Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?

Slides:



Advertisements
Similar presentations
Strecher, compressor and time structure manipulation
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
AREAL Laser overview Advanced Research Electron Accelerator Laboratory Aghasi Lorsabyan.
LEReC Laser Controls & RF Requirements Brian Sheehy 10/31/13 Laser timing Laser design RF and Control Needs.
Output to accelerator area drive laser: MHz, sync’d to master RF = 1064 nm ~7 ps pulses ~10 watts average (~120 nJ/pulse) chopper wheel: ~100Hz,
Philippe Hering October 30, 2007 Drive Laser Commissioning Results and Plans 1 Drive Laser Commissioning results and plans Philippe.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Bunch Length Measurements at the Swiss Light Source (SLS) Linac at the PSI using Electro-Optical Sampling A.Winter, Aachen University and DESY Miniworkshop.
Bill White Lasers and Ultra-precise October 29, Lasers and Ultra-precise Timing Injector Laser and Commissioning.
1 Injector Lasers Overview Sasha Gilevich, SLAC April 29, 2004 Drive Laser Specifications Challenges System Description Laser Procurement R&D Effort UV.
Dave Dowell, Sasha GilevichFacilities Advisory Committee October Injector Drive Laser Update Injector Drive Laser Update.
C.Limborg-Deprey ERL Workshop, Jefferson March 20th 2005 Optimum electron distribution for space charge dominated beams.
Sasha GilevichFacilities Advisory Committee October Injector Drive Laser Update 1 Facilities Advisory Committee Meeting.
Bill White Laser Installation and April 20, Laser Installation and Commissioning April 20, 2006 Procedures.
Bill White Drive Laser April 16, Drive Laser Commissioning Experience Reminder of requirements on Drive Laser.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Sasha GilevichFacilities Advisory Committee April Injector Drive Laser Update Facilities Advisory Committee Meeting April.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
Simulation studies of the e-beams for Renkai Li and Juhao Wu 5/20/2014 ALD Review.
Recent developments for the LCLS injector Feng Zhou SLAC Other contributors: Brachmann, Decker, Ding, Emma, Gilevich, Huang, Iverson, Loos, Raubenheimer,
F Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
30. Nov I.Will, G. Klemz, Max Born Institute: Optical sampling system Optical sampling system for detailed measurement of the longitudinal pulse.
DMP Product Portfolio Femtosecond Lasers Trestles Ti:Sapphire lasers …… fs; nm, mW Mavericks Cr:Forsterite lasers
The UCLA PEGASUS Plane-Wave Transformer Photoinjector G. Travish, G. Andonian, P. Frigola, S. Reiche, J. Rosenzweig, and S. Telfer UCLA Department of Physics.
Laser beam parameter measurements at PITZ J.Bähr Workshop on Laser Pulse Shaping DESY,Zeuthen, November 30, 2006.
Low Emittance RF Gun Developments for PAL-XFEL
C. Vicario LCLS ICW SLAC Oct. 9-11, THE DRIVE LASER: EXPERIENCE AT SPARC Carlo Vicario for SPARC collaboration.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Laser Status Update J. Moody, E. Oz, P. Muggli MPP Future Accelerators AWAKE Collaboration
Ultra-stable flashlamp-pumped laser A.Brachmann, J.Clendenin, T.Galetto, T.Maruyama, J.Sodja, J.Turner, M.Woods.
Laser Notcher Demonstration Experiment Dave Johnson, Todd Johnson, Matt Gardner. Rick Tesarek, Vic Sacrpine.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Brian Sheehy Laser and Timing.
Schematic of Laser Transport Vacuum enclosure Laser Room Interlocked, controlled area Laser Wall Periscope in vacuum enclosure Cathode Fiduciary Beam line.
Workshop for advanced THz and Compton X-ray generation
Laser system at PITZ J.Bähr LCLS Injector Commissioning Workshop SLAC, October 9-11, 2006.
Drive Laser Introduction ‘ir’ master oscillator power amplifier chain (MOPA) uses standard chirped pulse amplification scheme (CPA) third harmonic generation.
February 17-18, 2010 R&D ERL Brian Sheehy R&D ERL Laser and laser light transport Brian Sheehy February 17-18, 2010 Laser and Laser Light Transport.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Agenda General Information Project Status Transport Tubes Design.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
Sasha GilevichDrive Laser Meeting December Launch System Outline General Layout Incidence Angle Effect of the broad bandwidth.
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
NLCTA Facility Capabilities E. R. Colby 5/18/09. NLCTA Overview RF PhotoInjector Ti:Sapphire Laser System Next Linear Collider Test Accelerator Cl. 10,000.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
LASER SYSTEM STATUS G.Gatti, A. Ghigo, C.Vicario, P.Musumeci, M. Petrarca, S. Cialdi, D. Filippetto REVIEW COMMITTEE 16/11/05.
Status of the SPARC laser and “dazzler” experiments
LASER SAFETY External EHS Expert Panel Workshop
Summary of SPARC first-phase operations
Drive-Laser Commissioning Status and Plans
E- source R&D update ILC source laser project Faraday rotation experiment A. Brachmann 05/07/07 SLAC R&D meeting.
Drive laser specifications:
Application of a Streak camera at PITZ
DESIGN AND FIRST EXPERIENCE WITH THE FERMI SEED LASER
LCLS Gun Commissioning Status & Plans David H
Magnetized Electron Beam for Ion Cooling at JLEIC
Injector: What is needed to improve the beam quality?
Advanced Research Electron Accelerator Laboratory
LASER SYSTEM STATUS G.Gatti , A. Ghigo , C.Vicario , P.Musumeci ,
Drive Laser Facility Layout Drive Laser Architecture Technical Issues
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Drive laser specifications:
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Drive Laser Commissioning Status
LCLS Injector Laser System Paul R. Bolton, SLAC April 24, 2002
LCLS Injector System Overview D. H
Injector Drive Laser Update
Injector Drive Laser Technical Status
Presentation transcript:

Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today? Laser Acceptance Status Laser Commissioning UV on cathode – Injector Commissioning

Bill White Commissioning October 9, 2006 Gun Design for Normal Incidence Layout of Laser from Injection Mirror to Cathode laser injection cross vacuum valve cathode gun solenoid drawing compliments of R.F. Boyce & T. Osier

Bill White Commissioning October 9, 2006 UV pulse goals rise and fall times < 1 ps flat-top, < 8% peak-to peak IR to UV conversion efficiency > 10 %, 2.5 mJ 255 nm nm, < 2% energy stability 120 Hz, MTBF > 5000 hours Spatial Profile FWHM = 1.2 – 3.0 mm Temporal Profile FWHM = 10 ps (5-20 ps)

Bill White Commissioning October 9, 2006 Laser Beam Specifications on the Cathode ParameterNominal SpecTolerance Central Wavelength255nm Pulse Energy>0.4mJ Continuously adjustable <2% RMS variation (shot-to-shot) Spatial Fluence ProfileUniform (adjustable)<20% (peak-to-peak) Spot RadiusAdjustable from 0.6mm to 1.5mm<4% (Shot-to-shot) Centroid Position Stability<10% radius (RMS) Repetition Rate120Hz, 60Hz, 30Hz, 10Hz, 1Hz Temporal Power ProfileUniform (adjustable) Slope adjustable from -10% to +20% <8% peak-to-peak on the plateau Profile FWHM10 psec (adjustable to from 5 to 20 psec) < 2 % RMS (over multiple shots) Profile Rise/Fall time1.0ps (10% to 90%) Timing Jitter< 0.5 psec (shot-to-shot)with respect to the external RF source

Bill White Commissioning October 9, 2006

Bill White Commissioning October 9, 2006 Challenges Temporal Shape UV conversion Spatial Shape 120 Hz Synchronization Reliability Characterization Transport Hardest Not part of Thales contract

Bill White Commissioning October 9, 2006 Spatial Beam Shaping – Newport Shaper Converts Gaussian beam input to flat top output High energy conversion - accepts 99.7% of input energy High profile uniformity - 78% of input power is directed into the flat top with 15% RMS power variation Collimated output beam allows use of conventional optics after beam shaping Provides performance over large wavelength ranges GBS-UV H

Bill White Commissioning October 9, 2006 Testing of the Newport Shaper Image of the aperture after the shaper Input beam Courtesy of John Castro

Bill White Commissioning October 9, 2006 Transport

Bill White Commissioning October 9, 2006 Layout Beam shaper Vacuum cell Zoom Transport tube Table in the tunnel Photocathode Virtual Cathode Steering system Active Steering Stabilization F1=200 F2=120 F3=-150 F4=F5=5000 F6=1500 L1 L2 L3 L4 L5 L6 Waveplate Polarizer Powermeter Camera Shutter

Bill White Commissioning October 9, 2006 Active Steering Stabilization In order to meet centroid position stability requirement (min 60μm) M6 should be stabilized with 35μrad accuracy Sensitivity of the mirror mount 7arcsec – 34 μrad Camera From Virtual Cathode To Photocathode Laser Bay Transport Tube Table in the tunnel Steering Stabilization has been working on test bench M6 M5 M4 M3 M2 C2 C1

Bill White Commissioning October 9, 2006 Beam Profile on the Cathode ZEMAX Modeling Side - 4mm Beam Radius = 1.56mm Bandwidth 3nm

Bill White Commissioning October 9, 2006 Integration High Speed Driver Pockels Cell Laser Pulses 120HZ Beam Dump To Cathode High Voltage Supply Energy Control Laser Trigger (120 Hz) PPS MPS MCC

Bill White Commissioning October 9, 2006 Where are we now? - Recent Milestones July 14 – Laser Tables Installed

Bill White Commissioning October 9, 2006 Where are we now? - Recent Milestones July 21 – Laser Arrives at Sector 20

Bill White Commissioning October 9, 2006 Where are we now? - Recent Milestones July 24 – Complete system on table

Bill White Commissioning October 9, 2006 Where are we now? - Today Laser Work Complete LSS Move laser supplies into rack Setup streak camera Setup cross-correlator Setup UV-FROG Setup spatial diagnostics

Bill White Commissioning October 9, 2006 Where are we now? - Today Streak Camera installed and working

Bill White Commissioning October 9, 2006 Where are we now? - Today Cross-Correlator working

Bill White Commissioning October 9, 2006 Where are we now? - Today TG-FROG working

Bill White Commissioning October 9, 2006 Today Thales working on pulse shape

Bill White Commissioning October 9, 2006 What's Next - Laser Commissioning LSC Review of Final SOP Oct. 10. Thales engineer here for next 2 weeks for temporal shaping Installation of spatial shaping and transport to begin mid-Oct Laser table and LSS in Vault end-Nov. UV in Vault Virtual cathode work requires GTL. UV on cathode two weeks after virtual cathode Laser optimization (temporal profile, stability, etc) will continue until GTL is installed.

Bill White Commissioning October 9, 2006 Vault Layout

Bill White Commissioning October 9, 2006 Vault Layout

Bill White Commissioning October 9, 2006 Layout - Injector Vault M5 L5 M4 L6M3 M2 VC Power Meter Cathode M1 C1 C2

Bill White Commissioning October 9, 2006 End