Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, 2015 1 Northern Lights Express Minneapolis-Duluth/Superior Passenger.

Slides:



Advertisements
Similar presentations
New Public Transit Alliance (NuPTA) RIPEC Study: Transportation at a Crossroads (2002) Growing Smart with Transit: A Report of the Transit 2020 Working.
Advertisements

Minnesota Passenger Rail Presentation Transportation Finance Advisory Committee presented by: Mn/DOTs Passenger Rail Office May 18, 2012.
2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan February 2010 presented by: Minnesota Department of Transportation and Cambridge.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
CENTRAL CORRIDOR TRANSIT ACCESS STUDY Citizens for Modern Transit March 27, 2014.
Briefing on a Cost-Benefit Analysis Framework for Transit Investments in the Washington Region David Lewis Ph.D. Chief Economist HDR|Decision Economics.
First Statewide Comprehensive Rail Plan for MN Commissioned by 2008 Legislature Compliant with 2008 PRIIA Federal Rules 6 Months to prepare, 10 Months.
Department of Industrial Engineering1 Economic Evaluation of the Impact of Waterways on the Port of Cincinnati-Tristate Heather Nachtmann, Ph.D. River.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
Oregon Passenger Rail EIS Project Leadership Council Hal Gard, Rail Administrator, ODOT John Sibold, Cascade Rail Corridor Director, WSDOT Salem, OR June.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
Passenger Rail – Plan & Opportunities Engineer Contractor Conference Middleton, WI January 21, 2010.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
High Speed Rail on the Horizon State Public Transportation Partnerships Conference Westin Hotel, Seattle, WA August 3 - 5, 2010 Paula Hammond Secretary.
MTF Rail Development Forum
Oceanside-Escondido Rail Line Final Project Presentation John R. VelascoMay 12 th, 2003.
2015 Interregional Transportation Strategic Plan Active Transportation and Livable Communities August 21, 2014 Scott Sauer.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
M IAMI F ORT L AUDERDALE W EST P ALM B EACH O RLANDO Addresses Florida’s demand for express, intercity rail travel. Is designed to serve tourists, business.
RTA Legislation Crafted with Three Principles  Keep it simple  Provide maximum local flexibility  Utilize existing law whenever possible.
1. 2 VIA Long Range Plan  Vision for High-Capacity Transit across VIA service area by 2035  From extensive public and stakeholder input  Prioritization.
Minnesota Department of Transportation ARRA, Greater Minnesota Transit, Airport Program Status, & Local Bridge Bonding Update House Transportation Finance.
Midwest High Speed Rail Case StudySeptember 29th, 2004 Andy Inserra, Kristin Thompson, T.J. Thurlow, Natalie Villwock.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
December 12-13, 2007 Item 4.4 Tab 31 California State Rail Plan to
May 25, 2010 Wisconsin High Speed Intercity Passenger Rail From vision to reality MADISON COMMUNITY MEETING John Oimoen, High Speed Passenger Rail Program.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
September 19 & 20, 2007 Items 4.11a,b, & c Tabs 15, 16, & 17 Proposition 1B Intercity Rail Bond Program.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
2006 Annual Report on the Status of the Implementation of Proposition 400 Management Committee 9/6/06.
Talking Freight Promoting Economic Revitalization through Enhanced Freight Transportation Eric G. Madden Deputy Secretary for Aviation and Rail Freight.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
1 Mississippi River Bridge An Analysis of Alternatives Expert Panel Review Sharon Greene & Associates.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Moving Passengers and Products: The Ohio Hub Rail Study Ohio Rail Development Commission Lima – December 13, 2004 Provided Courtesy of the Good Governance.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Chicago – St. Louis High Speed Rail Program July 9, 2015
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
Northern Lights Express Minneapolis/Duluth-Superior Passenger Rail Alliance February 24, Northern Lights Express Minneapolis/Duluth-Superior Passenger.
Review of 2016–2021 Strategic Budget Plan Development Process and 2016 Budget Assumptions Financial Administration and Audit Committee April 14,
Multi Agency Exchange May 16, 2017.
Public Conference December
Regional Roads Committee
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
I-85 Corridor Light Rail Transit Feasibility Study
Central Corridor - Light Rail Transit Metropolitan Council
Chicago to Council Bluffs-Omaha
Presentation transcript:

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, 2015 December 16, 2015 Minneapolis Duluth/Superior Passenger Rail Alliance 1 NORTHERN LIGHTS EXPRESS PROJECT STATUS

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, NLX -- Project Management Oversight Project Kick-Off Meeting December 19, 2012 December 16, 2015 Minneapolis Duluth/Superior Passenger Rail Alliance 2 BACKGROUND

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Northern Lights Express Intercity passenger rail service between Minneapolis and Duluth 152-mile corridor on existing BNSF track Intermediate Stations Coon Rapids, Cambridge, Hinckley & Superior WI An alternative travel option that is safe, reliable and frequent

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Northern Lights Express The NLX Project is led by: The Minnesota Department of Transportation in consultation with: The Federal Railroad Administration and with cooperation from: The Minneapolis-Duluth/Superior Passenger Rail Alliance, The Wisconsin Department of Transportation and Local communities.

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Northern Lights Express March 2013 NLX Service Development Plan Tier 1 Service Level Environmental Assessment August 2013 Finding of No Significant Impact and State Negative Declaration 4 th quarter 2013 Begin PE/NEPA phase

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Current Work -- PE/NEPA Phase Financial Planning Ridership Forecasts Capital Cost Operating Cost Benefit-Cost Analysis Operational Planning Testing of Alternative Service Plans RTC Capacity Analysis Preliminary Engineering Station Design Track Design Systems Design Grade Crossings Tier 2 Project Level Environmental Assessment

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Current Work -- PE/NEPA Phase Financial Planning Ridership Forecasts Capital Cost Operating Cost Benefit-Cost Analysis Operational Planning Testing of Alternative Service Plans RTC Capacity Analysis Preliminary Engineering Station Design Track Design Systems Design Grade Crossings Tier 2 Project Level Environmental Assessment

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, NLX -- Project Management Oversight Project Kick-Off Meeting December 19, 2012 December 16, 2015 Minneapolis Duluth/Superior Passenger Rail Alliance 8 PRELIMINARY OPERATING PLAN

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Operational Plans Tested Operational alternatives: 110 maximum speed 4 round trips 8 round trips 90 mph maximum speed 2 round trips 4 round trips 6 round trips 8 round trips Express service from Duluth to Minneapolis Local service from Hinckley to Minneapolis Based on preliminary benefit cost analysis: 4 round trips at 90 mph maximum speed appears to have the highest BC ratio Preferred operational alternative Preparation of final BCA analysis will follow completion of discussions with BNSF Railway regarding several operational and cost issues.

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Possible NLX Schedule A preliminary benefit-cost analysis has indicated that the most cost-effective operating plan is probably 4 round trips at speeds up to 90 miles per hour. About 2½ hours travel time between the Twin Cities and the Twin Ports

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, NLX -- Project Management Oversight Project Kick-Off Meeting December 19, 2012 December 16, 2015 Minneapolis Duluth/Superior Passenger Rail Alliance 11 RIDERSHIP FORECASTS

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Ridership Forecasts Annual Ridership Current Forecasts , , , ,000,000 Tier 1 Forecasts , ,376,000 High speed passenger rail connection to Chicago Assumed in Tier 1 EA Not assumed in current forecasts 13% of Tier 1 ridership associated with direct connection to Chicago Tier 1 w/o direct connection , ,200,000 18% drop in ridership Change from 8 to 4 round trips.

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, NLX -- Project Management Oversight Project Kick-Off Meeting December 19, 2012 December 16, 2015 Minneapolis Duluth/Superior Passenger Rail Alliance 13 CAPACITY ANALYSIS

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Objective Identify capacity improvements for BNSF track necessary to support reliable freight and passenger service Inputs Existing track geometry plus scheduled improvements Existing and anticipated freight and passenger train traffic Proposed NLX traffic Outputs Track improvements Signal improvements RTC Capacity Analysis

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Capacity Improvements Track Upgrade for higher speed Extend existing sidings Double track near Superior Third main – Coon Creek/Northtown Signal improvements Centralized Traffic Control (CTC) Power switches remotely Positive Train Control (PTC) Ensure safe operation

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Other Implementation Costs Safety Upgrade safety measures at all grade crossings – Both public and private Minimum of flashing lights, gates and medians Close crossings where possible Stations Adding track and platforms at Target Field Station in Minneapolis The Depot in Duluth New Stations at Coon Rapids Cambridge Hinckley Superior Maintenance facility Equipment Locomotives and Coaches Layover facilities Professional Services (16%) Contingency (25%)

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Implementation Cost Tier 1 EA $990 M Current estimates Between $500 M and $600 M Upcoming discussions with BNSF will determine what portion of the implementation cost will be funded by BNSF.

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, NLX -- Project Management Oversight Project Kick-Off Meeting December 19, 2012 December 16, 2015 Minneapolis Duluth/Superior Passenger Rail Alliance 18 EQUIPMENT

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Equipment For planning purposes, it is assumed that the equipment will be Next Generation high speed diesel-electric locomotives Next Generation Bi-level coaches Upcoming discussions with BNSF will determine the actual equipment to be utilized.

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, NLX -- Project Management Oversight Project Kick-Off Meeting December 19, 2012 December 16, 2015 Minneapolis Duluth/Superior Passenger Rail Alliance 20 STATIONS

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Station Design Platform Climate controlled station building Platform shelters Access facilities Parking Pedestrian connections Transit stops and shelters Drop-off/Pick-up locations Taxi stands Lighting ADA compliant

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Station Renderings

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, NLX -- Project Management Oversight Project Kick-Off Meeting December 19, 2012 December 16, 2015 Minneapolis Duluth/Superior Passenger Rail Alliance 23 OPERATING COST ESTIMATES

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Operating Cost Estimates For the first five years: Operating cost is expected to average in the range of $17.5 M per year. Revenue from fares is expected to average in the range of $12.8 M per year. Fare recovery ratio will average in the range of 74% MnDOT policy will be set fares to maximize revenue Final operating cost estimates will depend upon the resolution of several operational issues in discussions with BNSF Railway

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, NLX -- Project Management Oversight Project Kick-Off Meeting December 19, 2012 December 16, 2015 Minneapolis Duluth/Superior Passenger Rail Alliance 25 RETURN ON INVESTMENT

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Return on Investment Benefits Safety Reduced highway crashes Environmental Sustainability Reduced CO 2 Reduce emissions Economic Competitiveness Travel cost savings Productivity savings Marginal congestion savings Benefits to freight service Other Effects Quality of Life Property premium Economic Impact Employment Construction jobs Operating jobs Spin-off effects Economic Activity Improved access to jobs Improved access to labor force Retail sales Tourism State and local taxes Sales taxes Income taxes Property taxes

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Preliminary Assessment of Benefits Safety Benefits Safety benefits from reduced highway fatalities and crashes are in the range of $165 M. Environmental Sustainability Environmental sustainability benefits from emissions savings and CO 2 reduction are in the range of $47 M. Economic Competitiveness Economic competitiveness benefits from travel cost and productivity savings and highway congestion avoidance are in the range of $158 M. Quality of Life NLX will provide safe, reliable, and frequent service to activities in the cities it serves, such as professional sports events in the Twin Cities and Grandma’s Marathon in Duluth. Station Area Development NLX service will result in increased property values, increased investments and station related development. NLX is expected to generate an estimated increase in property values in the range of $136 M. After discussions with BNSF Additional benefits will be calculated related to improved freight movement for both the railroad and shippers. Potential benefits may apply to Northstar operations.

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Preliminary Assessment of Economic Growth Job Growth NLX will broaden the labor market and connect workers to a wider network of employers. NLX will result in an estimated increase in employment in the range of 3,100 jobs annually during construction and 380 jobs annually during the first 5 years of operation. Tourism NLX will foster tourism activity and special event attendance in the corridor. NLX will result in an estimated increase in tourism revenues in the range of $378 M and an increase in tourism related wages in the range of $233M over a 40-year period. Revenue Combined, the first year of construction and the first year of operation will increase state and local tax revenue in the range of $16M. Over a 40-year period, the increased economic activity associated with NLX will generate an estimated increase in state and local taxes in the range of $355 M. Economic Impact Analysis Preliminary economic impact analysis demonstrates a positive return on investment. Increased economic activity that is expected to occur as a result of the operation of NLX will return actual dollars to the State and local governments.

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, NLX -- Project Management Oversight Project Kick-Off Meeting December 19, 2012 December 16, 2015 Minneapolis Duluth/Superior Passenger Rail Alliance 29 SUMMARY AND NEXT STEPS

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Current Work -- PE/NEPA Phase Financial Planning Ridership Forecasts Capital Cost Operating Cost Benefit-Cost Analysis Operational Planning Testing of Alternative Service Plans RTC Capacity Analysis Preliminary Engineering Station Design Track Design Systems Design Grade Crossings Tier 2 Project Level Environmental Assessment

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Current Work -- PE/NEPA Phase Financial Planning Ridership Forecasts Capital Cost Operating Cost Benefit-Cost Analysis Operational Planning Testing of Alternative Service Plans RTC Capacity Analysis Preliminary Engineering Station Design Track Design Systems Design Grade Crossings Tier 2 Project Level Environmental Assessment Consult with BNSF Railway

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, BNSF Coordination With the preliminary selection of the preferred operational alternative, MnDOT will begin serious discussions with BNSF regarding several issues. Capital improvements to track and systems to support: Increased capacity Increased speed Reliability of passenger operations Reliability of freight operations Capital cost estimates Operating assumptions Future operator Schedule Equipment Operating practices Performance goals Operating cost estimates

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Next Steps Discussions with BNSF Railway Finalize: Capital cost estimates Operating cost estimates Benefit-cost analysis Economic impact analysis Prepare Financial Plan/Business Plan Complete Hinckley Loop study Preliminary engineering Tier 2 EA Prepare Implementation Plan Revise Service Development Plan

Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Schedule 2 nd Quarter 2016 Financial Plan 4 th Quarter 2016 Complete Preliminary Engineering Complete Tier 2 Project Level EA 1 st Quarter 2017 Implementation Plan Service Development Plan