production of new PSD electronics. -March – April 2014 (CERN) Installation and test of the PSD electronics and temperature control system at NA61. Summer 2014 –the PSD test on cosmic October 2014 – test/calibration of the PSD with proton (better with muon beam!) Estimated beam time ~ 3-4 days. Important question – upgrade of the PSD platform control system should be ready before October

Thank YOU 12