Slide 1 Thorpex ICSC12 and WWRP SSC7 18 Nov. 2014 The Sub-seasonal to Seasonal (S2S) Prediction Project 1 “Bridging the gap between weather and climate”

Slides:



Advertisements
Similar presentations
© GEO Secretariat THORPEX-TIGGE Overall Concept What? –TIGGE: THORPEX will develop, demonstrate and evaluate a multi- model, multi-analysis and multi national.
Advertisements

Sub-seasonal to seasonal prediction David Anderson.
NCAS-Climate: Carries out research into climate change and variability, motivated by the need to understand how the climate system will evolve over the.
WWRP CASNEW PROJECTS Polar Prediction project – The Commission concurred with the Executive Council Panel of Experts on Polar Observations, Research and.
WWRP The Sub-seasonal to Seasonal (S2S) Prediction Project Co-chairs: Frédéric Vitart (ECMWF) Andrew Robertson (IRI) 1 “Bridging the gap between weather.
The THORPEX Interactive Grand Global Ensemble (TIGGE) Richard Swinbank, Zoltan Toth and Philippe Bougeault, with thanks to the GIFS-TIGGE working group.
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
Slides for GIFS-TIGGE WG meeting Richard Swinbank.
Slide 1 TECO on the WIS, Seoul, 6-8 November 2006 Slide 1 TECO on the WIS: Stakeholder Session THORPEX and TIGGE Walter Zwieflhofer ECMWF.
Exeter 1-3 December 2010 Monthly Forecasting with Ensembles Frédéric Vitart European Centre for Medium-Range Weather Forecasts.
GEO Work Plan Symposium 2014 WE-01 Jim Caughey THORPEX IPO.
Capacity Building Activities of WWRP ( ) Workshops/Conferences (2014) 8th WMO International Workshop on Tropical Cyclones & 3rd WMO International.
WWRP Sub-seasonal to Seasonal Prediction (1-90 days) - A Seamless Approach WWRP/THORPEX, WCRP Kick off meeting on Sub- seasonal to Seasonal Prediction.
WWRP Toward a Seamless Process for the Prediction of Weather and Climate: On the Advancement of Sub-seasonal to Seasonal Prediction TTISS, September 2009,
AMS Presidential Forum January 2013© ECMWF Slide 1 Predicting Weather and Climate: Scientific progress and future opportunities Alan Thorpe AMS Presidential.
International CLIVAR Working Group for Seasonal-to- Interannual Prediction (WGSIP) Ben Kirtman (Co-Chair WGSIP) George Mason University Center for Ocean-Land-Atmosphere.
1 Buizza et al: TIGGE (SRNWP WS, Bologna, 7-8 April 2005) TIGGE (The THORPEX Interactive Grand Global Ensemble) Roberto Buizza 1, Philippe Bougeault 1,
WCRP-WWRP/THORPEX MJO Task Force Duane Waliser JPL/Caltech/USA Matthew Wheeler ABOM/Australia SSG-18, UNESCO Paris, Franca; May 2011 Membership => Established.
Slide 1 TIGGE phase1: Experience with exchanging large amount of NWP data in near real-time Baudouin Raoult Data and Services Section ECMWF.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
WWRP Open Science Conference and Summer School on Earth- system Modelling Gilbert Brunet WWRP/JSC Chair CAS MG meeting, November 2011 Madrid, Spain.
EUROBRISA WORKSHOP, Paraty March 2008, ECMWF System 3 1 The ECMWF Seasonal Forecast System-3 Magdalena A. Balmaseda Franco Molteni,Tim Stockdale.
Geneva 2-3 December 2011 Proposal for a sub-seasonal research data set.
World Weather Research Programme (WWRP) Report Gilbert Brunet WWRP/JSC Chair.
Research Results from TIGGE and a Vision for a New Paradigm for Global Prediction David Parsons Chief, World Weather Research Division (WWRD)
© Crown copyright Met Office Met Office activities related to needs of humanitarian agencies Anca Brookshaw.
WWRP OUTCOME OF CASXV (November 2009) David Burridge and Gilbert Brunet WWRP & THORPEX IPO CASXV report – ftp://ftp.wmo.int/Documents/PublicWeb/mainweb/meetings/
Linkage between the research community and operational center - case examples - First meeting of the WWRP PDEF working group Karlsruhe, Germany May,
The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,
Course Evaluation Closes June 8th.
WWRP Implementation Plan for the WWRP Polar Prediction Project Thomas Jung, Steering Group Chair Neil Gordon, WMO Consultant November
WWRP THORPEX Alan Dickinson Chair THORPEX ICSC and David Burridge THORPEX IPO.
GEO - Weather Ocean Water Proposed Weather SBA and cross-linking work packages.
TIGGE Data Archive and Access at NCAR November 2008 November 2008 Steven Worley National Center for Atmospheric Research Boulder, Colorado, U.S.A.
High Impact Weather Emerging challenge identified at CASXVI Mariane DIOP KANE Mariane DIOP KANE CASMG9, Geneva, April 2014.
GIFS-FDP Introduction to Framework Plan and links with SWFDP Richard Swinbank & Zoltan Toth.
Slide 1 GO-ESSP Paris. June 2007 Slide 1 (TIGGE and) the EU Funded BRIDGE project Baudouin Raoult Head of Data and Services Section ECMWF.
DAOS WG 5 th Meeting University of Wisconsin, Madison Sept Items 2.1 and 2.2 Jim Caughey THORPEX IPO.
1 Proposal for a Climate-Weather Hydromet Test Bed “Where America’s Climate and Weather Services Begin” Louis W. Uccellini Director, NCEP NAME Forecaster.
Slide 1© ECMWF Sub-seasonal forecasting, Forecasting system Design Frédéric Vitart European Centre for Medium-Range Weather Forecasts.
The Centre for Australian Weather and Climate Research A partnership between CSIRO and the Bureau of Meteorology Sub-Seasonal Prediction Activities and.
Strategic Planning and Future Structure of the World Weather Research Programme (WWRP) Gilbert Brunet WWRP/JSC Chair Acknowledgements to Michel Béland.
Sub-seasonal to seasonal Prediction Project. Background  Several operational centres are now producing sub-seasonal forecasts. There is a need to fill.
Year of Tropical Convection (YOTC) (and MJO Task Force) A Contribution to Seamless Weather-Climate Prediction Mitch Moncrieff, NCAR Duane Waliser, JPL/Caltech.
World Weather Research Programme What / How does the Programme help the Society? (Item 3.3) 24 May 2011.
ECMWF Training course 26/4/2006 DRD meeting, 2 July 2004 Frederic Vitart 1 Predictability on the Monthly Timescale Frederic Vitart ECMWF, Reading, UK.
TIGGE Archive Access at NCAR Steven Worley Doug Schuster Dave Stepaniak Hannah Wilcox.
THORPEX Legacy Projects Progress Report (Agenda Item 5.1) T. Nakazawa C/WWRD.
Sub-seasonal to seasonal Prediction Project. Index  Background  S2S Planning group  Implementation plan: - Applications - Research and modelling issues.
© Crown copyright Met Office Predictability and systematic error growth in Met Office MJO predictions Ann Shelly, Nick Savage & Sean Milton, UK Met Office.
WWRP 1 THORPEX-WCRP Collaborations and other climate relevant activities of the WWRP WCRP/JSC31 WMO/WWRP/THORPEX
Subseasonal to Seasonal Prediction Research: A WWRP/THOPEX and WCRP Initiative Gilbert Brunet WWRP/JSC Chair CAS MG meeting, November 2011 Madrid,
11 9th ARC Meeting 3 November 2012, Kunming, China Report from ICSC 10 Jim Caughey, THORPEX IPO.
The Sub-seasonal to Seasonal (S2S) Prediction Project
The Sub-seasonal to Seasonal (S2S) Prediction Project
Status of CMA S2S Archiving & Web portal
World Weather Research Programme
The World Weather Research Programme
Contributing Centres to S2S database
Prediction of extreme events at Sub-seasonal to Seasonal lead times
Tom Hopson, NCAR (among others) Satya Priya, World Bank
Key Questions What are the key priorities in prediction on timescales from a hour to a season? 5 Societal needs 5 Key prediction/science questions 5 technological.
S2S sub-project on verification (and products)
Jennifer Boehnert Emily Riddle Tom Hopson
Shuhua Li and Andrew W. Robertson
Links with GEO.
The Sub-seasonal to Seasonal (S2S) Prediction Project
Tropical storm intra-seasonal prediction
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team
High Impact Weather Emerging challenge identified at CASXVI
Presentation transcript:

Slide 1 Thorpex ICSC12 and WWRP SSC7 18 Nov The Sub-seasonal to Seasonal (S2S) Prediction Project 1 “Bridging the gap between weather and climate” Co-chairs: Frédéric Vitart (ECMWF) Andrew Robertson (IRI)

Slide 2 Thorpex ICSC12 and WWRP SSC7 18 Nov Mission Statement ● “To improve forecast skill and understanding on the sub-seasonal to seasonal timescale with special emphasis on high-impact weather events” ● “To promote the initiative’s uptake by operational centres and exploitation by the applications community” ● “To capitalize on the expertise of the weather and climate research communities to address issues of importance to the Global Framework for Climate Services”

Slide 3 Thorpex ICSC12 and WWRP SSC7 18 Nov ● Implementation plan finalized & printed ● Terms of references have been drafted ● 5-year project, started in Nov ● Project office: KMA/NIMR hosts the project office in Jeju island. ● Trust Fund: Contributions from Australia, USA and UK S2S project status

Slide 4 Thorpex ICSC12 and WWRP SSC7 18 Nov Madden-Julian Oscillation Monsoons Africa Extremes Verification Sub-Projects S2S Database Interactions and teleconnections between midlatitudes and tropics Sub-seasonal to Seasonal (S2S) Prediction Project Research Issues Predictability Teleconnection O-A Coupling Scale interactions Physical processes Modelling Issues Initialisation Ensemble generation Resolution O-A Coupling Systematic errors Multi-model combination Needs & Applications Liaison with SERA (Working Group on Societal and Economic Research Applications)

Slide 5 Thorpex ICSC12 and WWRP SSC7 18 Nov Madden-Julian Oscillation Monsoons Africa Extremes Verification Sub-Projects S2S Database Interactions and teleconnections between midlatitudes and tropics Sub-seasonal to Seasonal (S2S) Prediction Project Research Issues Predictability Teleconnection O-A Coupling Scale interactions Physical processes Modelling Issues Initialisation Ensemble generation Resolution O-A Coupling Systematic errors Multi-model combination Needs & Applications Liaison with SERA (Working Group on Societal and Economic Research Applications)

Slide 6 Thorpex ICSC12 and WWRP SSC7 18 Nov ● Daily real-time forecasts + re-forecasts ● 3 weeks behind real-time ● Common grid (1.5x1.5 degree) ● Variables archived: about 80 variables including ocean variables, stratospheric levels and soil moisture/temperature ● Archived in GRIB2 – NETCDF conversion available ● Database opened in May 2015, initially with 3 models (ECMWF, NCEP and JMA) S2S Database Description

Slide 7 Thorpex ICSC12 and WWRP SSC7 18 Nov CAWCR NCEP EC HMCR JMA KMA CMA ECMWF Météo France UKMO Data provider Archiving centre TIGGE-S2S Database 11 data providers and 2 archiving centres CNR

Slide 8 Thorpex ICSC12 and WWRP SSC7 18 Nov Time-rangeResol.Ens. SizeFreq.HcstsHcst lengthHcst FreqHcst Size ECMWF D 0-46T639/319L91512/weekOn the flyPast 20y2/weekly11 UKMO D 0-60N216L854dailyOn the fly /month3 NCEP D 0-44N126L6444/dailyFix /daily1 EC D x0.6L4021weeklyOn the flyPast 15yweekly4 BoM D 0-60T47L17332/weeklyFix /month33 JMA D 0-34T319L6050weeklyFix /month5 KMA D 0-60N216L854dailyOn the fly /month3 CMA D 0-45T106L404dailyFix1992-nowdaily4 Met.Fr D 0-60T255L9151monthlyFix monthly15 ISA-CNR D x0.56 L5440weeklyFix /month1 HMCR D x1.4 L2820weeklyFix weekly10 S2S database partners

Slide 9 Thorpex ICSC12 and WWRP SSC7 18 Nov. 2014

Slide 10 Thorpex ICSC12 and WWRP SSC7 18 Nov Areas of S2S – DAOS collaboration? ● Impact of coupled data-assimilation on S2S forecasts (more important) ● Impact of improvements in the observing system on sub-seasonal forecasts (less important) ● A workshop on coupled DA ● Identify cases (thought expts) where coupling would play a strong role at the S2S time scale (maybe MJO related?), to illustrate the concepts.