Resolving Common Construction Disputes By: Bob Bourg Claims and Disputes Manager Washington State Department of Enterprise Services Engineering and Architectural.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project.
Section 12 Under Construction. Your role as the owner What to expect at the preconstruction meeting Dos and Dont during construction How to handle change.
Wickwire Gavin, P.C. Minnesota Department of Transportation November 29, 2000 Michael C. Loulakis, Esq. Design-Build: Understanding the Basics.
Construction Contracting
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
1. Among the most important advisors to a construction firm are: –Professional surety bond producer –Knowledgeable construction/surety attorney –Construction-oriented.
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Federal Acquisition Service U.S. General Services Administration June 2009 GSA Multiple Award Schedule Contractor Teaming Arrangements Contractor Teaming.
Managing and Negotiating Change Orders Presented by Daniel Williams, P.E. May 1, 2008.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
 Architect/Engineer Selection Process  Contractor Selection Process  Project Management 2008 Legislative Audit Report Procurement Best Practices Text:
Marcy Mealy Procurement Specialist CDBG Program
Designer contractor engineers Builders Owner.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Construction Engineering 221 Drawings and Specifications.
Delay Claims from the Owner and Contractor’s Perspectives
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Six Cert IV - M. S. Martin March 2012.
Construction Engineering 221 Cost Estimating and Bidding.
DESIGN-BUILD CM Perspective Owner’s Expectation – DB is Master Builder Stakeholder’s Expectation – DB must satisfy their requirements DB’s Expectation.
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Enterprise Architecture 2013 ITAG Data Governance – Metadata Repository EAAF - Update.
Section 2 Capital Project Life Cycle. PROJECT PHASES Project development تطوير المشروع Turn Over التسليم والضمان Detailed design التصميم التفصيلي Preliminary.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
ARRA Project Oversight 2010 WTBA Contractor/Engineer Conference 1/21/2010.
Job Order Contracting Process Bob Bourg, Claims & Disputes Manager Marlene Anglemyer, Cost Engineer.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Specification & Quantities Estimating
Construction Process Public- statutory control of process Private- market control of process Traditional system: Owner Arch/EngrContractor Non-contractual.
King Fahd University of Petroleum & Minerals
>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT 1 © Unitec New Zealand PROFESSIONALISM AND INTERPERSONAL CONFLICT.
Architect Eionde Driver.  Meet with clients to determine objectives and requirements for structures  Estimate the amount of required materials, equipment,
Laura J. Weber Solid Waste Project Manager St. Regis Mohawk Tribe ITEP Tribal Transfer Station Course.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
CONSTRUCTION ADMINISTRATION Claims and Disputes Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
Contractor / Engineer Conference 2010 Dispute Resolution Process Dispute Resolution Process.
Unit 1 Conflict : Disputes & Arbitration. Objectives List and group potential causes of complaints or disputes during construction Describe the actions.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Resource Portfolio Management TASSCC Annual Conference August 11, 2008 Department of Aging and Disability Services Information Technology.
Agency Construction Management :CM NOT AT-RISK
Gaining a Competitive Advantage Cindy Alligood, Pam Truitt, Mary Alice Applegate  December 3, 2014.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Construction of a Transfer Station
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
Measurement and Payment
Collaboration in Contracting Teresa Magnus Vulcan Insulation Co.
BCN 4708 Fall 2008 Chapter 1 The Construction Industry.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
The Value of a Knowledgeable Construction/Surety Attorney
CONTRACT ADMINISTRATION
Parties to the Contract: The Client (NAME): The Contractor
Engineering & Architectural Services
Manajemen Konstruksi Bidding & Award
Chapter 7 Conflicts.
Process for Organising Software Development Activities
Supervisor: Eng. Mohammad abu neama
Directed Change Constructive Change
Presentation transcript:

Resolving Common Construction Disputes By: Bob Bourg Claims and Disputes Manager Washington State Department of Enterprise Services Engineering and Architectural Services

Project Team E&AS Contractor Design Firm Client

A dispute occurs when the parties to the contract are in disagreement over a requirement of the contract. Disputes are not claims and they happen all the time! Common drivers of a dispute are: Drawings: –Missing information –Conflicting –Priorities of drawing standards –Anticipation of estimating and takeoff standards –Constructability Specifications: –Adherence to specification standards (customization) –Compatibility with related specification sections –Reliance on global statements –Missing information –Order of precedence (specifications and drawings) –Ambiguous or conflicting elements Common Disputes Defined

Cost of Change: –Cost standards vs. estimated costs –Adequate quantification of work: Breakdown of item quantities Labor amounts Hourly labor rates Productivity Material invoices Time and materials (cost plus) Changes to the schedule (added days): Cost and No Cost Attitudes and approaches to the issue Common Disputes Defined (cont.)

General Contractor submission and review: –Requests for Information (RFI’s) –Change Orders (CO’s) –Subcontractor discussion Architect review: –Requests for Information (RFI’s) –Change Orders (CO’s) –Sub-consultant discussion Owner review and oversight Architect and Owner: Review Expectations

Contractor and Architect/Engineer must fulfill their quantitative and objective duties to maintain focus on the real issue and promote clear understanding of their respective positions and differences. The Owner must focus on what is disputed in order to facilitate resolution. Agency and Client become the “Equalizers” earlier rather than later. Dispute Resolution

Bob Bourg Claims and Disputes Manager (360) Questions?