TYPE OF WORK FY 2015 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH K -- Rural Road to STH $75,000 2,250 PE CTH E -- CTH B to STH $120,000$30,000 $150,0001,570 R/W CTH E -- Crystal River Bridge--- $8,000$2,000 $10,0002,820 C/P CTH W -- USH 45 to STH $1,852, C/P CTH I -- CTH Y and Paape Rd Intersections0.75 $200, B CTH J -- Little Wolf River Bridge--- $212,800$53,200 $266, *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving *B Bridge *ADT Average Daily Traffic
TYPE OF WORK FY 2015 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT P CTH T -- Collier Road to CTH N 4.62$697,900 1,135 P CTH F -- Weyauwega to Gills Landing 2.15$350, P CTH C -- CTH E to STH $1,100, P CTH D -- Northridge Drive to Spurr Road 0.45 $111,500 3,350 P CTH D -- Spurr Road to USH $115,000$93,150 $208,1501,510 P CTH D -- Beckert Road to Beacon Street 1.00 $181,500 3,800 P CTH E -- CTH G to CTH C 0.79 $143, *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving *B Bridge *ADT Average Daily Traffic
2015 Totals MILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST 25.28$4,000,000$455,800$889,350 $5,345, Goals PEOur goal is 5.0 miles miles RWOur goal is 5.0 miles miles COur goal is 5.0 miles miles POur goal is 17.0 miles miles *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving
CTH “W” USH 45 to STH 96 Construction & Paving Scheduled for 2015 CTH “E” CTH “G” to CTH “C” Paving Scheduled for 2015 CTH “F” Weyauwega to Gills Landing Paving Scheduled for 2015 CTH “C” CTH “E” to STH 110 Paving Scheduled for 2015