TYPE OF WORK FY 2015 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH K -- Rural Road.

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

Highlights of NE Region State & Local Highway Program
February Highway Plan Reading Engineering Services Location and Design Division Virginia Department of Transportation.
O utstanding H ighway C onstruction C onstruction A wards 2012.
County Transportation Systems Association of MN Counties, MN County Engineers Association, MN Inter-County Association Presentation to MN Senate Transportation.
ESTONIAN ROAD ADMINISTRATION Pärnu mnt. 463a Tallinn, Estonia Tel (0) Fax (0)
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
ROUTE 27 (PARK STREET) CORRIDOR SEWER EVALUATION Mark J. Thompson, P.E. Gus O’Leary Kleinfelder / S E A Consultants Inc.
IRTBA “STATE OF THE INDUSTRY” Will County FY 2012.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
Albemarle RPO Project Update North Carolina Department of Transportation May 2011.
Transportation in Northern Kentucky Rob Hans, P.E. Chief District Engineer, District Six SAME, Cincinnati Post - April 15,
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
Proposed State Highway Projects: Kendall County September 20, 2007 Region 2/District 3 Illinois Department of Transportation.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
STH 29 and CTH O Construction Project Manager: Richard Simon Project Leader: Dave Julson.
LHTAC1 LOCAL HIGHWAY JURISDICTION EFFICIENCY  Add Reporting/Performance measures to the Road and Street Finance Report  Undertake a study to evaluate.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Local Rural Highway Investment Program (LRHIP)
ENGINEERING & CONSTRUCTION DIVISION GERALD N. BRINTON, P.E. COUNTY ENGINEER / DIRECTOR OF ENGINEERING & CONSTRUCTION VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
Creating a Critical Crash Rate Report Using Existing Tools and Available Information Heath Hoftiezer, P.E., P.T.O.E Civil Engineer/ P.E. (Traffic) City.
The Challenge The intersection of State Highway 13 and County Road 2 in Scott County, Minnesota, was the site of 2 fatal crashes and 50 injury crashes.
Illinois Highway Statistics Population12.9 Million Licensed Drivers8.19 Million Vehicles Registered11.05 Million Passenger Cars Registered7.98.
A Cross-State Comparison of Arkansas's Highway Financing and Infrastructure Quality.
Dane County Department of Public Works, Highway & Transportation Jerry Mandli, P.E. Commissioner/ Director.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
STA Safety Project PID #76439 December 12, 2006.
8/7/02 Dane County Vandewalle & Associates Strand Associates William O’Connor Roadway Concept Select Link Traffic Modeling August 7, 2002.
Julie Skallman State Aid Division Director & State Aid Engineer.
NATIONAL ASSOCIATION OF COUNTY ENGINEERS Timothy Hens, PE NACE State Director – New York County Engineer, Genesee County, NY.
State Aid prepares the Agreements for  Force Account (FA)  Right of Way (ROW)  Preliminary Engineering (PE)  Construction Engineering (CE) State Aid.
Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015.
Waupaca County Highway 5 Year Plan We build and maintain a quality transportation system for the safety and prosperity of current and future.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
N EW O HIO R IVER B RIDGE JEF-Wellsburg Bridge – PID#79353 New Ohio River Bridge Steubenville Weirton Map Data © 2015 Google Steubenville, OH - Weirton,
Geometric Design: General Concept CE331 Transportation Engineering.
MED SR 18 Corridor Project MED PID October 13, 2015.
Presentation to the Washington Transportation Commission March 16, 2010 Washington State Association of County Engineers.
TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago.
Driver Education Rural Driving 82% of all miles in the U.S. are Rural Roads. Collisions in rural areas are equal to 2 x as many highway deaths as in.
District 6.  Workload Beyond Normal Program  Accelerated Project Schedules  Additional Funding  Technical Expertise Not Available In Department.
Yuma County Report Roger A. Patterson, P.E. County Engineer June 5, 2008.
Welcome!. OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville,
PUBLIC WORKS DEPARTMENT
Chapin Town Hall Meeting
Calumet county highway department
2017 TYPE OF WORK FY 2017 SUMMARY MILEAGE LONG TERM FINANCING
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Chapter One Driving and Mobility
Highway 14 – Owatonna to Dodge Center District 6 Update
General Tab Project, Cost Schedule, and Work Limits Roadway Character
SR 25 – Hoosier Heartland Highway Lafayette to Logansport
North Main Street Intersection Improvements at Route 460 Bypass
Pavement Performance Measures In Georgia
Federal Funding for Agreements
Geometric Design: General Concept CE331 Transportation Engineering.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Southern Bridge Project Brown County Executive
MESA COUNTY SNOW PLOW PROGRAM.
Lecture Traffic Engineering Assistant Lecturer: Areej Muhy
Monterey County Project Report for Measure X Expenditures
Presentation transcript:

TYPE OF WORK FY 2015 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH K -- Rural Road to STH $75,000 2,250 PE CTH E -- CTH B to STH $120,000$30,000 $150,0001,570 R/W CTH E -- Crystal River Bridge--- $8,000$2,000 $10,0002,820 C/P CTH W -- USH 45 to STH $1,852, C/P CTH I -- CTH Y and Paape Rd Intersections0.75 $200, B CTH J -- Little Wolf River Bridge--- $212,800$53,200 $266, *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving *B Bridge *ADT Average Daily Traffic

TYPE OF WORK FY 2015 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT P CTH T -- Collier Road to CTH N 4.62$697,900 1,135 P CTH F -- Weyauwega to Gills Landing 2.15$350, P CTH C -- CTH E to STH $1,100, P CTH D -- Northridge Drive to Spurr Road 0.45 $111,500 3,350 P CTH D -- Spurr Road to USH $115,000$93,150 $208,1501,510 P CTH D -- Beckert Road to Beacon Street 1.00 $181,500 3,800 P CTH E -- CTH G to CTH C 0.79 $143, *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving *B Bridge *ADT Average Daily Traffic

2015 Totals MILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST 25.28$4,000,000$455,800$889,350 $5,345, Goals PEOur goal is 5.0 miles miles RWOur goal is 5.0 miles miles COur goal is 5.0 miles miles POur goal is 17.0 miles miles *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving

CTH “W” USH 45 to STH 96 Construction & Paving Scheduled for 2015 CTH “E” CTH “G” to CTH “C” Paving Scheduled for 2015 CTH “F” Weyauwega to Gills Landing Paving Scheduled for 2015 CTH “C” CTH “E” to STH 110 Paving Scheduled for 2015