Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

ATLAS UPGRADE BARREL END SERVICES – Work on trying to reduce mass of cooling in R/PHI TJ Fraser UCL Assuming cooling pipes have to be directed.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
A.Nichols CLRC1 SCT HEX PRR ( ) Layout & Installation of Barrel off-detector HEX circuits From barrel cooling loop to PPB1 l Barrel Hex is a plain.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Comparison of cooling services at barrel end Description SCT Barrel Upgrade ID barrel one end one end Total number of staves/rows 176 Staves/rows serviced.
CO 2 return pressure drop budget and pipes from PP2 to tracker Georg Viehhauser.
Cooling connections in the service gap Richard French The University of Sheffield.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report September 28, 2000 N. Hartman, E. Anderssen, M. Gilchriese, T. Weber,
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool June 2012 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
1 ATLAS Upgrade WP4 Face to Face meeting at Edinburgh - 11 th Jan 2011 WP4 task 2: Cooling activities Richard French – The University of Sheffield.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
ATLAS Pixel Detector Cooling Services Joining Techniques: Progress Report December 13, 2000 N. Hartman, E. Anderssen, M. Gilchriese, F. Goosen, T. Johnson,
ATLAS Tracker Upgrade - Services at Barrel Ends: Scenario where services are routed through existing services channels on cryostat shown on the next 3.
Cooling loops for prototype staves Update on cooling pipes progress Confirmation of design of loop Discussion on design developments of loops for future.
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
1 QMUL Face to Face Meeting 2/2/2012 Richard French, Paul Kemp-Russell, Hector Marin-Reyes (Sheffield) John Matheson, Martin Gibson, Ian Wilmut (RAL) Ian.
Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT.
1 Overview Stainless Steel to Titanium joining (temp connection) Copper to Titanium (pressure drop measurements) ATLAS Upgrade dissimilar metal joining.
Paul Barclay SCT COOLING PRR DESIGN PERAMETERS a)ACTIVE LENGTH TO MATCH Q.M.U.L PROTOTYPE b)GENERAL LAYOUT OF HEAT EXCHANGERS.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
HEX Procurement Parts List Contains: qualification parts, Barrel & EndCap HEX Web site also contains a.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
WP4 Face to Face #6, Oxford 14 th July 2011 Welding summary Richard French – The University of Sheffield.
15th January 2014 WP4 Meeting Oxford1 EoS PCB Mike Dawson University of Oxford.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort December, 2001 N. Hartman,
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
1 ATLAS Upgrade WP4 Face to Face meeting Sheffield 25 th August 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
1 ATLAS Upgrade WP4 Face to Face meeting Oxford 14 th May 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John.
EC: 7 DISK concept Preliminary considerations
ATLAS Internal ID Service Integration
Local cooling LAPP – Annecy /IN2P3
Service channels between Tracker and PP1
End-cap Mechanics FDR Overview of the Project
Future tube procurement Richard French
Cooling loops for prototype Staves
Mechanics: (Tim).
Services Layout – Update
Detector Technology Group
ATL-IC-ES new version available - approval starts
ATLAS UK-Upgrade WP7 LMT Automated Manipulation Testing
Presentation transcript:

Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community

Location of cooling components and pipe destinations in ATLAS Services routing of current ID from PP2 How much of the wheel needs reinventing? Can we tweak an existing design? For reference – is the positional terminology the same? Existing ATLAS layout and terminology to jog memory

Electrical break on barrel was done with Beryllia. Cooling pipe was copper-nickel. Upgrade uses Titanium as a baseline for Stave core. CuNi was used for on detector pipework Do we have a baseline (CP2 Ti)? Stainless steel (austenitic) was used for off detector What is our baseline? 316L? C106 soft annealed copper was also used in small amounts for manufacture of Heat Exchangers (HEX), S bends and other short lengths of tube both on and off detector Not ideal. Unfilled PEEK tube (specially made 12mm ID 13mm OD) was used for gas ‘guidance’ of N2 dry gas around the detector. Not thought about yet for N2 delivery. Existing materials used in ATLAS SCT cooling system Items to consider before addressing design of electrical break connector GALVANIC STABILITY OF THE SYSTEM

Endcap disks have ground referencing tapes that bond together the complex cooling tube paths. SCT Endcap Grounding and Shielding Scheme

Life gets much simpler with the current proposal from Ned. Location of electrical break does not matter so either at PPB0 Or PPB???? 1ish. Decided at RAL meeting to concentrate at end of Stave option. Mass implication? Materials choice CRITICAL JOINT Encapsulate connector at end of Stave OD??? Diameter transition

Quick peek at IBL progress 3 connector types Brazed union De-mountable connector with swaged tube Electrical break (brazed ceramic) OD crucial to encapsulation in Stave. Conductivity with carbon fibre skins

IBL Electrical Break and Connectors 2.5 to 1.7 OD 1.7 to 2.2 OD 1.7 and 2.2 OD

316L tube – ceramic – titanium tube isolator Diameter transition of tube OD can be reduced Length ok Can be encapsulated Need to better understand purpose of covers. Attempt to make simplified, similar item using brazed ceramic Material type? Reduce size Ti to Ti joining preferred as simpler OD/ID v working pressure Volume / Quantity required to fit with new programme? Services mock up? Introduce to prototype staves