1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.

Slides:



Advertisements
Similar presentations
Jason Howard. Agenda I. How to download robotc II. What is tele-op used for? III. How to build a basic tele-op program IV. Getting the robot to drive.
Advertisements

IMS Client Installation Procedures 1. Copy the Voic Pro from the shared folder on the Voic Pro server. Go to Start, Run, and \\ or \\
Installing SAS 9.3 Raymond R. Balise Health Research and Policy.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 8: Implementing and Managing Printers.
Asynchronous Solution Appendix Eleven. Training Manual Asynchronous Solution August 26, 2005 Inventory # A11-2 Chapter Overview In this chapter,
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 8: Implementing and Managing Printers.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 8: Implementing and Managing Printers.
With experience you can develop the skills needed to clean and maintain your computer, and diagnose and resolve basic problems that may occur when using.
Choose & Book Common Issues Identified. Problems with Choose and Book 2 Slow Performance 3 Strange Behaviours 1 Does not Run.
PVSS Installation of a Project Need to run this by Xiaofeng to make sure the steps are right.
A walkthrough of the SageQuest Mobile Control Online & ESC integration.
Microsoft Windows 2003 Server. Client/Server Environment Many client computers connect to a server.
CAL DQM SHIFT TODO and RELATED MATERIAL T. Schörner-Sadenius Hamburg University CAL Meeting, 13 October 2004.
© 2009 FP Mailing Solutions. All rights reserved. Customer Service Training Basic Computer Training.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
MDT PS DCS for ATLAS Eleni Mountricha
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (written by Michela) HV part updated by Oleg Maev 4-November-09.
PSEN Server Balance EN/ICE Procedures Jean-Charles Tournier EN/ICE/SCD 09-September-2015.
Client – Server Application Can you create a client server application: The server will be running as a service: does not have a GUI The server will run.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
22 October 20151/23Fabio Vinagre -- TileCal DCS TileCal DCS Expert tutorial - DCS 22 October 2015.
Problems with Muon System N. Bondar O.Maev
Diagnostic Pathfinder for Instructors. Diagnostic Pathfinder Local File vs. Database Normal operations Expert operations Admin operations.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Sep. 18th 2006 Stefan Koestner Installation Guide ECS-tools for the CCPC/Tell1 (Installation): Many problems/user- requests already arises when installing.
Go to your school’s web locker site Your user name is the first letter of your first name, the first four letters of.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
PHOS DCS guide (for PVSS based products only) Alexander Mamonov Last update: 1 th October, 2010.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
ALICE Use of CMF (CC) for the installation of OS and basic S/W OPC servers and other special S/W installed and configured by hand PVSS project provided.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Status of Farm Monitor and Control CERN, February 24, 2005 Gianluca Peco, INFN Bologna.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
March 7th 2005 Stefan Koestner LHCb week ECS-tools for the CCPC/Tell1 (Installation): Many problems/user- requests already arises when installing the framework.
1 Day 2 Logging in, Passwords, Man, talk, write. 2 Logging in Unix is a multi user system –Many people can be using it at the same time. –Connections.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
Muon Piquet Training V.0 W Baldini, E.Furfaro, O. Maev June 11-th 2015.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
UF/PNPI POWER SUPPLY SOFTWARE By Magnus Hov Lieng
HV-system Oleg Maev 1. Brief overview of HV-systems Muon chambers circuits 2. States of HV according LHC/LHCb conditions 3. Useful practical applications/knowleges/tools.
LV & HV Updates Vasileios Martos. Start / Stop GapsCheck Script Instead of using Browser or the Console Manager to Start/Stop The Script.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
Windows Server 2003 { First Steps and Administration} Benedikt Riedel MCSE + Messaging
Muon Shifter Start Manual – July 08 1 The (im)Perfect Muon Shifter.
CACI Proprietary Information | Date 1 Upgrading to webMethods Product Suite Name: Semarria Rosemond Title: Systems Analyst, Lead Date: December 8,
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
HP Indigo Sales & Marketing Suitcase Overview and setup
beas group AG Beas sql guide Martin Heigl CTO
Development Environment
beas group AG Beas Hana installation Martin Heigl CTO
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
ATLAS MDT HV – LV Detector Control System (DCS)
Fix Xbox One Error 0x803f8001 Call
GTS WebSocket General Guide
First Level Incident Handling FAQ (For EAL)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the instructions (written by Michela Lenzi) in the Muon Twiki page : ssioningHrdw ssioningHrdw to have everything in ppt format

2 LV control For any problem: contact M. Lenzi/G.Passaleva To control LV you should: Log on into lbts.cern.ch PC (online interface to the rest of the world) From lbts you make a remote desktop connection to computer UI01 On UI01 you should look into 'MyComputer' going trough G: -> online -> ecs -> muon -> Shortcuts Then you click on the shortcut of the pvss project you need (LV side A or C, depending on what you want to do).

3 LV control PVSS project Developer: M. Lenzi To start/stop pvss project please read the instructions at The PVSS project has its FSM and to control anything you need, first of all, to 'take' privileges.... Then you can navigate the panels trough the Quadrant and stations that you need to work on.

4 Maraton issues Experts: M. Lenzi, P. Ciambrone. For any hardware problem please contact P.Ciambrone. Sometimes the Maraton goes into a funny state: it shows errors that are unlikely to be real hardware failures. In those cases you should carefully check : - that the OPC server is running correctly and the RCM is talking communicating correctly - that the communication btw the RCM and the Maraton is correct OPC server restart can be done only with administrator privileges (ask M. Lenzi) To exit from real funny situation the following chain of actions has proved to help: turn off PVSS and OPC server Reboot RCM crate Restart PVSS and OPC server Poer cycle the Maraton After each step you need to check that the communication is going as expected. Latest maraton known problem: last november! Since then everything is running smoothly.

5 How to start/stop pvss projects for HV, LV and Tell1 All the projects have been configured as services, so that they will start automatically (included the FSM) after a reboot of the machine. If you want to start/stop manually: (N.B. all projects run as muon_oper and all the muon group has the permissions to start/stop projects, so you can do from your account, you don't need to use my account) for windows projects (MULVA01, MULVC01, MUHVA02, MUHVC02): 1) login using your account on the machine where the project runs 2) open the service+ tool panel 3) - to start the project: start the service ProjectName (e.g. MUHVA02) - to stop the project: start the service ProjectName-Stop (e.g. MUHVA02- Stop). Please, do not stop the project by stopping the service ProjectName (use ProjectName-Stop to stop it cleanly). 4) log off from the machine and take the control of the project using the shortcut to the project from the machine UI01

6 New instructions to start/stop pvss projects for HV, LV and Tell1 for linux projects (MUDAQL1): 1) login using your account on the machine where the project runs 2) to start the project: type the command sudo /sbin/service pvss_mp start - to stop the project: type the command sudo /sbin/service pvss_mp stop 3) log off from the machine and take the control of the project using the shortcut to the project from the machine UI01 for linux HV PNPI projects (MUHVA01, MUHVC01): a special script has to be used to start/stop the PNPI system, included the hvcard driver and Dim server: 1) login using your account on the machine where the project runs and go in the directory /localhost/pvss 2) to start: execute the script./startPNPI to start the hostcard driver, the dim server and the pvss project or execute the script./startDimPVSS to start only dim server and pvss project. - wait and be patience for a few minutes until you get the message "PNPI system initialization finished" - to stop: execute the script./stopPNPI to stop the hostcard driver, the dim server and the pvss project or execute the script./stopDimPVSS to stop only dim server and pvss project. 3) log off from the machine and take the control of the project from UI01 see and for more detailed instructions.

7 Computers for control of LV, HV, Temp & Press Item/Stat/sideItem/Stat/side PCName SystemNumber SystemName ProjectNamePCNameSystemNumberSystemNameProjectName T&P MUDCS01w 270 MUDCSSEN MUDCSSEN LV/C MULVC01w 210 MUDCSLVC MUDCSLVC LV/A MULVA01w 211 MUDCSLVA MUDCSLVA HV/C MUHVC MUHVC01 MUHVC01 HV/C MUHVC02w 213 MUHVC02 MUHVC02 HV/A MUHVA MUHVA01 MUHVA01 HV/A MUHVA02w 215 MUHVA02 MUHVA02 The shortcuts that should be used can be found under : g:\\online\ecs\shortcuts\MUON

8 UF/PNPI system operation (M. Lenzi) Four recipes have been stored in the Configuration DB and can be applied sending FSM commands: Go_STANDBY1, Go_STANDBY2, Go_READY, Reset: COMMANDV0Set (RDB) (V) V0Set (Master) (V) Go_STANDBY Go_STANDBY Go_READY Reset00 Ramp Up = 3V/s Ramp Dw = 50V/s Trip time = 1s I0Set: - 200uA (master channels) - 1uA (gap channels) - 3uA (4 gaps channels) Contact me if you want to change these settings!

9 1.Login on UI01 (windows) machine in the LHCb online cluster 2.Go to folder G:\online\ecs\Shortcuts\MUON and click on MUHVC01_UI_FSM The panel in Figure will appear 3.Right-click on MUONPC_HV First instructions to start learning how to operate the UF/PNPI system using PVSS project:

10 Note: red locks mean that somebody else has the control: you can monitor the status but you cannot operate the system Please remember to release the control (ReleaseAll) when you don’t need it anymore 4. Take the control of the project

11 5. Switch on masters with the command Go_STANDBY1 For experts only (please contact me before using)

12 Master operational panel:

13 6. wait until the state of PNPI_MASTERS is STANDBY1 7. send the command Go_STANDBY1 to one quadrant, e.g. Q3

14 Quadrant monitoring panel:

15 Station monitoring panel:

16 8. Wait until the state of Quadrant Q3 is STANDBY1

17 9. Send the command Go_STANDBY1 to the next quadrant, e.g. Q4:

Wait until Q4 is in state STANDBY1 11. Repeat the procedure from step 5 to step 10 for the commands Go_STANDBY2 and then Go_READY

19 Region monitoring panel:

20 Chamber monitoring panel: Vmon and IMon are stored in PVSS archive DB

21 General remarks: - Operate the system from UI01 machine: do not login on muhvc01 machine, do not start pvss, dim server, dns, etc. from your account - Remember to release the control of the project before leaving - Be patient: when you send a command, wait until the command has been executed (and the FSM states have changed accordingly) before sending further commands - If you want to do more sophisticated operations, i.e. change recipe settings, change archive DB settings, run auto-detection procedure for masters, save/load master Id from Configuration DB, etc. please ask me: do not try to do it by yourself before learning how to do it. - If you see some problems please contact me so that I can investigate immediately (it is hard to reproduce and understand a problem the day after..)

22 Switch On/Off all boards - If you are not able to switch on channels, most of the times is because the boards are off (solution: click on “Switch on all modules”)

23 HV control (CAEN) CAEN & PNPI controls will be unified in a single control structure. Michela is working on this and will update the instruction file when this integration will be completed.

24 Contact persons : - Michela Lenzi Tel Giovanni Passaleva Tel