Structure and Integration of RTF Guidelines: Savings, Lifetimes and Cost/Benefit July 17, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.

Slides:



Advertisements
Similar presentations
Deemed Measure Reviews: 1.) LED Holiday Lights, 2.) Multifamily Low-Rise New Construction, and 3.) Room Air Conditioners March 1 st, 2011 Regional Technical.
Advertisements

Project Proposal: Multifamily Weatherization UES Scoping Study Regional Technical Forum June 1 st, 2011.
Direction on Guidelines Savings Definition Path Results of straw vote and proposed decisions for elements of the savings definition Regional Technical.
Commercial Clothes Washer UES Measure Update Regional Technical Forum February 19, 2014.
D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
Residential LED UES Measure Update Regional Technical Forum August 20, 2013.
Port St. Lucie City of Crosstown Parkway Extension Project Development and Environment (PD&E) Study & Environmental Impact Statement (EIS) Substantial.
Variable Frequency Drives (VFDs) for Potato/Onion Shed Fans UES Measure Update Regional Technical Forum April 23, 2014.
Fan VFD Calculator Development Staff Request for Authorization of Funding from the Regional Technical Forum 28 June 2011.
Proposed 2013 RTF Work Plan October 15, Work Plan Development Process RTF 2014 work plan ProcessDate Develop draft work plan and present to Operations.
Guidelines for RTF Measure Economics Estimation Methods (formerly Cost and Non-Energy Benefits Guidelines) Progress Update to the Regional Technical Forum.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Staff Updates Regional Technical Forum September 17, 2013.
1 Draft NYISO 2003 Budget Report BS&P Report to Management Committee October 16, 2002.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
RTF Staff, Subcommittee and Work Updates October 23, 2012.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Integral LED Bulbs Part II presented to the Regional Technical Forum John Wilson,
GUIDELINES FOR RTF MEASURE LIFE Briefing to the Regional Technical Forum May 15, 2012 Lisa A. Skumatz, Ph.D. Skumatz Economic Research Associates Mark.
Delivery Verification Jennifer Anziano Regional Technical Forum March 17, 2015.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
DRAFT 2015 RTF Work Plan August 12, Work Plan Development Process RTF 2015 work plan ProcessDate Develop draft work plan and present to Operations.
Proposed 2014 RTF Work Plan and 3-year Look Back October 21,
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Standard Information Workbook (SIW) Update Proposal Regional Technical Forum May 13, 2014.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Oregon ENERGY STAR Homes Measure Update Adam Hadley Regional Technical Forum March 17, 2015.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
BAXTER COMPREHENSIVE PLAN Joint Commission/City Council Meeting August 25, 2014.
SEEM Calibration: Phase-2 Adjustments for Failed VBDD Fits Regional Technical Forum August 12, 2014.
RTF Management Update Jennifer Anziano Regional Technical Forum May 12, 2015.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
UES Measure Updates: Refrigerator and Freezer Recycling Adam Hadley Regional Technical Forum June 16, 2015.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
Proposed 2013 RTF Work Plan October 23, compared to 2012.
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Staff Updates Regional Technical Forum March 20, 2013.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
RTF Staff, Subcommittee and Work Updates October 4, 2011.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Residential Weatherization and Ventilation Subcommittee: Infiltration Impact Research Plan Presentation to the Regional Technical Forum December 13, 2011.
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
FY14-FY22 IT Roadmap – Update Budget and Investment Committee October 8, 2013.
RTF Staff, Subcommittee and Work Updates January 23, 2013.
Proposed 2016 Work Plan Jennifer Anziano August 27, 2015.
RTF Staff, Subcommittee and Work Updates June 19, 2012.
RTF Administrative Measure Decisions November 14, 2012.
Commercial Clothes Washer UES Measure Update Regional Technical Forum April 16, 2013.
RTF Management Update Jennifer Anziano Regional Technical Forum August 18, 2015.
UES Measure: Commercial – Traffic Signal LED’s Commercial – Traffic Signal LED’s Proposal to Change Status from “Under Review” to “Active” Regional Technical.
Residential Showerheads UES Update Ryan Firestone Regional Technical Forum October 20, 2015.
RTF Delivery Verification Guidance Batch 2 Jennifer Anziano Regional Technical Forum September 22, 2015.
Residential Refrigerator UES Measure Update Regional Technical Forum April 16, 2013.
RTF Management Update Jennifer Anziano Regional Technical Forum July 21, 2015.
Proposed Edits to the Air Source Heat Pump Specifications Regional Technical Forum August 20, 2013.
Staff Updates Regional Technical Forum May 21, 2013.
Middle Fork Project Relicensing Process Plan April 25, 2006.
G UIDELINE R EVISIONS – R ELEASE February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
DRAFT 2013 RTF Work Plan September 19, Workplan Development Process RTF 2013 Workplan ProcessDate Develop draft workplan and present to Operations.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Guidelines Revisions Next Steps April 23, Process to Date Staff and others identified a number of “issues” since guidelines were last approved April.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
UES MEASURE REVIEW PROJECT Final Report March 14, 2012 Regional Technical Forum Presented by: Jeff Romberger.
RTF Delivery Verification Guidance Batch 3 Jennifer Light Regional Technical Forum November 10, 2015.
Guidelines for RTF Measure Costs and Benefits Guidelines (formerly Cost and Non-Energy Benefits Guidelines) Proposal of Guidelines to the Regional Technical.
Review plan of the nature reporting – update 6
Presentation transcript:

Structure and Integration of RTF Guidelines: Savings, Lifetimes and Cost/Benefit July 17, 2012 Regional Technical Forum Presented by: Michael Baker, SBW Adam Hadley, RTF Staff

Topics for Today Status Development Plan Proposed Structure Decision 2 July 17, 2012

Status of Guidelines Savings Estimation Methods  Latest (and only) operative version  Nearly final additional appendices App D – Custom Measures App E – Impact Evaluation  Work under way to fold App D and E into main body and create new operative version Measure Lifetimes  Latest (and only) operative version  Developing the "Standard Information Workbook" Incremental Measure Cost and Benefits  Latest (and only) operative version March 2012  Developing the "Default EUL Table" 3 July 17, 2012

Plan for Integrating RTF Guidelines July meeting – Propose, discuss, adopt overall structure for Guidelines. August meeting – Discuss and adopt a new version of the Savings Guidelines.  Draft July 15 th  Comments August 3 rd  Second draft August 10 th September meeting – Observe the discussion and decision-making related to the Phase II Lifetimes and Cost/Benefit updates.  Debrief with update contractor  Distribute Guidelines integration issues October 6 th 4 July 17, 2012

Plan Continued October meeting  Review a first draft of the consolidated Guidelines “Roadmap” Volume Structural changes in other volumes needed to achieve integration Consistent language and style across volumes  Discuss and Resolve Integration Issues Any changes in meaning, discrepancies, or omissions will be identified and solutions recommended. Technical issues with Lifetime and Cost/Benefit Guidelines identified through the Phase II work Possible subcommittee work to resolve issues November meeting and beyond – Once the issues have been resolved, present a revised draft of integrated Guidelines and assist the RTF with review and adoption. 5 July 17, 2012

Structure of Integrated RTF Guidelines: Four Volumes Volume 1 - Roadmap to RTF Guidelines  5-10 pages, graphically-oriented  RTF work flow and decision-making described  Helps tie together the other three volumes Volume 2 - Savings Estimation Methods  Key Terms, Guidelines, References and Appendices Volume 3 - Incremental Measure Cost and Benefit Estimates  Key Terms, Guidelines, References and Appendices Volume 4 - Measure Lifetime Estimates  Key Terms, Guidelines, References and Appendices 6 July 17, 2012

Proposed Motion Approve the structure of the integrated RTF Guidelines as proposed in this presentation 7 July 17, 2012