Profiling Working Group August 14, 20031 PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting August 14, 2003.

Slides:



Advertisements
Similar presentations
1 Distributed Generation Task Force November 5, 2007.
Advertisements

Profiling Working Group May 15, PWG Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for WMS Meeting June 18, 2003.
Retail Market Subcommittee Update to TAC February 5, 2004.
Profiling Working Group March 13, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 13, 2007.
ERCOT Staff Comments Regarding the Proposed Suspension of Residential 2005 Annual Validation RMS Presentation August 10, 2005.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
COPS Update to TAC January 6, Voting Items Three voting items: COPMGRR015, Creating Section 8, ERCOT Settlement and Invoice Process 2. 2.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
1 Profiling Working Group Update to COPS April 15, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
Profiling Working Group July 17, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting July 17, 2003.
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
TX SET Update to RMS Wednesday, October 10, 2007.
1 RMS TAC Update March 6, Texas Test Plan Chair; Bill Bell Centerpoint Energy Vice Chair; Leanne Hayden Centrica COMET Chair; Terry Bates TXU.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
Profiling Working Group June 12, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting June 12, 2003.
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
1 Commercial Operations Sub-Committee Update to TAC October 5, 2007.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
1 RMS Update - ERCOT June 10, Supporting Reports Section.
Profiling Working Group December 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting December 11, 2003.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Profiling Working Group March 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 14, 2006.
1 PWG Update Report By Ed Echols Of Oncor ERCOT PWG Chair Jim Lee of Direct Energy ERCOT PWG Vice Chair for COPS Meeting Sept 10, 2014.
Demand Response Status Report Calvin Opheim October 9, 2007.
RMS Update to TAC April 7, RMS Voting Items  RMGRR032- Transaction Timing Matrix Corrections Includes updates to Appendix D to correct examples.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
PWG Profiling Working Group March 20, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting March 20, 2003.
1 Profiling Working Group 2014 Accomplishments & 2015 Goals.
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
1 RMS Update - ERCOT May 14, Supporting Reports Section.
Retail Metering Working Group Progress Report 04/15/09.
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Profiling Working Group October 16, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
COPS JULY 2014 UPDATE TO RMS 8/5/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
DRG Slides for PWG Update to COPS. 2 Highlights from the DGTF Recommendation - 3 Small DRG applies to generation less than 50 kW –Profiling is applicable.
COPS NOVEMBER 2014 UPDATE TO TAC 11/20/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
Distributed Renewable Generation Profile Implementation Plan.
Profiling Working Group June 15, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting June 15, 2005.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
Retail Market Update August 6, Load Profile Guides In accordance with section § (e) (3) and PUCT Project 25516, Load Profiling and Load Research.
Profiling Working Group April 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting April 14, 2004.
Profiling Working Group March 18, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting March 18, 2004.
RMSUpdate May 5, 2005 Retail Market Subcommittee Update to TAC.
1 New MO Projects June COMS Extract, Report & Web Services Monitoring & Usage Statistics Jackie Ashbaugh.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Profiling Working Group January 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 14, 2004.
1 PRR479 IDR Optional Removal Threshold (ERCOT Project PR40055)
Oil and Gas Profile Implementation Plan. 2 BUSOGFLT Background ERCOT received Oil and Gas Profile Segment request ERCOT completed.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting December 3, 2007.
Commercial Operations Sub-Committee Update to TAC January 8, 2009 Lee Starr, BTU.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting June 11, 2007.
Module 1 From Bundled Utilities to Current Market Design.
PWG Profiling Working Group December 18, RMS Presentation by Ernie Podraza, PWG Chair Annual Validation 2002 DLC Implementation.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
-- Presentation from PWG -- Profile ID Assignment and Annual Review Process November 17, 2005.
Commercial Operations Sub-Committee Update to RMS
Nodal COMS Additional Items Update
Profiling Working Group
PWG Update Report By Ernie Podraza for RMS Meeting June 12, 2003
Commercial Operations Sub-Committee Update to TAC
Presentation transcript:

Profiling Working Group August 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting August 14, 2003

Profiling Working Group August 14, Next PWG Meetings 8/19, 8/20 and 9/11. New Profile Cost Recovery Method per PUCT Project Annual Profile Type and Weather Zone Validation. Opt-in Entity Issues for PWG. Oil and gas properties profile change request. Direct Load Control (DLC) Project Status. IDR Requirement Report. Default Profiles.

Profiling Working Group August 14, PUCT Project 25516, Load Profiling and Load Research Rule. 1.Approved at open meeting 3/05/03. Effective Date April 16, 2003 (Oct. 16, end of 6 months). 2.ERCOT has 6 months to establish a procedure to provide a method of recovery of research costs associated with obtaining a new profile by a sponsoring Market Participant. a)ERCOT presented a strawman at the 5/07/03 PWG meeting. b)PWG refined the strawman at the 5/28/03 PWG Meeting. c)PWG presented alternatives at the RMS meeting on 6/12, Pay As You Go was selected. d)Per PWG meetings 6/18, 6/19 and 7/09, the PWG has drafted a PRR and LPGRR. e)PRR442 and LPGRR i.7/17/03 RMS approved, urgent status approved at 07/24/03 PRS and 8/6/03 TAC meetings, and PRS Comments due: 08/11/03. ii.PRS Review: 08/21/03, Comments on PRS Recommendation: 09/03/03, TAC Consideration: 09/04/03, Board Consideration: 09/16/03.

Profiling Working Group August 14, Annual Profile Type and Weather Zone Validation.

Profiling Working Group August 14, Based on 12 months ending April 2002 and using the usage month algorithm in current Profile Decision Tree. Percentages are for a residential and a business sample of 20,000 ESIIDs each per TDU pulled in November 2002 and not over the whole population.

Profiling Working Group August 14, Opt-in Entity Issues for PWG. 1.Nueces and San Patricio. 2.Texas SET Version 1.5 Mid July, Invite the Muni and Coop Segment participation. 4.ACTION ITEMS: a)Initial Validation of Profile Id Assignments. b)Updates to the LPG, Load Profiling Guides. c)Updates to Protocols. d)Shall be using the Profile Decision Tree Version e)Both entities working with ERCOT staff to get data loaded. i.San Patricio may opt-in Spring ii.Nueces does not yet have profile id assignments.

Profiling Working Group August 14, Oil and gas properties profile change request. 1.Submitted to ERCOT 3/6/03 by Pioneer Natural Resources, Priority Power Management, and Energy Data Source. 2.ERCOT to post to WEB. 3.Argument is that the aggregate profile is a very high load factor profile, close to flat. 4.ERCOT is to evaluate and submit recommendation to PWG. 5.May test the new PUCT Rule for reimbursement. 6.ERCOT shall post the methodology request to the Market Information System (MIS) and respond to the request within sixty (60) days of the posted date of the request. This period does not include the time to analyze and render the complete assessment of the request. 7.“ERCOT withholds a decision on making a recommendation on whether to adopt or to deny adoption of the suggested profile change; instead ERCOT finds the request, as submitted, is incomplete and deficient. The requestors are invited to address the incompleteness and deficiencies listed below and re-submit the request for further review.” 8.Per 6/19 PWG meeting, a straw-man in development for changes to the profile change request process and to allow lagged dynamic samples.

Profiling Working Group August 14, Direct Load Control (DLC) Project Status. 1.PRR 385 Section 18 is complete with Board Approval 5/20/03. 2.LPGRR is attached to PRR385, approved by TAC 7/02, reviewed by Board, and the LPG is updated). 3.ERCOT Schedule is pending, Project Manager assigned. 4.ERCOT and some Market Participants question priority going forward. 5.PRR Section 6 Language for DLC still needs to be written for a PRR. 6.Memo, on Project on Competitive Metering, May 8, 2003, by Commissioner Perlman suggests that wires companies need to develop a rate structure that provides strong incentives for demand responsiveness by charging different rates during high load periods. 7.PRR388 and PRR400 does not completely cover DLC issues.

Profiling Working Group August 14, IDR Requirement Report 1.07/03/03, ERCOT issues IDR_threshold_analysis_ xls. 2.July 30, 2003, ERCOT issues a Market Notification for IDR Requirement File on Portal. 3.PWG discussed on 7/30/03. Background: a)The report was issued in the spring of 2002 and manually sent to market participant contacts. b)The report was again issued in the spring of 2003 and manually sent to market participant contacts. c)The report was automated on monthly basis on 5/2, 6/2, and 7/2/03.

Profiling Working Group August 14, IDR Requirement Report Load Profiling Guides, Section Non-IDR to IDR (NIDR to IDR) Per Protocols Section , "Interval Data Recorder (IDR) Installation and Use in Settlement," any ESI ID that exceeds 1000 kW or 1000 kVA in any two (2) billing months in the most recent twelve (12) month period or that receives service at 60 kV or above is required to have an interval data recorder (IDR) installed and utilized for settlement. ERCOT shall monitor the peak demand level of demand metered customers and post a monthly report to the Market Information System (MIS), with the appropriate Portal security rules, detailing which ESI IDs are required to have an IDR installed. The CR serving the ESI ID has thirty (30) days to verify the demand level and request that the TDSP install an IDR. If the CR does not agree that the IDR criteria have been met, the CR shall refer to Section 14.3, "General Dispute Resolution Guidelines," to address the issue. The TDSP has until the second regularly scheduled meter read date after receipt of the CR’s request to install the IDR. The TDSP shall update the Load Profile ID in the ERCOT systems effective on the meter install date, via the appropriate Texas SET transactions.

Profiling Working Group August 14, Default Profiles 1.PWG reviewed 7/30/03. 2.Requested ERCOT staff examine PWG suggestions if a new module can be added to the settlement software to allow ways of scaling the default profiles when both the IDR data is missing and/or a NIDR premise changes to IDR. 3.PWG and ERCOT staff to further discuss at the 8/19 PWG meeting.