Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.

Slides:



Advertisements
Similar presentations
Jiri Kvasnicka, EUDET meeting at DESY 1 Optical fibre calibration system Jiri Kvasnicka Outline Results from recent tests – LAB Test.
Advertisements

HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
LED calibration systems for CALICE hadron calorimeter June 11, 2011TIPP 2011, Chicago1.
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Ivo Polák SiPM needs short optical pulses
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak Institute of Physics (FZU), Prague June 11, 2011TIPP 2011, Kvasnicka1 The.
ECFA, JUN10, 2008Ivo Polak, IPASCR, Prague1 Electronics part of AHCAL calibration system ECFA meeting at Warszawa.
Sep 13, 2007CALICE Collaboration Meeting Prague 1 Long term test of LED pulsing  Long LED system stability measurement  Aging of part of optical system.
EUDET, OCT8 - 10, 2007 Ivo Polak, IoP Prague1 A fast LED driver prototype for HCAL calibration EUDET annual meeting at Ecole Polytechnique, Palaisau.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
DESY, DEC-2013Ivo Polák, FZU, Prague1 Activity on Adaptive power & Calibration at Prague Ivo Polák, on behalf of Prague’s group QMB1A update.
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
LED calibration systems for CALICE hadron calorimeter
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
CALICE ANL, MAR18, 2008 Ivo Polak, IPASCR, Prague1 A fast LED driver prototype for HCAL calibration CALICE meeting at ANL, USA.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
Uni Bergen:G. Eigen, E. van der Kraaij, J. Zalieckas FZU Prague: J. Cvach, J. Kvasnička, I. Polák Linear Collider Workshop, Tokyo 13/11/2013.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
HB LED Pulser Boards By Michael Miller The University of Iowa.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
oct - 6Ivo Polák, FZU, Prague1 Calibration system for SiPM and LED notched fibre distributing system Ivo Polák, on behalf prague’s group
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak, Institute of Physics, Prague June 11, 2011TIPP 2011, Kvasnicka1 The CALICE.
Gain stability and the LYSO beam radiation monitor measurements
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Comments on optical system for calibration Jan Smolik, Jaroslav Zalesak Institute of Physics, Prague.
PADME Front-End Electronics
LED notched fibre distributing system Calibration system for SiPM
JRA3 Institute of Physics ASCR Prague
LED notched fibre system short HBU0 party with QMB6
A fast LED driver prototype for HCAL calibration
CALICE meeting 2007 – Prague
LED notched fibre system at AHCAL Calibration system for SiPM
HCAL Modules -First Ideas
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
A fast LED driver prototype for HCAL calibration
Scintillator HCal Prototype
Presentation transcript:

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague2 Objective 6CH LED prototype Electronic part includes microcontroller on ARM architecture, easily integrated with HEB calib module. Optical distribution system with notched fiber seems to be functional

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague3 Multichannel LED driver 1 PCB with the communication module µC, power regulator, 4-6 channels of QRLed driver The communication module communicate with the PC via USB and CAN bus or I2C The communication module controls the amplitude, LED Enables, and monitore temperature, voltages LED pulse width is ~ 5 ns is fixed, the tunable amplitude in range up to MIPs is controlled by the V-calib signal QRLED 1 T-calib V-calib Power regulator QRLED 6 LED 1 LED 6 +12V FIBRESFIBRES µC AT91SA M7X256 Jiří Kvasnička, Ivo Polák, Milan Janata 3

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague4 A block diagram of the calibrator CAN/ i2C

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague5 Notched fiber (side emitting) version QR driver + LED 24*3cm² area needed at the main PCB 24 fibers

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague6 Test setup for notched and side-emitting fibers The fiber lay over the tile. QRLED 1 Optical taps –notches, total 71 2m Tile + SiPM Moved by step 3cm 2ns pulse width DAQ+preamp

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague7 Simplified optical system for calibration Idea: use one fibre for one row of tiles Problems: uniformity of distributed light enough intensity of distributed light concentration of LED light into one fibre Two fibres: Side-emitting (FiberTech SLS600 series) - exponential fall of intensity - possibilities to buy at market Notched fibre (manually produced by Safibra comp.)‏ - better uniformity of distributed light - need to mechanize production - R&D

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague8 Light distribution, measured by moving scintillator with SiPM along the fiber Side-emitting fibre, light declines 4-times along 2m Notched fibre, a light on taps declines by 1.5 along 2m UV-LED 400nm, 2.5ns pulsewidth

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague9 Notched fiber Hand-cut prototypes tested with QRLed driver at maximum amplitude Fibers have 71 notches at 3cm pitch - length 2.5m, diameter 1mm

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague10 Notched fiber spread of the light at taps can be improved by process of automation – needs to be developed decreasing of systematic fall of the light intensity along fiber will be discussed with the manufacturer the light output seems to be at maximum level, the input light must be increased (pulse-width 2  5ns) to reach 100MIPs

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague11 Conclusion on optical part We suggest to use notched fibre Mechanisation needs to be developed Decrease of attenuation tap factor should be discussed Will the fibre be positioned in tails or in absorber?

main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague12 Conclusion Communication module is ready, the final design of PCB for the digital part starts in July Optimization of the QRLed driver (tests of the linearity, adjustment for another LED type) – July Design of PCB for the complete calibration 6CH prototype will be done in August PCB production – September, tests – October In parallel – an innovation of the optical systém System integration to “detector prototype” starts and will continue Time schedule is tough but no principal problems encountered