1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.

Slides:



Advertisements
Similar presentations
PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
Advertisements

Plato at ASI Tues 05/May/09Dave Walton Plato meeting Rome Tues 5/May/09 Focal Plane Dave Walton UCL/MSSL, + Leicester University Miguel Mas INTA/CAB +
LWIR FPA Mirror Image Problem & Recovery April 11, 2011 Roy W. Esplin Dave McLain.
PACS IBDR 27/28 Feb 2002 PACS Cryo Harness1 U.Grözinger, D.Lemke, R.Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from CSL,
PACS IIDR 01/02 Mar 2001 Photoconductor Detector Arrays1 Photoconductor Detector Arrays for PAC S IIDR - ESTEC Stefan Kraft ANTEC-GmbH Germany Günter.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
© DIAMOND SA / / 1 DIAMOND AVIM Connector Fiber optic connector for aero-space applications.
PACS IHDR 12/13 Nov 2003 PACS FPU Mirrors and Black Paint R. Graue, D. Kampf Kayser-Threde.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS INSTRUMENT HARDWARE DESIGN REVIEW CEA-Grenoble / DSM / DRFMC / SBT / HSO Cryocoolers/ PACS IHDR1 MPE - November, HSO SORPTION COOLERS Lionel.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
PACS IBDR 27/28 February 2002 PACS Grating Assembly1 Grating Assembly E. Renotte Centre Spatial de Liège (B)
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
NIRSpec IFU Eric Prieto Final Presentation Definition Phase May, 11th – ESTEC.
1 Using In-situ Cryogenic Radiometers to Measure the Performance of a Large Thermal Vacuum Chamber Michael DiPirro 1, Edgar Canavan 1, James Tuttle 1,
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
Simbol–X workshopMay 14th, 2007 The Simbol-X Detector Payload P. Laurent CEA/Saclay & APC.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
Report on Payload and Calibration splinter meeting B. Maffei M. Bersanelli 1CERN May 2016.
PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
Status of the SWAP instrument
Summary FM design overview (As built) Documentation FM performances.
iSHELL Design Review Cryostat & Optics Bench
Another Modular Focal Plane: Part 2 – FP assembly
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
SPICA / FPI Mechanical /Optical Issues
Presentation transcript:

1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique

2DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 INTRODUCTION PhFPU Requirements BFP & PhFPU : - Design -Thermal & Grounding Scheme - Validation & Qualification Critical Items

3DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 PhFPU Requirements Mass around 7 kg. External Envelope & Mechanical I/F according to the Doc. : PACS-KT-ID-005-iss.4 Admissible Load according to the Doc : PACS-KT- AN-005-iss.2 Thermal Consumption : -  to 12µW at 300mK -  to 4,3mW at 2K without the Cooler

4DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 BFP : Design The BFP is mainly composed by 5 Sub-assemblies: the mechanical structure, the focal plane at 300 mK, the 300mK thermal strap the 2K circuit buffer, the envelope.

5DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 BFP : Design Review BFP SpecificationsBFP Design Dimensions Mass 90x90x80 500g / BFP 86x86x70 (without 2K shield Cone) B-BFP : 630g included 2K shield Cone R-BFP : 550g included 2K shield Cone Thermal Load on 300mkMech. Structure < 1µW Elect. Connections < 1µW Mechanical Structure : 0,6 µW Elec. Connect. : 0,66 µW Eigenfrequencies Admissible Loads Transv. mode : > 150Hz Axial mode : > 150Hz Transverse mode : 200 Hz Axial mode : 500 Hz Thermal Load on 2K (through 2K/4K Rib. Cabl.) < WPower ON: W (calculated) Power OFF: 2, W (calculated) Spectral BandsB-BFP: µm µm R-BFP: µm HP filter : High Pass 60 µm + AG filter : Low Pass 130 µm Two Band Pass HP filters on a 2K filter wheel (not SAp delivery) : 60-90µm / µm HP filter : High Pass 130 µm + AG filter : Low Pass 210 µm One Band Pass HP filter at the end of the 2K shield Cone located at the pupil Stray LightFIR Black Coating on critical areas

6DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, K Structure Connector Panel Cooler Harness Holder PhFPU : Design The PhFPU is mainly composed of 8 Sub-assemblies: the 4K Structure,

7DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 R & B BFPs Holder Stainless Steel Insulating Tubes Voltalef Insulating Spacers PhFPU : Design the 2K Structure,

8DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 R BFP B BFP R&B BFP Filters Boxes R&B 2K/4K Ribbon Cables PhFPU : Design the two BFPs Red & Blue,

9DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, He Cooler 3He Cooler Harness L0 Straps Baffling Shield Covers PhFPU : Design the 3He sorption Cooler

10DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, mK Thermal Strap Kevlar wires suspension to the 4K 3He Cooler Thermal Interface R&B BFPs Thermall I/F R&B Copper Braid Kevlar wires suspension to the 2K Copper Braid Stray light Baffling PhFPU : Design the PhFPU 300mK Thermal Strap from the cooler to the BFPs

11DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, K Feedthrough (by KT) R&B BFP L0 I/F L0 Strap I/F Copper Braids Stray Light Baffle PhFPU : Design the 2K Thermal Strap,

12DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, K Baffle 4K Baffle PhFPU : Design & the Baffles.

13DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 PhFPU : Design PhFPU assembly Status: Mechanical I/F: OK Optical I/F: SOAM (KT) Parts Manufacturing: OK Integration Tools: OK Black Paint: in progress Full Assembly: First Time Thermal: to be validated

14DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 PhFPU Thermal Equivalent Scheme R3 R1 Rc3 R6 Rc1 Rc4 PhFPU 2K I/F PhFPU 4K Structure  PhFPU  élec =2,8mW (B&R BFP)  flex =0,5mW  struct =0,8mW  Feedth. =0,5mW TBC by KT Evap. Switch I/F T  2K R2 Rc2 Pump Switch I/F h  0,12W.K -1  Evap.  Pump. h  0,075W.K -1 Global Thermal budget on the L0 level: - 4,1mW + 0,5mW* *:(TBC by KT) L0 Straps manufacturing is under responsibility of Astrium

15DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 PhFPU Grounding scheme Pump Evap. Cooler 4K Space Scraft L0 Thermal Straps He Tank Optical Bench PhFPU 4K BFP 2K The PhFPU grounding configuration is like represented: - one 2K close to the bolometers and signal - one 4K performed by the outer PhFPU and Cooler Structure - the electrical insulation between the two shields are performed by: - Voltalef parts at the Structure level - 0,1mm layer of STYCAST 1266 between copper foils at the Thermal Strap level (300mK & 2K)

16DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 Validation & Qualification Succesful Warm vibrations have been done : - on a BFP Structure alone - at the PhFPU level - & at the Instrument level A new PhFPU SM has been build for the Cold vibration campaign at CSL. The BFP Kevlar suspensions only survived to the first two axis (Y & Z), and a breakage occured at the beginning of the third run (X). But higher input levels than specified in the IIDA was applied.

17DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 BFP : Validation & Qualification – Future Tests Cold vibrations are planed : - on a BFP Structure alone - on a BFP equiped with detectors and its complete readout circuit to validate all the interconnections from the detectors to the end of the 2K/4K Ribbon Cable. New stiffness measurements at 4K will be done on a BFP Structure in two directions : - axial (applied load  to the focal plane) - transverse ( // to the focal plane) These tests should be repeated 2 or 3 times on the same Structure to study the thermal cycling influence on the Kevlar wire suspensions.

18DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 PhFPU : Validation & Qualification – Future Tests A complete PhFPU FEM is complete now with the Cooler & the BFP Kevlar suspensions Warm vibrations will be done at the PhFPU level to investigate potential coupling between the PhFPU 4K Structure and 3He Cooler: Cooler SM refurbished with a Titanium core and a functionnal switch linked to a representative L0 Strap: TBC!). New cold vibrations campaign under negociation (ESA/Inst).

19DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 PhFPU Critical Items Critical: Qualification at Cold temperature BFP Kevlar wire suspension Mechanical load on the Cooler thermal switches I/F To be validated: 0,3K Strap thermal behaviour (without & with electrical insulating parts. Cooler behaviour mounted on the PhFPU (thermal environment)

20DSM/DAPNIA/SAp – J. Martignac PhFPU Design PACS - IHDR - MPE – Nov. 12 – 13, 2003 Progress since IBDR 3 models of the PhFPU have been built: SMKT, SMKT2 & SOAM Warm vibrations done succesfully passed at sub-assembly and at instrument level BFP assembly & integration is now completely stabilised 2K/4K ribbon cables manufacturing is now under control PhFPU design is complete, all the parts for the QM are manufactured