This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661, the State of Michigan.

Slides:



Advertisements
Similar presentations
HelpDesk OSP Presentation HelpDesk OSP converts s into SharePoint list items HelpDesk OSP creates SharePoint list items from Outlook HelpDesk OSP.
Advertisements

MOSS 2007 Document Management Adam McCarthy 1 st April 2009.
CSS: where do we want to go? Gabriele Carcassi Contributions from: Gabriele Carcassi, Kunal Shroff – BNL Jan Hatje – DESY Kay Kasemir – ORNL.
Simple Git Steve Pieper. Topics Git considerations and Slicer Git as if it were svn Git the way it is meant to be.
© 2008 RightNow Technologies, Inc. Title Best Practices for Maintaining Your RightNow Knowledge Base Penni Kolpin Knowledge Engineer.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
JCA 2.0 Eric. Boucher – APS EPICS Collaboration Meeting - June 18-20, 2003.
7. Team Project Schedules September 22, 2004 Wayne Dyksen Brian Loomis Department of Computer Science and Engineering Michigan State University Fall 2004.
Version Control with git. Version Control Version control is a system that records changes to a file or set of files over time so that you can recall.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Administration Tab CiviCRM. Data Organization in CiviCRM: "Building Blocks" Contacts Reports Mail Tags Activities Contribe Member Events and Event Attendences.
Workshop Report Berryman - Carcassi - Kasmir - Shroff.
A primer on version control at OTN
Google Classroom.
VendorVision Lender and Agent Module New Release Features June 9, 2015 H. Balogh, G. Gabe Confidential.
Created by: Maria Abrahms Modified Date: Classification: How to get it done Contributing to OpenStack.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Version control Using Git Version control, using Git1.
Information Systems and Network Engineering Laboratory II DR. KEN COSH WEEK 1.
Gnizr-feed University of Maryland, Baltimore County CMSC 691S/491S Paul Swenson Alice Carback.
Welcome to Student News 1:00 – 1:50 (call in 12:45) Please MUTE your microphones! Make sure your K20 contact registers your district for the next month’s.
0 eCPIC User Training: Resource Library These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
Team 708 – Hardwired Fusion Created by Nam Tran 2014.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS Jan Control System Studio, CSS Overview.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Subject Blogs Training session – Overview of social in SQA and resources available – What are the blogs for? – Content Planning – Content Development.
DevelopersCommitters Users I’m getting the following exception…. Anybody have any clue why??? +1, I like that idea… Source & Binary Code Repository Bug.
OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.
5-Oct-051 Tango collaboration status ICALEPCS 2005 Geneva (October 2005)
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS 2012, January 9-12 at NSRRC, Taiwan Control System Studio Training.
Anubha Gupta | Software Engineer Visual Studio Online Microsoft Corp. Visual Studio Enterprise Leveraging modern tools to streamline Build and Release.
GRIN-Global Public Interface Presentation to the TSG Wednesday, August 12, 2009.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS April 2013 Control System Studio, CSS Overview.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
1 Crosstalk iON Release 3. 2 New Live Chat Features iON 3  Session Notes –Add and modify notes to a customer session –Review from Chat History or Live.
TEAM FOUNDATION VERSION CONTROL AN OVERVIEW AND WALKTHROUGH By: Michael Mallar.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
CSS Synoptic Display Comments Kay Kasemir, July 2009.
Information Systems and Network Engineering Laboratory I DR. KEN COSH WEEK 1.
Introduction to Git - Chirag Dani. Objectives Basics of Git Understanding different “Mindset of Git” Demo - Git with Visual Studio.
Fab25 User Training Cerium Labs LabCollector - LIMS Lynette Ballast.
Office of Administration Enterprise Server Farm November 2004 Briefing.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Virtual Lab Overview 5/21/2015 xxxxxxxxxx NWS/MDL/CIRA.
Repository Manager 1.3 Product Overview Name Title Date.
Review for Eclipse Release Review | © 2012 by Review for Eclipse Committers, made available under the EPL v1.0 1 Review for Eclipse (R4E) 0.11 Release.
© Trustees of Indiana University Released under Creative Commons 3.0 unported license; license terms on last slide. Take Group Projects to the Next Level.
Using Git with collaboration, code review, and code management for open source and private projects. & Using Terminal to create, and push commits to repositories.
CS520 Web Programming Version Control with Subversion Chengyu Sun California State University, Los Angeles.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Initiating UK OOI CI Project 7 th /8 th March 2011.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Version Control Systems
CS5220 Advanced Topics in Web Programming Version Control with Git
Information Systems and Network Engineering Laboratory II
Proposed IT Infrastructure for TOP OS project
Version Control.
Version control, using Git
Getting Started as an EdgeX Developer
CS5220 Advanced Topics in Web Programming Version Control with Git
Version Control Systems
Converter for Azure and SharePoint Converts s into SharePoint list items 24/7 Creates SharePoint list items from s
Converter for IIS and SharePoint Converts s into SharePoint list items 24/7 Creates SharePoint list items from s
GitHub and Git.
PyWBEM Python WBEM Client: Overview #2
EStarkState welcomes you to ANGEL Training!.
Presentation transcript:

This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan and Michigan State University. Michigan State University designs and establishes FRIB as a DOE Office of Science National User Facility in support of the mission of the Office of Nuclear Physics. Eric Berryman Controls Engineer CS-Studio Collaboration Status

Overview E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 2  Collaboration Statistics Feedback from Issues 4.2.x Issues Comments Activity Issues Activity Milestone Activity  Milestones Status 4.2.x (testing->stable) 4.3.x (unstable->testing)

Feedback from Issues E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 3

4.2.x Issues E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 4

Comments Activity E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 5

Issues Activity E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 6

Milestone Activity E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 7

 4.2.x due date end of this month Standalone BOY windows (merged from Diamond) BOY windows are all “Views”, allowing utilization of Eclipse Perspectives Diirt 3 Eclipse 4.5 CS-Studio template product Closing 4.2.x (testing to stable) E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 8

Standalone BOY Windows E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 9

Eclipse Perspectives E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 10

Eclipse Perspectives E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 11

Diirt E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 12

Eclipse 4.5 E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 13  Customize Perspective Dialog  UI responsiveness monitoring. Enabled, will put information about UI freezes, for example code that accesses files on the UI thread, into the log, so we can then fix frequent problems  SWT on Linux can use GTK+ 3 (GTK 2 is also still supported)  Mac OS X products are proper *.app

Template Product E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 14  A template product on github  Edit features for your product repository/cs-studio-template.product  Change icons if you like repository/icons  Add your site specific configurations features/org.csstudio.template.product.configuration.feature/ rootfiles/configuration/  All binaries come from our P2 repository Update the maven pom.xml file to change the update site to new versions

Still Keeping Clean E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 15

 Have not had 4.3.x project meeting yet, which will be following the Management Review meeting  4.3.x due date latest June, projects at the present Simplify users ability to save, load, share, distribute perspectives New Display Builder prototype available for testing Save set restore UI, interface to work with git and MASAR 4.3.x (testing) E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 16

 Following as a guideline to improve quality »Management Review »Quality Policy and Objectives »Process Performance and Product Conformity »Status of Corrective and Preventative Actions »Customer Feedback Analysis »Decisions and Actions for improvements »Resource needs ISO 9001 Quality Standard E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 17 Customers Requirements Customers Satisfaction Resource Management Measurement, Analysis and Improvement Product Realization Management Responsibility Product information activities Continual Improvement of the Quality System taken from ISO 9001

 Sites that have given a name and contact as “Site Representative” CSIRO CSNS DESY Diamond European Spallation Source (ESS)* Facility for Rare Isotope Beams (FRIB) at MSU GANIL/Spiral2 ISIS ITER National Synchrotron Light Source II (NSLSII) at BNL Spallation Neutron Source (ORNL) Registered Sites E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 18

Website Statistics E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 19

Website Statistics E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 20

How to Contribute E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 21  Fork us Github  Pick an issue/feature or make one  Create a branch in your fork with the fix or feature  Make a Pull Request with the issue number in the title  Attend meetings, know the release schedule, subscribe to mailing list

Development Process E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 22 Amazon S3 Jenkins Github Product Build Pull Request (must reference issue ticket) Feature Owner Reviews Commits as Needed

Development Process E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 23

Development Process E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 24

Attend Meetings E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 25  We use Google Hangouts to share our progress and discuss issues Follow us on Google Plus Meetings are posted (viewable after being added to group) First Wednesday of the month (9am EST) Project group meet once a week when actively developing

Feedback from Issues E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 26

Feedback from Issues E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 27

Feedback from Issues E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 28

Feedback from Issues E. Berryman, October 2015 EPICS Collaboration Meeting, Slide 29