Nuclear Engineering Department Massachusetts Institute of Technology M artian S urface R eactor Group Martian Surface Reactor Group December 3, 2004.

Slides:



Advertisements
Similar presentations
A2 Physics - L.O. Jones 2007 – Information gathered from Wikipedia Critical Mass.
Advertisements

NE Introduction to Nuclear Science Spring 2012
Lesson 17 HEAT GENERATION
First Wall Heat Loads Mike Ulrickson November 15, 2014.
HVAC System Design PES Institute of Technology. Objective Goal: To develop an automotive air-conditioning system that is smaller and lighter than with.
Chapter 2: Overall Heat Transfer Coefficient
Solar Orbiter EUS: Thermal Design Considerations Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Considerations.
Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 11/14/2004 Slide 1 CORE.
February 1, 2005HYPERION ERAU 1 Thermal Analysis of a Radiation Shield for Antimatter Rocketry Concepts Jon Webb Embry Riddle Aeronautical University.
ENERGY RENEWABLE ENERGY- Inexhaustible source of energy. Ex-solar, Hydro, Wind, Tidal& Geothermal NON-RENEWABLE ENERGY-Exhaustible with time. Ex- Fossil.
Final Design Presentation. Vasek Dostal Knut Gezelius Jack Horng John Koser Joe Palaia Eugene Shwageraus And Pete Yarsky With the Help of Kalina.
Survey of Space Nuclear Power Options. Dr. Andrew Kadak And Peter Yarsky MIT
Heat Transfer Overview
1 Aerospace Thermal Analysis Overview G. Nacouzi ME 155B.
A Comparison of Nuclear Thermal to Nuclear Electric Propulsion for Interplanetary Missions Mike Osenar Mentor: LtCol Lawrence.
Power of the Sun. Conditions at the Sun’s core are extreme –temperature is 15.6 million Kelvin –pressure is 250 billion atmospheres The Sun’s energy out.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Extrapolating Experimental Results for Model Divertor.
POWER PLANT.
Heat Pipes Heat Exchangers P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Heat Exchange through Another Natural Action….
© 2011 Autodesk Freely licensed for use by educational institutions. Reuse and changes require a note indicating that content has been modified from the.
Nuclear Reactors Chapter 4
Development of the FW Mobile Tiles Concept Mohamed Sawan, Edward Marriott, Carol Aplin University of Wisconsin-Madison Lance Snead Oak Ridge National Laboratory.
Deduction of Fundamental Laws for Heat Exchangers P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Modification of Basic Laws for.
Nuclear Engineering Department Massachusetts Institute of Technology M artian S urface R eactor Group Martian Surface Reactor Group December 3, 2004.
Nuclear Fundamentals Part II Harnessing the Power of the Atom.
Reading Qs 1.List the different reasons why these nuclear accidents occurred. 2.Select the one that interests you the most and explain why.
Solar Energy Systems in the Eco-Village at the University of Manitoba
Steam Condenser II Prof. Osama El Masry
Thermal hydraulic analysis of ALFRED by RELAP5 code & by SIMMER code G. Barone, N. Forgione, A. Pesetti, R. Lo Frano CIRTEN Consorzio Interuniversitario.
Thermal Hydraulic Simulation of a SuperCritical-Water-Cooled Reactor Core Using Flownex F.A.Mngomezulu, P.G.Rousseau, V.Naicker School of Mechanical and.
Nuclear and Radiation Physics, BAU, 1 st Semester, (Saed Dababneh). 1 Nuclear Fission Q for 235 U + n  236 U is MeV. Table 13.1 in Krane:
Why are you trying so hard to fit in, when you were born to stand out?
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Heating Systems.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
Chapter 4. Power From Fission 1.Introduction 2.Characteristics of Fission 3. General Features 4. Commercial Reactors 5. Nuclear Reactor Safety 6. Nuclear.
Nuclear Engineering Department Massachusetts Institute of Technology L unar S urface R eactor Group Progress Report 2 Decisions and Models Lunar Surface.
GAMMA BEAM DUMP AND COLLIMATOR A.Mikhailichenko Cornell University, LEPP, Ithaca, NY Presented at Positron Source Meeting Daresbury Laboratory UK,
One-Dimensional Steady-State Conduction
Nuclear Engineering Department Massachusetts Institute of Technology M artian S urface R eactor Group Martian Surface Reactor Group December 3, 2004.
Alpha and Beta Interactions
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
FAST MOLTEN SALT REACTOR –TRANSMUTER FOR CLOSING NUCLEAR FUEL CYCLE ON MINOR ACTINIDES A.Dudnikov, P.Alekseev, S.Subbotin.
Convection: Internal Flow ( )
Nuclear Engineering Department Massachusetts Institute of Technology M artian S urface R eactor Group Nuclear Reactors for The Moon and Mars Tyler Ellis.
By Kasey Poirier, Eean Albro, Chase Lee
DCLL ½ port Test Blanket Module thermal-hydraulic analysis Presented by P. Calderoni March 3, 2004 UCLA.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
C.KotnigFCC Design Meeting FCC Beam Screen cooling Claudio Kotnig.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Temperature and Heat Temperature & Scales Thermometry Thermal Expansion Heat and Internal Energy Heat Transfer Heat and Temperature Change, Specific.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski, B. H. Mills and M. D. Hageman G. W. Woodruff School of Mechanical Engineering Correlations for Divertor Thermal-Hydraulic.
Double Pipe HEAT EXCHANGERS with Low Thermal Resistance P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Ideas for Creation of Isotropically.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
ERMSAR 2012, Cologne March 21 – 23, 2012 Post-test calculations of CERES experiments using ASTEC code Lajos Tarczal 1, Gabor Lajtha 2 1 Paks Nuclear Power.
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
CIBSE HCNW 28 August 2014 Modular boilers. Traditional or low-tech replacement boiler installation; Multiple boilers eg 2 no 66% of load for security.
25.3 Fission and Fusion > 1 Copyright © Pearson Education, Inc., or its affiliates. All Rights Reserved. Chapter 25 Nuclear Chemistry 25.1 Nuclear Radiation.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
1 Radiation Environment at Final Optics of HAPL Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI HAPL Meeting ORNL March.
ADSR Workshop, May ‘08 ADSR Systems for Power Generation: some practical considerations Bob Cywinski 7 May 2008, Daresbury.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
COLLEGE OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING MENB INTRODUCTION TO NUCLEAR ENGINEERING GROUP ASSIGNMENT GROUP MEMBERS: MOHD DZAFIR.
Martian Surface Reactor Group December 3, 2004
Electron Beam Welding Welding Technology/4.3 Electron Beam Welding.
Analysis of Reactivity Insertion Accidents for the NIST Research Reactor Before and After Fuel Conversion J.S. Baek, A. Cuadra, L-Y. Cheng, A.L. Hanson,
Space Based Nuclear Power
Team A Propulsion 1/16/01.
TRANSPORTATION CASK AND CONCRETE MODULE DESIGN FOR MANAGING NUCLEAR SPENT FUEL PRODUCED IN BUSHEHR NUCLEAR POWER PLANT A.M. TAHERIAN Iran Radioactive Waste.
Presentation transcript:

Nuclear Engineering Department Massachusetts Institute of Technology M artian S urface R eactor Group Martian Surface Reactor Group December 3, 2004

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 2 OVERVIEW Mission Statement Project Organization Goals Project Description Description and Analysis of the MSR Systems –Core –Power Conversion Unit (PCU) –Radiator –Shielding Total Mass Analysis Conclusion

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 3 MSR Mission Statement Nuclear Power for the Martian Surface –Test on Lunar Surface Design Criteria –100kWe –5 EFPY –Works on the Moon and Mars

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 4 Decision Goals Litmus Test –Works on Moon and Mars –100 kWe –5 EFPY –Obeys Environmental Regulations Extent-To-Which Test –Small Mass and Size –Controllable –Launchable/Accident Safe –High Reliability and Limited Maintenance –Scalability

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 5 MSR System Overview Core (54%) –Fast, UN, Zr 3 Si 2 reflector, Hf vessel, Ta Poison Power Conversion Unit (17%) –Cs Thermionics, Heat Pipes, D-to-A Radiator (4%) –Heat Pipe/Fin, 950K Shielding (25%) –2 rem/hr, Neutron/Gamma Total Mass ~8MT

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 6 CORE

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 7 Core – Challenges Fit on one rocket Autonomous control for 5 EFPY High reliability Safe in worst-case accident scenario Provide 1.2 MW th

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 8 Core - Design Choices Overview

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 9 Heatpipe Fuel Pin Tricusp Material Core - Pin Geometry Fuel pins are the same size as the heat pipes and arranged in tricusp design. Temperature variation K

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 10 Core – Design Advantages UN fuel, Ta absorber, Re Clad/Structure performance at high temperatures, heat transfer, neutronics performance, and limited corrosion Heat pipes no pumps required, excellent heat transfer, reduce system mass Li working fluid operates at high temperatures necessary for power conversion unit

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 11 Core – Dimensions and Control Small core, total mass ~4.3 MT Reflector Core Fuel Pin Fuel Reflector 42 cm 89 cm 10 cm Reflector

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 12 Core – Isotopic Composition

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 13 Core - Power Peaking

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 14 Operation over Lifetime BOL k eff : – EOL k eff : – = = 0.055

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 15 Launch Accident Analysis Worst Case Scenario –Oceanic splashdown assuming Non-deformed core All heat pipes breached and flooded Large gap between BOL k eff and accident scenario Submerged water case: k eff > 1

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 16 Accident Scenario: Nat Hf Vessel Introduce poison vessel –High thermal cross-section –Low fast cross-section Core (24 cm) Reflector Segment (1 cm)

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 17 Launch Accident Results Reflectors StowedReflectors Detached WaterK eff =0.970K eff =0.953 Wet SandK eff =0.974K eff =0.965 Inadvertent criticality will not occur in conceivable splashdown scenarios

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 18 Core Summary UN fuel, Re clad/structure, Ta poison, Hf vessel, Zr 3 Si 2 reflector Relatively flat fuel pin temperature profile K 5+ EFPY at 1.2 MW th, ~100 kW e, Autonomous control by rotating drums over entire lifetime Subcritical for worst-case accident scenario

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 19 PCU

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 20 PCU – Mission Statement Goals: –Remove thermal energy from the core –Produce at least 100kWe –Deliver remaining thermal energy to the radiator –Convert electricity to a transmittable form Components: –Heat Removal from Core –Power Conversion/Transmission System –Heat Exchanger/Interface with Radiator

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 21 PCU – Design Choices Heat Transfer from Core –Heat Pipes Power Conversion System –Cesium Thermionics Power Transmission –DC-to-AC conversion –22 AWG Cu wire transmission bus Heat Exchanger to Radiator –Annular Heat Pipes Reactor

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 22 PCU – Heat Extraction from Core How Heat Pipes Work –Isothermal heat transfer –Capillary action –Self-contained system Heat Pipes from Core: –127 heat pipes –1 meter long –1 cm diameter –Niobium wall & wick –Pressurized Li working fluid, 1800K

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 23 PCU – Heat Pipes (2) Possible Limits to Flow –Entrainment –Sonic Limit –Boiling –Freezing –Capillary Capillary force limits flow:

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 24 PCU - Thermionics Thermionic Power Conversion Unit –Mass: 240 kg –Efficiency: 10%+ 1.2MWt -> 125kWe –Power density: 10W/cm 2 –Surface area per heat pipe: 100 cm 2

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 25 PCU - Thermionics Issues & Solutions –Creep at high temp Set spacing at 0.13 mm Used ceramic spacers –Cs -> Ba conversion due to fast neutron flux 0.01% conversion expected over lifetime –Collector back current T E = 1800K, T C = 950K

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 26 PCU – Thermionics Design

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 27 PCU – Power Transmission –D-to-A converter: 25 x 5kVA units 360kg total Small –Transmission Lines: AC transmission 25 x 22 AWG Cu wire bus 500kg/km total Transformers increase voltage to 10,000V –~1.4MT total for conversion/transmission system

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 28 PCU – Heat Exchanger to Radiator Heat Pipe Heat Exchanger

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 29 PCU – Failure Analysis Very robust system –Large design margins in all components –Failure of multiple parts still allows for ~90% power generation & full heat extraction from core No possibility of single-point failure –Each component has at least 25 separate, redundant pieces Maximum power loss due to one failure: 3% Maximum cooling loss due to one failure: 1%

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 30 Radiator

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 31 Objective Dissipate excess heat from a power plant located on the surface of the Moon or Mars.

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 32 Environment Moon –1/6 Earth gravity –No atmosphere –1360 W/m 2 solar flux Mars –1/3 Earth gravity –1% atmospheric pressure –590 W/m 2 solar flux

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 33 Radiator – Design Choices Evolved from previous designs for space fission systems: –SNAP-2/10A –SAFE-400 –SP-100 Radiates thermal energy into space via finned heat pipes

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 34 Concept Choices Heat pipes Continuous panel Carbon-Carbon composites One-sided operation

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 35 Component Design Heat pipes –Carbon-Carbon shell –Nb-1Zr wick –Potassium fluid Panel –Carbon-Carbon composite –SiC coating

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 36 Component Design (2) Supports –Titanium beams 8 radial beams 1 spreader bar per radial beam –3 rectangular strips form circles inside the cone

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 37 Structural Design Dimensions –Conical shell around the core –Height 3.34 m –Diameter 4.8 m –Area 41.5 m 2 Mass –Panel 360 kg –Heat pipes 155 kg –Supports 50 kg –Total 565 kg

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 38 Shielding

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 39 Radiation Interactions with Matter Charged Particles (α, β) –Easily attenuated –Will not get past core reflector Neutrons –Most biologically hazardous –Interacts with target nuclei –Low Z material needed Gamma Rays (Photons) –High Energy (2MeV) –Hardest to attenuate –Interacts with orbital electrons and nuclei –High Z materials needed

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 40 Shielding - Design Concept Natural dose rate on Moon & Mars is ~14 times higher than on Earth Goal: –Reduce dose rate due to reactor to between mrem/hr 2mrem/hr –ALARA Neutrons and gamma rays emitted, requiring two different modes of attenuation

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 41 Shielding - Constraints Weight limited by landing module (~2 MT) Temperature limited by material properties (1800K) Courtesy of Jet Propulsion Laboratory

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 42 Shielding - Design Choices Neutron shielding Gamma shielding boron carbide (B 4 C) shell (yellow) Tungsten (W) shell (gray) 40 cm12 cm Total mass is 1.97 MT Separate reactor from habitat –Dose rate decreases as 1/r 2 for r >> 50cm - For r ~ 50 cm, dose rate decreases as 1/r

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 43 Shielding - Dose w/o shielding Near core, dose rates can be very high Most important components are gamma and neutron radiation

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 44 Shielding - Neutrons MaterialReason for Rejection H2OH2OToo heavy LiToo reactive LiHMelting point of 953 K BBrittle; would not tolerate launch well B 4 CAlPossible; heavy, needs comparison w/ other options Boron Carbide (B 4 C) was chosen as the neutron shielding material after ruling out several options

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 45 Shielding - Neutrons (3) One disadvantage: Boron will be consumed over time

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 46 Shielding - Gammas MaterialReason for Rejection Z < 72 Too small density and/or mass attenuation coefficient Z > 83 Unstable nuclei Pb, Bi Not as good as tungsten, and have low melting points Re, Ir Difficult to obtain in large quantities Os Reactive Hf, Ta Smaller mass attenuation coefficients than alternatives Tungsten (W) was chosen as the gamma shielding material after ruing out several options

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 47 Shielding - Design Two pieces, each covering 40º of reactor radial surface Two layers: 40 cm B 4 C (yellow) on inside, 12 cm W (gray) outside Scalable –at 200 kW(e) mass is 2.19 metric tons –at 50 kW(e), mass is 1.78 metric tons

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 48 Shielding - Design (2) For mission parameters, pieces of shield will move –Moves once to align shield with habitat –May move again to protect crew who need to enter otherwise unshielded zones

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 49 Using a shadow shield requires implementation of exclusion zones: Unshielded Side: –32 rem/hr - 14 m –2.0 mrem/hr m –0.6 mrem/hr m Shielded Side: –32 rem/hr - inside shield –400 mrem/hr – at shield boundary –2.0 mrem/hr - 11 m –0.6 mrem/hr - 20 m Shielding - Design (3) core

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 50 Summary

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 51 MSR Assembly Sketches

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 52 MSR Assembly Sketches (2)

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 53 MSR Mass Bottom Line: ~82g/We

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 54 Mass Reduction and Power Gain Move reactor 2km away from people –Gain 500kg from extra transmission lines –Loose almost 2MT of shielding Use ISRU plant as a thermal sink –Gain potentially 900kWth –Gain mass of heat pipes to transport heat to ISRU (depends on the distance of reactor from plant) –Loose 515kg of Radiator Mass Bottom Line: ~63 g/We

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 55 MSR Mission Plan Build and Launch –Prove Technology on Earth Earth Orbit Testing –Ensure the system will function for ≥ 5EFPY Lunar / Martian Landing and Testing –Post Landing Diagnostics Startup Shutdown

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 56 MSR Group Expanding Frontiers with Nuclear Technology “The fascination generated by further exploration will inspire…and create a new generation of innovators and pioneers.” ~President George W. Bush

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 57 Additional Slides

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 58 Future Work – Core Investigate further the feasibility of plate fuel element design Optimize tricusp core configuration Examine long-term effects of high radiation environment on chosen materials

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 59 MSR Fuel Pin Sketch

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 60 MSR Core Top View

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide Hf Cross Section

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 62 Nat Hf Cross Section

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 63 PCU – Decision Methodology BraytonSterlingThermionics Small Mass and Size (Cost) Actual PCU213 Outlet Temperature333 Peripheral Systems (i.e. Heat Exchangers, A to D converter)111 Launchable/Accident Safe Robust to forces of launch123 Fits in rocket333 Controllable High Reliability and Limited Maintenance Moving Parts123 Radiation Resistant231 Single Point Failure123 Proven System222 Inlet Temperature331 Total

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 64 PCU – Future Work Improving Thermionic Efficiency Material studies in high radiation environment Scalability to 200kWe and up Using ISRU as thermal heat sink

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 65 Radiator Future Work Analysis of transients Model heat pipe operation Conditions at landing site Manufacturing

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 66 Analysis: Models Models –Isothermal –Linear Condenser Variables –Power –Sky temperature –Emissivity –Panel width

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 67 Analysis (2): Temperature Condenser model –Calculate sensible and latent heat loss –Length dependent on flow rate 940 K 945 K

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 68 Analysis (3): Location Environment –Moon closer to sun, but has no atmosphere Comparative Area –Moon 39.5 m 2 –Mars 39 m 2 Graph of area vs. power and t_inf (several curves)

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 69 Analysis (4): Dust Dust Buildup –SiO 2 dust has small effect on Carbon-Carbon emissivity –5% emissivity loss predicted for 5 yrs –Increase in area by 2 m 2

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 70 Analysis Models –Isothermal –Linear Condenser Comparative Area –Moon 39.5 m 2 –Mars 39 m 2

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 71 Shielding - Future Work Shielding using extraterrestrial surface material: –On moon, select craters that are navigable and of appropriate size –Incorporate precision landing capability –On Mars, specify a burial technique as craters are less prevalent Specify geometry dependent upon mission parameters –Shielding modularity, adaptability, etc.

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 72 Shielding - Alternative Designs Three layer shield –W (thick layer) inside, B 4 C middle, W (thin layer) outside –Thin W layer will stop secondary radiation in B 4 C shield –Putting thick W layer inside reduces overall mass

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 73 Shielding -Alternative Designs (2) -The Moon and Mars have very similar attenuation coefficients for surface material -Would require moving 32 metric tons of rock before reactor is started

Nuclear Engineering Department Massachusetts Institute of Technology MSR Group, 12/3/2004 Slide 74 MSR Cost Rhenium Procurement and Manufacture Nitrogen-15 Enrichment Halfnium Procurement