9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.

Slides:



Advertisements
Similar presentations
MuTr Shielding & Grounding Preliminary 10/6/99 (G. Hart) Additions 1/4/01 (REM)
Advertisements

LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
NetSure™ RDB Series.
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Ecal Connection board and Motherboard design. Connection Board Motherboard.
1 March 2001 CMS HCAL RBX Production Readiness Review1 H C A L RBX SAFETY ISSUES RBX Production Readiness Review Safety Issues and Mitigations John E.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Control & Monitoring of DC-DC Buck Converters Satish Dhawan Yale University Power Distribution Working Group Meeting- Tuesday 24 February 2009 ATLAS Upgrade.
January 25, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Design of High Voltage System Kyungju Ma & Reno Collaboratiors
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
12/10/01 - Cecilia Gerber UIC Slide 1 Testing Card specifications l Will be used in the Run2b SASEQ-based test stands  needed. Build 75, two.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Current Status of RICH LVL-1 Trigger Module Takashi Matsumoto and Ken Oyama Presentation Outline Topics Geometry of Trigger Tile Required function of RICH.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Drift Chamber Review Jefferson Lab 6-8 March 2007 CLAS12 Drift Chamber Electronics R. Chris Cuevas Group Leader -- Fast Electronics Jefferson Lab Physics.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
LHCb Outer Tracker Electronics 40MHz Upgrade
NEW RMC Rack Multi Control.
LKr status R. Fantechi.
Calorimeter Mu2e Development electronics Front-end Review
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
cooling and supports of the forward endcap EMC
PMT cabling Gian Luca Raselli INFN Pavia
HPS Motherboard Electronic Design
Electronics for RPC Upscope
Front-end electronic system for large area photomultipliers readout
Pierluigi Paolucci - I.N.F.N. Naples
HV-LV-DCS Status NEWS DCS Endcap Integration
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Front End Electronics
RPC Electronics Overall system diagram Current status At detector
TOF & BB FEE Safety Review
Dr. Pierluigi Paolucci - INFN di Napoli
Presentation transcript:

9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat

9/18/2003Safety Review Aerogel Box. 80 segments. 160 channels. Concepts of readout electronics Preamp 8 preamp circuits are on one board. 20 boards are in one side. 5 transition cards. Integrate 8 multi coaxial cables in one board. Read out module G Link to DCM 5 AMU/ADC Modules have 320ch of inputs. Signal cable RG ~3.5 m Multi coaxial cable. UL m The electronics of the Aerogel detector is based on RICH’s. New Exactly same as RICH

9/18/2003Safety Review Cable and electronics PMT to preamp cards RG-174/U 160 x 2 sector Preamp cards to FEE UL x 2 sector One sector: 80 segments 160 channels 1.2m 2.0m 1.5m -3.5m FEE LV HV 7m To DCM From GTM Pre-amp These racks are properly monitored and connected to alarm system using the same way as other PHENIX racks.

9/18/2003Safety Review Cables in one sector Signal Cable from PMT to Pre-amp RG174/U x 160 Cable from Pre-amp to FEE UL2833 x 20 HV SL-v2YCEH (KERPEN) Each cable is connected to 2 PMTs. LED CTP-LAN5 cables x 20 LV RICH standard LV cable To Pre-amp 4+4 pairs of AWG16 twisted (+6.5V, -6.5V) Each pair drives 5 preamplifier cards Daisy chains of AWG24 wires To FEE Exactly same as RICH These numbers are should be doubled, since they are for one sector.

9/18/2003Safety Review Low voltage distribution and fusing for FEE LV distribution in the FEE crate These modules are properly fused using the same way as RICH. One LVHP module (High power module variant “S”) Max 40A per 2 channels Max 10A per channel -5V, 1 channel Max 10A per channel +8V, 1channel LV distribution for the FEE – power supply output : (2+1+1) pairs of AWG 10 wires – distributed to (20+8+8) pairs of AWG 16 wires distributors : PHOENIX UK6-FSI/C with 6 A fuses – AMP soft shell connectors on the crate side LV distribution in the FEE 10 AMU/ADC modules 4 +5 V 7 A) V 3 A) 2 readout modules 2 +5 V 3 A) 1 control module 5 +5 V 7 A)

9/18/2003Safety Review LV distribution and fusing for Preamp PHENIX standard LVLP modules will be used. One LVLP module (Low power module variant “Z2”) 8channels and 12.5A output per each channel 4 channels for +6.5V 4 channels for -6.5V of AWG14 cables (+6.5V, GND, -6.5V) One channel for 5 preamps distributed to 20 pairs of AWG 18 wires distributors : UK6-FSI/C with 2 A fuses pre-amplifier card 1 A for both +6.5V and -6.5V All parts on the card work well with 1A current.

9/18/2003Safety Review Preamp circuit and Heat Op-amp AD8009 slew rate: 5500uV/s Bandwidth: 1GHz Regulator MIC V, minimum drop 0.5V LM V, minimum drop 0.5V Operation drop voltage will be 1.5V (Input voltage : 6.5V) Heat The measured current is 0.12A. 0.12A x 6.5V x 2 (positive and negative) = 1.5W All preamplifier cards are located in the open air and this heat can be removed by the ambient air.

9/18/2003Safety Review Top view Side view 1250mm 227mm 111mm RG-174 x 160 UL2833 x 20 50mm Location of preamplifier preamplifier box Cooling issue 1.5 W x 20 = 30 W holes on box

9/18/2003Safety Review Temperature of Preamp Temperature of Op-amp surface reach 44 ℃ Air Temp + 20 ℃ Temperature of Box surface reach 32 ℃ Air Temp + 7 ℃ Measured point