Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

Slides:



Advertisements
Similar presentations
Frédérick BORDRY – LHCMAC 22- 6th December 2007 Review of the experience of LHC powering: short-circuit tests and sector 7-8 and start of powering sector.
Advertisements

Controls Configuration Service Overview GSI Antonio on behalf of the Controls Configuration team Beams Department Controls Group Data & Applications.
AT Equ. Groups / AB-CO Control responsibility Sharing.
Post Mortem Workshop - discussion1 17/1/2007 HWC Requirements GMPMA  Concentrate on pre-beam requirements Post-quench analysis ([semi-] automatic) Integrity.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Selected Subjects on Controls System - Quality Assurance P.Charrue On behalf of the AB Controls Group LHC Machine Advisory Committee 16 June 2006.
LHC-MAC1 LHC Controls Infrastructure and the timing system Hermann Schmickler on behalf of the CERN Accelerator and Beams Controls Group.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
controls Middleware – OVERVIEW & architecture 26th June 2013
TE/MPE/MI OP section meeting 29 th September 2009 HCC 2009 Frequently Asked Questions 0v1 M. Zerlauth.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
LARP Collaboration April 26 th 2006 The Commissioning of the Technical Systems of LHC 1.The final validation that all the collider components/systems.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Logging Mike Lamont Georges Henry Hemlesoet AB/OP Discussions with M. Pace & C. Roderick.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Reliability of the Quench Protection System for the LHC s.c. Elements F. Rodriguez-Mateos and Antonio Vergara (both TS now, AT when the work was done)
Review of Hardware Commissioning May 11-13, 2005 Hardware Commissioning Co-ordination Organisation Roberto Saban the logic day to day organization safety.
Summary and Discussion Rüdiger Schmidt Summary and discussions.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
HC Review F. Rodriguez-Mateos Powering tests The outcome of the work conducted within HCWG and many discussions among colleagues.
Experimental Areas Controls Review  AB/CO Viewpoint Vito Baggiolini (on behalf of the CESAR team and several people in CO)
Hardware Commissioning Review, Markus Zerlauth, 11 th July CO deliverables for HWC – lessons learnt and the proposed way ahead Markus Zerlauth,
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD.
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
European Organization for Nuclear Research Industrial Controls Group Workshop on QPS Software Layer, 26/08/15
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Roberto Saban TS HC Review bis Outline  Interviews of all the Group Leaders loosely or tightly concerned by hardware commissioning proposing them.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
HWC Review – Sequencer Vito Baggiolini AB/CO, with the team: Carlos Castillo, Daniele Raffo, Roman Gorbonosov.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
HC Review Follow-up – June 22 nd – 23 rd 2006 What has been going on in the field: a status report F. Rodriguez-Mateos, TS-HDO on behalf of the HCC Team.
Support for Technical Infrastructure operations P. Sollander, AB/OP/TI.
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
TC CO July HCC report HCC report Summary of the tests of the LSS8L power converters in short-circuit F. Rodríguez-Mateos on behalf of R.Ballet-Thouble,
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
R. Denz, A. Gomez Alonso, AT-MEL-PM
Powering LHC magnets version 30/3/2007.
Minimum Hardware Commissioning – Disclaimer
Alarms in relation to PM
The Control System For LHC Hardware Commissioning
Powering from short circuit tests up to nominal
Brief report of the hardware commissioning activities
Review of hardware commissioning
Presentation transcript:

Hardware Commissioning Tools Robin

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio Vergara (PM Workshop) Inventory of Tools Spotlight on some favourites! Near future -> Vito

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL3 Commissioning of a SC Circuit 1. Individual System Tests 2. Short-Circuit Tests Antonio Vergara

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL4 Commissioning of a SC Circuit 1. Individual System Tests 2. Short-Circuit Tests 3. Powering Procedure Tests 4. Interlock Tests PIC1 5. Powering Tests COOL-DOWN Connection Converter-Magnets Antonio Vergara

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL5 Single Circuit Powering Test 350A PIC2 Injection 760A EE SPA FPA Quench 2 kA Loss PP EE Quench 6 kA 8.5 kA 12 kA RB Circuit PM data PM Analysis Results Antonio Vergara The sequence is crucial - RJL

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL6 The Commissioning Scenario RB, RQF,RQD IP Q&D Correctors A Inner Triplet Correctors FRONT 1 FRONT 2 Antonio Vergara

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL7 Parallelisms and Constraints The 3 types of parallelisms: Parallelisms between sectors Parallelisms between fronts Parallelisms between circuits – SOC SOC: Set Of Circuits. Battery of circuits commissioned in parallel by the same front Antonio Vergara Several: 1s of teams, 10s of tests, 100s of circuits, - RJL

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL8 The Commissioning Scenario: Schedule SECTOR JAN FEB MAR APR MAY JUN Cool-Down PIC1 Powering Tests weeks Connection to leads 200 SC Circuits Antonio Vergara

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL9 Developed Tools The Sequencer Reference and LSA Databases Individual Supervision Systems Alarms – Laser, Logging Test Management Software: SOC Editor Post-Mortem Local Analysis Tools Post-Mortem Global Analysis Tool MTF Antonio Vergara

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL10 The LHC Ring Commissioning Tools CERN Tools CCM Logbook LASER XCluc Equip State SDDS Brwsr WIC Supervision LSA Function Generation and driving Others Measurement System Logging database Naming database Reference Database MTF LSA Database Timber and Meter Old Sequencer Equip Monitor for FGC Equip State Fixed Display Set of the Day Editor PIC Supervision JAPC Monitoring Logging Surveillance For short circuit tests CIET Supervision Cryo plant supervision Cool down QPS Expert Tool QPS Supervision Circuit Synoptic PM Tools New Sequencer PIC and P2N

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL11 Console Manager Screenshot

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL12 Old Sequencer Screenshot

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL13 PIC Supervision Screenshot

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL14 Cryo Process Supervision Screenshot

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL15 Logging Client Screenshot, supplier UNICOS

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL16 SOC Editor Screenshot

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL17 Reporting and Specifying Bodies

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL18 Latest plan

AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL19 Last words Plenty of room to screw up during commissioning, the control system must guide the operator to help avoid mistakes After commissioning the safety systems the control system must reduce the stress on them