Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Project Scope Management
The Gamma-Ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE Anticoincidence Detector for GLAST Alexander Moiseev,
Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT Project IA Workshop, July 14, 2005 ACD subsystem Alex Moiseev 1 GLAST Large Area Telescope: IA Workshop July 14, 2005 AntiCoincidence Detector.
Alex Moiseev NASA/GSFC 12/16/2005 Some ACD Calibration issues I.ACD mip peak monitoring 1. ACD mip peak monitoring requires the measurements to be done.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
Sep/26/05Trigger test plan Trigger ACD/LAT Test Plan Eric Grove, Martin Kocian, Su Dong.
Dynamic Traffic Light Timing Tony Faillaci John Gilroy Ben Hughes Justin Porter Zach Zientek.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
USUSat III - TOROID TOmographic Remote Observer of Ionospheric Disturbances Preliminary Design Review Preparation.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
Development programs and model philosophy1 Preliminary design review Prototype program Critical design review Qualification program Qualification review.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
1 DORS PROPRIETARY–SENSITIVE INFORMATION Welcome to DORS Many high volume restaurants during peak periods can experience a significant increase in inaccurate.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
Reliability Assessments Scope Per paragraph of the MAR and PAIP “ When necessary/prudent or when agreed upon with the GSFC Project Office, Glast.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Judges Score Card Overview Mark Turner NASA Ames Research Center.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Overview.
Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
I. Preliminary Design Review 1. Product specification 2. Project scope 3. Technical approach/solution to the Design Problem 4. Working Schedule (Gantt.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 4 Tile Detector Assemblies 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) WBS
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
1 Suggestions to 2006 LAT prototype beam test plan Alex Moiseev, NASA/GSFC.
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
Status Report Beam Working Group 31 January 2007 Presented by L.Gatignon  Revised beam design  Requests to AB department for 2007.
Information Technology Project Management, Seventh Edition.
GLAST LAT ProjectPMT Procurement Review May 24, 2002 AntiCoincidence Detector Design Overview 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD)
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 1 GLAST Large Area Telescope: AntiCoincidence Detector.
GLAST Large Area Telescope:
I&T&C Organization Chart
GLAST Large Area Telescope:
Gamma-ray Large Area Space Telescope ACD Final Performance
Gamma-ray Large Area Space Telescope
Software Requirements
GLAST Large Area Telescope:
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope:
GLAST Large Area Telescope
Peer Review Agenda (Suggested).
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
1. Introduction and Overview
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
Presentation transcript:

Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run charts http://lhea-glast.gsfc.nasa.gov/acd/cdr/index.html The following slides are examples for each Check List category presented in the ACD charts

Closure of Action Items Identified action items from PDR and DPDR Show status and closure of NASA GSFC action items Identify the action requested AI# 2. Perform light yield tests and muon detection efficiency measurement of the final optical system (scintillator tiles; and fiber ribbons, connector, clear fibers, and photomultiplier tubes). Complete – results are similar to those shown in January: with two phototubes, 0.9997 efficiency is met; with one phototube, efficiency is ~ 0.999 Light output of Fermilab tiles is good. Light losses in the optical connector and clear fibers were higher than expected. Design improvements were made to compensate for these losses. LAT-TD-00843-D1, Design Qualification Tests for ACD TDA and Phototubes Show results

Design Specification Science/technical objectives and technical budgets Requirements & specifications metrics and flow down All TBX (TBD, TBA, TBS, etc…) should be removed or addressed Drawing metrics Number and percent complete of major assemblies and critical component drawings Plans for completing the remaining drawings Identify key requirements

Show break down of allocation within subsystem Key Technical Budgets Identified technical budgets, it’s allocation from LAT System, changes since PDR Show allocation flow down within the subsystem Technical Resources ACD Mass Allocation 235 kg ACD detailed estimate 270 kg (15% over PDR allocation. LAT has been notified, CR is being submitted) ACD Power Allocation 31 W (conditioned) ACD detailed estimate 14 W max Thermal Interface (max dissipation across ASD-LAT interface) Dissipation Allocation 16 W Dissipation Estimate <14 W Show break down of allocation within subsystem

Interface Control Document ICD and IDD are completed and signed Identify major trades to accommodate design Remaining open issues should have closure plan 24 identical robust circular connectors (38999, series 2) 2 circular housekeeping connectors (38999, series 2) Parts, pin outs, signal def, grounding all defined in ICD Show interfaces DATA Products Channel specific charged particle VETOs VETO hit maps PHAs Diagnostics Housekeeping (thermistor output, voltage monitor output, direct to AEM)

Analysis/Modeling/EM Reports Identify analysis and modeling performed since PDR What are the impacts due to spacecraft/bus interface Highlight impact to analysis due to design change Highlight impact to design due to modeling change Provide example of EM testing Identify objective and results Example from ACD Subject of the test - Fermilab made TDA prototypes (T1 and T2) equipped with clear fiber extensions and fiber-to-fiber connectors (made by GSFC)  M1 S1 S2 T1 T2 S3 M2 Efficiency measurement setup: M1, M2 - hardware trigger scintillators S1, S2, S3 - software trigger scintillators T1, and T2 - tested TDA’s Up to 50% of the light created in the tile, is being lost during transportation to the PMT

Qualification/Environmental Test Plan Identify qualification and environmental test to be performed in accordance to LAT Verification and Test Plan Show Flow Test & Verification Matrix Traceability ACD-LAT ICD Requirements and Verification Database Links between Requirements ACD Level III and IV Requirements Database ACD Test Databases ACD Allocation Tables

Identify status of qualification test Parts & FMEA/WCA Parts and qualification status FMEA/WCA/Fracture Control Example - Results of Qualification PMT’s acceptance test Identify status of qualification test