1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)

Slides:



Advertisements
Similar presentations
Status on the Mapping of Metadata Standards
Advertisements

National Environmental Research Institute, University of Aarhus, Denmark GIS Guidance update.
MEP/CIC Jan. 12, 2001 NASA’s STEP for Aerospace Workshop Using STEP for Engineering, Fabrication and Construction of Industrial Facilities Mark Palmer.
® Eurostep.ESUKPC v0.1©Copyright Eurostep Limited AP233 – CADM Data Interchange Demo NDIA M&S Presentation David Price February 2005.
Business Area Analysis Focus: Domain View (selected business area) Goals: –Isolate functions and procedures that allow the area to meet its goals –Define.
Lecture Nine Database Planning, Design, and Administration
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
1 1 Roadmap to an IEPD What do developers need to do?
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
® Eurostep.ESUKPC v0.1©Copyright Eurostep Limited DoDAF CADM ISO AP233 OMG UML Converter Interim Report David Price November 2004 INCOSE/OMG Meetings.
Ship Common Information Model (SCIM)
Chapter 6– Artifacts of the process
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
JWST Integrated Modeling Environment James Webb Space Telescope.
Guide to the Software Engineering Body of Knowledge Chapter 1 - Introduction.
Vice President, Engineering NSRP Executive Director
IT in the AEC Industry Fall, 2002 The Need for Data Exchange As computer applications became more numerous in every domain, the need and value for exchange.
Interim SCIM and STEP Implementation 2008 NSRP System Technology Panel Project Ted Briggs, Intergraph Corp. Mike Olson, Northrop Grumman Information Systems.
Reuse and Data Module Code Naming Considerations Mike Olson, Northrop Grumman IT Ted Briggs, Intergraph Integrated Shipbuilding Environment (ISE) ISE-6.
Agenda  Contract issues?  Review AP 214 Linkage mechanisms  Review external reference mechanisms  Populate PDM schema  Next Steps.
RUP Fundamentals - Instructor Notes
Chapter 2 The process Process, Methods, and Tools
PLANNING RSTWG Review of Planning Concept of Operations & Requirements Tasks.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Integrated Logistics Environment (ILE) NSRP Joint Panel Meeting 7 – 9 December 2010 New Orleans, LA 1 Presented by: Michael Olson Northrop Grumman Technical.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael.
Army Net-Centric Data Strategy Center Of Excellence (ANCDS) Army Data Harmonization and Integration Working Group (ADHIWG) Sever Ciorlian ANCDS Team Lead.
27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) Overview April 27, 2006.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented.
1 Integrated Logistics Environment (ILE) Project Presented by : Dr. Burton Gischner Date:May 3, 2011 NSRP Joint Panel Meeting San Diego, CA.
CAM-I Scalable Flexible Manufacturing Initiative NGMS Task 6.1.
DELMIA DPM Assembly This is the Master “Presentation title” page. Type the title of your presentation in the "Presentation title” field. Cette page est.
30 April Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE-6 Final Demonstration Overview.
Development Process and Testing Tools for Content Standards OASIS Symposium: The Meaning of Interoperability May 9, 2006 Simon Frechette, NIST.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
Leading Edge Architecture for Prototyping Systems An Overview.
1 Navy Product Data Initiative Overview May 2007.
ICS (072)Database Systems: An Introduction & Review 1 ICS 424 Advanced Database Systems Dr. Muhammad Shafique.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
3 February Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE Overview Presentation (to.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
Ben Kassel NSWCCD Ted Briggs Intergraph Corporation An Alternate Approach to the Exchange of Ship Product.
Interim SCIM and STEP Implementation 2008 System Technology Panel Project Ted Briggs, Intergraph Mike Olson, Northrop Grumman Ron Wood, Northrop Grumman.
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
John Maciejewski INPO I am John Maciejewski
ISE6 Context Schema Overview
1 Industrial Data Implementors Forum Martin Hardwick STEP Tools, Inc. June 13, 2001 San Francisco, USA.
ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration.
STEP for Multi-Disciplinary Model Management: “Intelligent PDM”
Worldwide Protein Data Bank wwPDB Common D&A Project November 24, 2009 November 24, 2009 Steering Committee Project Update.
Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): Integrated Logistics Environment.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
November 4, An Integrated Logistics Environment for an Effective Shipbuilding & Supporting Enterprise Prepared by: Dr. Burton GischnerElectric Boat.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
OASIS Cloud Authorization TC (CloudAuthZ) Rakesh Radhakrishnan, TC Member.
Manufacturing Systems Integration Division Development Process and Testing Tools for Content Standards Simon Frechette National Institute of Standards.
1 S HIP T ECH 2011 A S HIPBUILDING T ECHNOLOGIES I NFORMATION E XCHANGE Total Ownership Cost/Quality/Energy Efficiency Completion and Validation of the.
EbXML Semantic Content Management Mark Crawford Logistics Management Institute
Software Engineering Lecture 10: System Engineering.
Operating Procedures 1 Mimi Reis NSRP ILE Kick-off Meeting on June 17, 2010 Integrated Logistics Environment Technology Investment Agreement (TIA)
Application of the ISO for BIM Xenia Fiorentini, Engisis.
1 Long Term Retention of Product Model Data Ben Kassel Naval Surface Warfare Center Carderock Division Distribution Statement A : Approved For Public Release;
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
Autodesk Inventor and STEP Solutions
Theorem CADverter for STEP AP242
Unified Modeling Language
Geometry Services for ISO – STEP standards linking product definition, management and visualization in the value chain Jean Brangé :
Presentation transcript:

1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)

NPDI & SCIM l NPDI (Navy Product Data Initiative) –To specify the requirements for and drive the implementation of product data systems based on an open architecture having suitable functionality and enterprise-wide interoperability to support affordable Navy ship design, construction and service life support –Initial version of the IPDE Specification provided to the Navy represents the naval shipbuilders’ best efforts to build consensus among the various shipyards l SCIM (Ship Common Information Model) –Core data model for NPDI IPDE Specification –Separate document from the IPDE Specification being produced by the NPDI Project, but is referenced by that IPDE Specification –SCIM codifies the models developed and prototyped by the ISE Project under NSRP over the past nine years 2

IPDE Scope Integrated Product Development Environment (IPDE) Product Data Manager IPDE Core Capabilities Product Data Management Configuration Mgmt Change Mgmt Status Dep. Mgmt Document Mgmt Process Control Access Control Requirements Tracking Work Authorization Reconfigurable IPDE Product Data Access Product Model Navigation Collaboration Tools Visualization Tools Reporting Tools Tool Integration Material Mgmt. Collaboration Reqts. Mgmt. Logistics Support PublishingDesignEngineeringPlanningTestConstruction Ext. Application ProcurementMRP Other Shipyards Data Exchange 3December 8, 2009 Scope of IPDE Specification Panel Project Final Presentation 3

4 Application Areas in the SCIM SCIM Chapters Completed l PDM and Change Management Fundamentals l Structural Moulded Forms l Ship Arrangements l Structural Detailed Design l Piping Functional Design l Piping Physical Design l Common Parts: Procurement l Product Life Cycle Support SCIM Chapters Required l HVAC Functional Design l HVAC Physical Design l Electrotechnical Functional Design l Electrotechnical Physical Design l Engineering Analysis l Pipe Stress Analysis l Structural CAM To be Developed under Task 2 To be Validated under Task 1

SCIM on ISE Tools 5

Initial validation work from 2009 Panel Project l Purpose –To determine the feasibility of using existing AP214 translators with NPDI SCIM schema to improve the exchange of early and detail design data, and perform an initial validation of the SCIM l Scope –Develop linkage between AP 214 and SCIM file –Ship and Moulded Form test cases –Structural test cases –Piping test cases l Deliverables –Test Cases –SPS Paper – technical approach –Final Report – includes SCIM recommendations 6

Panel Project Lessons Learned l Technical approach which links AP 214 geometry and SCIM ship design data is viable for CAD translators which generate XML attribute file l SCIM schemas were sufficiently defined for NPDI specification, but additional work was required for translator usage l SCIM model is missing STEP geometry definitions l Determined use of SCIM still requires access to ISO STEP documentation l STEP expertise required to implement SCIM schema l STEP geometry viewer required to hand populate SCIM files 7

Panel Project Recommendations  Incorporate external reference mechanism into SCIM l Include documentation for STEP geometry model with the SCIM l Define mandatory attributes in SCIM documentation l Validate SCIM schema against STEP schema to identify any missing attributes or relationships l Provide a SCIM User’s Guide with examples l Include fully expanded XML schemas with SCIM documents l Reference required ISO STEP documentation where required 8