O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.

Slides:



Advertisements
Similar presentations
Will Minter Division Director, Asset Management & Small Business Programs Office November 15, 2006 ITER Project.
Advertisements

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Center for Computational Sciences Cray X1 and Black Widow at ORNL Center for Computational.
A Feedback and Continuous Improvement Tool to ACE Audit Readiness Keith S. Joy Quality Manager September 14, 2004.
Recommendations Ward Plummer BESAC Subpanel Review of IPNS and LANSCE/Lujan Center Recommendations Ward Plummer Washington, D. C. December 11, 2000.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
HYSPEC Instrument: Status and Performance M. Hagen Neutron Facilities Development Division, SNS, Oak Ridge National Lab. W.J. Leonhardt and A. Ruga Condensed.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Sustainable Design An Overview of the Sustainability Efforts at Oak Ridge National Laboratory.
Department of Energy Review of the SNS Instruments –Next Generation (SING) Project HYSPEC Instrument: Status and Performance Mark Hagen Instrument Scientist.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Experimental Facilities DivisionOak Ridge SNS INSTRUMENTS OVERVIEW R. K. Crawford Instrument Systems Senior Team Leader September 10, 2004 HYSPEC IDT Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
ICS – Software Engineering Group 1 Status of SNS Carl Lionberger.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Update T. E. Mason Oak Ridge National Laboratory Associate.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 SNS 2 Meeting Opening Remarks, Purpose Glenn R. Young Physics Division, ORNL August 28,
F Project X Overview Dave McGinnis October 12, 2007.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
OFFICE OF SCIENCE The Making of the Spallation Neutron Source A 25-Year Journey Patricia Dehmer Deputy Director for Science Programs & Acting Director.
Neutron Diffractometer at MIT Nuclear Reactor Laboratory Neutron scattering and spectroscopy are among the pre-eminent tools for studying the structure.
Ted Fox Interim Associate Laboratory Director Energy and Engineering Sciences Oak Ridge, Tennessee March 21, 2006 Oak Ridge National Laboratory.
Stepper Motor Control, PLC vs VME Herb Strong, Pam Gurd Spallation Neutron Source Oak Ridge National Laboratory October 17, 2007.
Anthony Indelicato DOE-Princeton Site Office May 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the NSTX.
Alexander Aleksandrov Oak Ridge National Laboratory
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Ideas on a Framework and Methods for Estimating the Benefits of Government- Sponsored.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012.
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Dynamically Polarized Solid Target for Neutron Scattering at the SNS PST 07 J.K. Zhao Neutron Scattering Sciences Division, Spallation Neutron Source Oak.
Anthony Indelicato DOE-Princeton Site Office February 2014 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
European Spallation Source Science Advisory Committee February 5-6, 2014 Jim Yeck CEO & Director General.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
LCLS 2009 NSLS-II 2015 APS 1995 BES Light & Neutron Sources SPEAR ALS 1993 HFIR 2008 SNS
Anthony Indelicato DOE-Princeton Site Office December 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
News and brief overview of Beamline plans for the next few months
Operations Department
Advanced Research Electron Accelerator Laboratory
ESS Project Status Roland Garoby – Technical Director August 2018.
Ciprian Plostinar Workshop on Testing and Commissioning
Details supporting the increase
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Welcome Update on ESS Construction Project
Linac Coherent Light Source Transition to Operations 11 July 2007
Department Of Energy Review Linac Coherent Light Source Project
Licensing update ESHAC #7, October 2017
Charge and Agenda of the 18th TAC meeting
Accelerator Installation Schedule
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory Associate Laboratory Director for the SNS May 28, 2003 Arlington, VA BESAC

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source The SNS will begin operation in 2006 At 1.4 MW it will be ~8x ISIS, the world’s leading pulsed spallation source The peak neutron flux will be ~20-100x ILL SNS will be the world’s leading facility for neutron scattering It will be a short drive from HFIR, a reactor source with a flux comparable to the ILL

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY SNS - Guiding Principles SNS will provide high availability, high reliability operation of the world’s most powerful pulsed neutron source (cf white paper) It will operate as a User Facility to support peer reviewed research on a Best-in-Class suite of instruments –Research conducted at SNS will be at the forefront of biology, chemistry, physics, materials science and engineering SNS will have the capability to advance the state of the art in spallation neutron source technology. This includes: –R&D in accelerators, target, and instruments to keep SNS at the forefront –Planned enhancement of SNS performance through upgrades of the complex and ongoing instrument development as part of the normal operating life of the facility

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY SNS 20-Year Plan SNS will evolve along the path envisaged in the Russell Panel specifications In twenty years it should be operating ~45 best-in-class instruments with two differently optimized target stations and a beam power in the 3-4 MW range The Power Upgrade and Long Wavelength Target Station should follow a sequence that meshes with deployment of the initial capability and national needs –This future depends on success with the present 1.4 MW, 1 Target Station SNS!

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Project Status The FY 2003 request was $225M, fully funded (rescission restored by supplemental) The FY 2004 request is $143M as expected Overall project design is 88% complete Overall the project is 61% complete (through March 2003) and within budget and schedule constraints $1.4B and June 2006 completion Contingency is adequate at ~20% ES&H performance outstanding >3 million hours without lost workday injury (combined hours worked for construction site and SNS/ORNL)

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Cost Baseline *Based on EAC and estimated costs and awards through 10/31/02. **Based on EAC and estimated costs and awards through 4/30/03.

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Project Cumulative CPI and SPI are Stable CPI/ SPI G G

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Major Accomplishments Since Nov Steel erection on CLO (Nov. 25) and Target Building (Jan. 27) Linac Tunnel 1000 MeV and Klystron BOD (Dec 18, Jan. 17) Front End Beam ready for DTL commissioning (Dec. 30) Integrated Cryomodule test with Low Level RF (March 1) HEBT Service Building and HEBT BOD (Mar. 28, Apr. 10) Start Linac Installation (Apr. 4) Start Target Installation (Apr. 11) RF into DTL Tank 3 (May 1)

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Steel Erection on CLO and Target Building

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Linac Tunnel 1000 MeV and Klystron BOD

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Re-Commissioning of FES Front End Systems commissioning and IPS milestone: Front End Beam available to DTL: DONE ! Ran 24/7 starting December 14, 2002; continued until Jan. 31, /14/02 20  sec/div

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Integrated Cryomodule Test with Low Level RF Figure1. Cavity amplitude and phase with feedforward & feedback control. 10MV/m, 1.2 msec, 60 Hz. 1%1% Figure 2. Magnified version of Figure 1

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY HEBT Service Building and HEBT BOD

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Start Linac Installation

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Start Target Installation

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY RF into DTL Tank 3

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Operations Planning We are continuing to develop plans for operations –Major activity over the past 9-12 months was discussions with the ATLC (Atomic Trades and Labor Council) on crafts personnel for operations (construction is a separate issue covered under Project Labor Agreement and Davis-Bacon determination) –Through an Interest Based Bargaining process we have reached agreement that provides for  A dedicated crafts core team that will service SNS facilities from the lab Facilities and Operations Directorate (for traditional craft designations)  A new multiskilled Research Mechanic that will allow for integration with ASD workforce and provide flexibility needed to support accelerator (and other technical) operations –Increased accelerator operator staffing during pre-operations by nine FTE years

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 16 Instruments Now Formally Approved

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Summary Although much work remains we are on track to complete the world’s most powerful facility for studies of the structure and dynamics of materials safely, on time, and within the approved budget Due to improvements in technology and ongoing value engineering, the facility will deliver higher beam power, better performing instruments, and more laboratory and office space for staff and users than initially thought possible at the time the project was approved We are adapting our plans to deal with issues as they arise, achieving key milestones and recovering from difficulties