1 Hospital Building and Campus Piping. 2 Hospital Building Occupancy – office and patient areas Patient areas: 24 hours per day Office areas: 8 am – 5.

Slides:



Advertisements
Similar presentations
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Advertisements

Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
SAMPLE SLIDES OF THE 1-DAY SEMINAR FOR PUMP USERS
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Chilled Water Piping Systems (VPF Focus)
Booster System Basics: Constant Speed Systems
Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
Engineer Presentation
Energy Efficient Fluid Flow
Energy Efficient Fluid Flow. Fluid Flow System Fundamentals W motor = W fluid / (Eff motor x Eff drive x Eff pump )
© Belimo University 2011, All Rights Reserved
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
CHW Optimization Case Studies
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Piping Systems.
Hydronic Mechanical Controls
Opening Slide Centrifugal Pumps Systems Characteristics.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Chilled Water Systems Total Cost of Ownership
1 Multi-use Facility. 2 Occupancy – 140 persons Building Characteristics Single story 20,000 square feet (250’ x 80’) Standard construction.
Water piping design.
7154 VFD Presentation #4 May 2002 Paul Weingartner.
1 MAGNA3 RANGE RELIABILITY INTELLIGENCE EFFICIENCY.
Grundfos FLOW THINKING Air conditioning the Grundfos Way.
Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.
Air conditioning – Refreshes your life EWTP MBY Applied Systems Sales1 EWTP-MBYNN Air-cooled Heat Recovery.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Pumps and Lift Stations. Background Fluid Moving Equipment Fluids are moved through flow systems using pumps, fans, blowers, and compressors. Such devices.
Lecture Objectives: Finish with thermal storage systems Learn about plumbing systems.
1 Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
SAMPLE SLIDES OF THE 2-DAY SEMINAR FOR ENGINEERS As you will notice there are few words on these slides, your trainer will provide you with his experience.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Sizing Variable Flow Piping – An Opportunity for Reducing Energy
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
1 Pumping System Fundamentals 2014 Jeff Turner Systecore Inc.
Learning Outcomes Upon completion of this training one should be able to: Identify the influence of codes on pump & hydronic design Understand HVAC loads.
1 Variable Speed Pumping in Hydronic Systems Why use VFD or VSD Pumps? What are they and how do they work Back to the basics – reading constant speed curves.
Introduction to Energy Management
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
Energy Saving Measures - 1
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Lecture Objectives: Answer question related to Project 1 Finish with thermal storage systems Learn about plumbing systems.
1 ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 6 : PUMPS.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Lecture Objectives: Plumbing Pumps Hydronic distribution systems
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 10 : CONTROL VALVES IN CLOSED LOOP SYSTEMS.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
CENTRIFUGAL PUMPS:- DESIGN & PERFORMANCE Ir. N. Jayaseelan 2012.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
CIBSE HCNW 28 August 2014 Modular boilers. Traditional or low-tech replacement boiler installation; Multiple boilers eg 2 no 66% of load for security.
WELCOME. Glycol Refrigeration A most basic definition of refrigeration is taking heat from someplace we don’t want it and moving it to someplace where.
System One Pumps S1-200 Centrifugal Hydraulics
WSHP Systems 1.
Lecture Objectives: Learn about thermal storage systems
Sustainability Best Practices
The Data Center Challenge
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Variable Frequency Drive Savings Calculator Tools
Thermal Energy Storage
Energy Efficiency in District Coiling System
ME444 ENGINEERING PIPING SYSTEM DESIGN
Lecture Objectives: Learn about Pumps and System Curves.
System Curve Example Design Condition 20 ft.w.c. required each way to deliver design flow to and from the headers at the loads Distribution Pump Bell.
Presented by Mike Zacharias
Pumping System Fundamentals
Presentation transcript:

1 Hospital Building and Campus Piping

2 Hospital Building Occupancy – office and patient areas Patient areas: 24 hours per day Office areas: 8 am – 5 pm, Monday - Friday Building Characteristics: Four story with basement 140,000 square feet per floor Standard construction

3 Hospital – Stand alone operation Larger building Larger pumps Similar applications

4 Medical Complex with Central Plant All buildings served from a single heating and cooling source located in a central plant Hot and chilled water are distributed to each building via piping loops

5 Medical Complex with Central Plant Similarities All previous examples can exist in the same or larger scale Differences Pumps may be larger Distribution piping can be different Location of central plant is critical Multiple central plants may be tied together

6 Campus Piping Systems

7 Types of Piping Systems Closed Loop Systems Chilled Water Systems Hot Water Systems Open Loop System Condenser Water Systems Domestic Hot Water Recirculation Domestic Pressure Boosting (future session)

8 Two Pipe Direct Return C H I L L E R C H I L L E R C H I L L E R Return Supply Pump Controller Secondary Pumps Primary Pumps Expansion Tank Air Separator Common Pipe

9 Two Pipe Direct Return Common applications Basis of design for most CHW systems. Small, medium, or large size buildings Low or high rise Single or multiple buildings Single supply temperature

10 Two Pipe Direct Return Piping Tips Common pipe design Tank Point of No Pressure Change (PNPC) Warmest water Air control and relief 2-way valves Size Location

11 Two Pipe Direct Return Advantages Simplicity First Cost Efficient Disadvantages Over-pressurization Balancing Head requirement Thermally linked

12 Primary-Secondary-Tertiary C H I L L E R C H I L L E R Zone A Zone B Zone C Optional Variable Speed Pump ∆P Sensor Modulating Control Valves Secondary Pump C H I L L E R Primary Pumps Tertiary Pumps Common Pipe Common Pipe

13 Primary-Secondary-Tertiary Common applications Multi-building campuses Campuses with large diversity Campuses with buildings of varying heights Campuses with long piping runs Campuses with multiple production plants Campuses with elevation changes

14 Tertiary Loop Piping T3 T1 Load MV Load MV Common Pipe T2 Tertiary Zone Pumps Tertiary Bridge Secondary Pump(s) Secondary Chilled Water Return Small Bypass Maintains Accurate Temperature Reading Magna3 MV

15 Primary-Secondary-Tertiary w/Plate HX Expansion Tank Air Separator Expansion Tank Air Separator C H I L L E R C H I L L E R Optional VS Pump ∆P Sensor Modulating Control Valves Secondary Pump C H I L L E R Primary Pumps Magna3 Common Pipe Plate HX Tertiary Pumps

16 Tertiary Loop Piping w/ Plate HX Small Bypass Maintains Accurate Temperature Reading T3 T1 Load MV Load MV T2 Tertiary Zone Pumps Tertiary Bridge Secondary Pump(s) Secondary Chilled Water Return Small Bypass Maintains Accurate Temperature Reading Magna3 T3 T1 Load MV Load MV Load MV T2 Tertiary Zone Pump Tertiary Bridge Secondary Pump(s) Secondary Chilled Water Return Magna3 MV Plate HX

17 Primary-Secondary-Tertiary Piping Tips When HX are used, additional tanks and air separator devices must be added to tertiary Controls for secondary and tertiary systems are independent

18 Primary-Secondary-Tertiary Advantages Hydraulic isolation Thermal isolation Horsepower reduction Operational cost savings System performance optimization Disadvantages Additional piping Additional control valves First cost Over-pressurization of near zones unless plate hx is used More pumps

19 Open Piped Systems Chiller Piping Condenser water piping Condenser water with economizer.

20 Condenser Water Piping Return Supply Tower Evaporator Condenser Primary Pump(s) Secondary Pump(s) Condenser Pump(s) Chiller Sediment Separator Expansion Tank And Air Separator

21 Condenser Water w/ Economizer Return Supply Tower Evaporator Condenser Primary Pump(s) Secondary Pump(s) Condenser Pump(s) Head Pressure Control Valve Heat Exchanger Loads Sediment Separator Expansion Tank And Air Separator

22 Condenser Water Piping Condenser Water Tips Installation Keep pump suction flooded Watch NPSH Operation Air pockets End of curve Maintenance Strainers Air vents

23 Best Practice Design

24 Best Practice Design Why Constant speed pump Variable speed pump Optimize Pump Impeller

Best Practice Design Why ‒ Equipment over-sizing ‒ Cost penalty ‒ Mandate Optimize Pump Impeller

26 Best Practice Design Constant speed pump Trim the impeller. Utilize the affinity laws. Follow the system curve. Save operating cost. First costs.

27 Variable speed pump Impeller optimization Follows affinity laws Does not correct for poor engineering Over-sized pumps minimize turndown ratio Over-sized pumps and motors operate at lower efficiencies No added first costs Best Practice Design

28 Primary Piping for Hot Water Systems Pump out of a boiler Keep the boiler at the lowest possible pressure Remember NPSH! Boiler 2 P1P2 Boiler 1 Best Practice Design

29 Primary Piping for Chilled Water Systems Pump into a chiller Largest pressure drops after the pump Chiller Primary Pumps Chiller Best Practice Design

30 System Bypass Options Return Supply Pump Controller Secondary CS Pump(s) Common Pipe Chiller 2Chiller 1Chiller 3 Best Practice Design

31 System Bypass Options Locate bypass near end of system Locate bypass near end of major loops Selectively leave 3-way valves Bypass with pressure activated control Variable speed considerations Best Practice Design

32 Effect at minimum VFD speed Below 30% speed: CS, but still VV % Flow Head 100 % Speed 30% Speed Best Practice Design

GPM Pump 1 Variable Speed: 100 Ft Pump 2 Constant Speed: Ft Wrong! Mixing CS and VS Pumps Best Practice Design

34 Sensor Location Return Supply Pump Controller VFDs ∆P∆P Sensor Chiller 3 Chiller 2Chiller 1 Primary Pumps Secondary Pumps Best Practice Design

35 Sensor Location The Traditional Way – Hydronically, the farthest load – Typically the largest, farthest load – Maximize the variable head loss – Multiple sensors are a benefit Best Practice Design

36 Optimized solution not only for the pumps, but for the total system conditions Uncontrolled (constant volume) curve Constant pressure Proportional pressure Temperature control FLOW ADAPT AUTO ADAPT Best Practice Design

37 Best Practice Design Q 100%25% H 1. Uncontrolled 2. Constant pressure 3. Proportional pressure (calculated) 4. Proportional pressure (measured) 5. Temperature control Flow in % Effect in % Get Additional Energy Savings

38 Best Practice Design - Demand More Total Efficiency vs. Control Modes

39 Best Practice Design - Demand More Comparison

Flow Limit FLOW LIMIT Potential saving compared to an unintelligent pump Potential saving compared with proportional pressure mode Duty point Additional saving with FLOW LIMIT Performance curve Intelligent Control – FLOW ADAPT /FLOW LIMIT Best Practice Design - Demand More 40

41 Best Practice Design - Demand More

42 UPDATE Q 100%25% H 1.Uncontrolled 2.Constant pressure 3.Proportional pressure (calculated) 4.Proportional pressure (measured) 5.Temperature control Flow in % Effect in % Best Practice Design – Demand More Intelligent Control - Overview

43 Best Practice Design - Demand More Drive Motor and Pump Effeciency

44 100% 80% 70% 60% 50% 25% 90% HRPM 0 Max. curve Control curve Pressure reduction DP1DP3DP4DP2 Control mode Best Practice Design – Demand More Intelligent Control - Pressure Control

45 100% 80% 70% 60% 50% 25% 90% HRPM 0 Max. curve Control curve Pressure reduction DP1DP3DP4DP2 Control mode Best Practice Design - Demand More Intelligent Control: Calculated Pressure Control

46 100% 80% 70% 60% 50% 25% 90% HRPM 0 Max. curve Control curve Pressure reduction DP1DP3DP4DP2 Control mode Best Practice Design - Demand More Intelligent Control: Measured Pressure Control

47 100% 80% 70% 60% 50% 25% 90% HRPM 0 Max. curve Control curve Pressure reduction DP1DP3DP4DP2 Control mode Best Practice Design - Demand More Intelligent Control: Temperature Control

48 Best Practice Design

49 Affinity Laws Capacity varies to the ratio of the diameter change Head varies to the ratio of the square of the diameter change Brake horsepower varies to the ratio of the cube of the diameter change Best Practice Design

50 Affinity Laws Best Practice Design

51 What Impacts the System Head? Actual component pressure drops Actual piping loses Present vs. future loads Safety Factors Heating vs. cooling flow Best Practice Design

52 What Happened if......you read a flow rate of 1425 gpm instead of the design 1150 gpm? Best Practice Design

” Impeller Curve Best Practice Design System Curve #1 System Curve #2

54 Throttle Valve Best Practice Design System Curve #1 System Curve #2

55 Best Practice Design HP Penalty? HP = Flow x Head x Specific Gravity/3960 x Pump Eff. Throttled Head = Design Head – Measured Head Throttled Head = 138 – 120 = 18 feet Throttled HP = 1150 x 18 x 1/3960 x 0.86 Wasted HP across balance valve? HP = 6.08

56 Correcting pump over-sizing: Close valve at pump Balance system Trim the impeller VFD Best Practice Design

57 10”inch Impeller Curve in System Curve #1 System Curve #2 Best Practice Design

58 Best Practice Design True HP Penalty HP = Flow x Head x Specific Gravity/3960 x Pump Eff. Head at actual point of operation = 80 feet Head savings = 138 – 80 = 58 feet, not 18 feet Wasted HP with untrimmed impeller… HP = 1150 x 58 x 1/3960 x 0.82 HP = 20.54! Trim impeller from 12.10” to 10.0”

59 Operating Cost Pump Motor Best Practice Design

60 Operating Cost: “Standard Efficiency” Motor = 90.9 BHP = (1150 x 138 x 1.0) / 3960 x 0.86 = kW = (34.47 x ) / = AOC = x 8760 x $0.10/kWh = $24,768 Best Practice Design

61 Operating Cost: “High Efficiency” Motor = 93.4 BHP = (1150 x 138 x 1.0) / 3960 x 0.86 = kW = (34.47 x ) / = AOC = x 8760 x $0.10/kWh = $24,108 Best Practice Design

62 Operating Cost Comparison: Motor change out $0.10/kWh Standard Efficiency$24,768 High Efficiency$24,108 Annual Savings$ 660 Best Practice Design

63 Trim the Impeller to 10”: Flow = 1150 gpm Head = 80 ft Pump efficiency = 0.82 Standard efficiency motor = 87.9 High efficiency motor = 90.3 Best Practice Design

64 Operating Cost: “Standard Efficiency” Motor = 87.9 BHP = (1150 x 80 x 1.0) / 3960 x 0.82 = kW = (28.33 x ) / = AOC = x 8760 x $0.10/kWh = $21,055 Best Practice Design

65 Operating Cost: “High Efficiency” Motor = 90.3 BHP = (1150 x 80 x 1.0) / 3960 x 0.82 = kW = (28.33 x ) / = AOC = x 8760 x $0.10/kWh = $20,494 Best Practice Design

66 Std EffHi Ft $24,768 $24, ft $21,055 $20,494 $561 Difference $ 3,713 $ 3,614 $4,274 Operating Cost Comparison: High Eff. Motor + Trimming Impeller Best Practice Design

67 Best Practice Design Impeller Trimming True cost to trim impeller Remove and replace impeller Replace seals Replace bearings Downtime Calculate payback