Bow Lake Elementary School SeaTac, Washington Elementary School New Construction BLRB Architects, p.s. 2008 Exhibition of School Planning and Architecture.

Slides:



Advertisements
Similar presentations
Project Name Location Category of Entry Award Type Firm Name 2011 CEFPI North East Region Exhibition of School Planning and Architecture.
Advertisements

Monroe Elementary Everett, Washington Project of Distinction Award- New Construction Elementary School Dykeman, Inc. 2012Exhibition of School Planning.
TARVER ELEMENTARY SCHOOL Temple, Texas Elementary School New Construction Project SHW Group 2008 Exhibition of School Planning and Architecture.
Southwest High School Albuquerque, New Mexico High School Design Concept / Projects Under Construction Award Perkins+Will 2008 Exhibition of School Planning.
Austin, Texas 2013 CEFPI Southern Region Conference.
Mountainside Middle School Mead, Washington New Construction Middle/Junior High School NAC|Architecture 2010 Exhibition of School Planning and Architecture.
The University of Sacramento Design of New Campus Sacramento, California Design Concept Award Projects in the Design Phase Holabird & Root 2009 Exhibition.
Silver Crest Elementary School HERRIMAN, UTAH Project of Distinction – New Construction Elementary School VCBO Architecture 2010 Exhibition of School Planning.
East Fairhaven Elementary School Fairhaven, MA Elementary School Project of Distinction Submission HMFH Architects, Inc Exhibition of School Planning.
Clark County School District Virtual High School and Vegas PBS Las Vegas, Nevada Project of Distinction New Construction JMA Architecture Studios 2010.
College of Southern Nevada Instructional Center – City of Las Vegas Fire Station Las Vegas, Nevada Project of Distinction New Construction JMA Architecture.
Rogers High School Spokane, Washington The Lee Brockway Award for Renovations High School NAC|Architecture 2010 Exhibition of School Planning and Architecture.
La Quinta High School Career Technical Education La Quinta, CA Projects in the Design Phase Design Concept Award Ruhnau Ruhnau Clarke 2010 Exhibition of.
Peachtree Charter Middle School Dunwoody, Georgia Project of Distinction – New Construction Middle/Junior High School Cooper Carry, Inc Exhibition.
Northeast Indiana Regional Public Safety Academy Fort Wayne, Indiana New Construction Project of Distinction SchenkelShultz Architecture 2008 Exhibition.
MONTGOMERY HIGH SCHOOL MODERNIZATION & NEW CONSTRUCTION
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture.
El Cerrito High School El Cerrito, CA New Construction Project of Distinction WLC Architects, Inc Exhibition of School Planning and Architecture.
Westwood Elementary School San Diego, California Elementary School Lighthouse Renovation NTD Architecture 2008 Exhibition of School Planning and Architecture.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
East Ridge Middle School Clermont, Florida New Construction Project Project of Distinction SchenkelShultz Architecture 2008 Exhibition of School Planning.
Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning.
École secondaire catholique Jean-Robert-Gauthier - Phase II Ottawa, Ontario, Canada New Construction Project of Distinction Edward J. Cuhaci and Associates.
Bainbridge High School 200 Building Bainbridge Island, Washington High School Project of Distinction/New Construction Mahlum 2009 Exhibition of School.
Osseo Adult Education Center Brooklyn Center, Minnesota Other: Adult Education Project of Distinction – New construction ATS&R Planners/Architects/Engineers.
GARFIELD HIGH SCHOOL historic renovation/addition Seattle, Washington High School Renovation/Addition BLRB Architects 2009 Exhibition of School Planning.
Eastgate Elementary School Bellevue, Washington Elementary School Project of Distinction – New Construction NAC|Architecture 2010 Exhibition of School.
Lansing Community College University Center Lansing, Michigan New Construction Project Project of Distinction SHW Group 2008 Exhibition of School Planning.
Little Cedars Elementary School Snohomish, Washington Elementary School Project of Distinction – New Construction NAC|Architecture 2008 Exhibition of School.
Westside Elementary School
Eastern Guilford High School Guilford County, NC New Construction Project of Distinction SFL+A Architects 2009 Exhibition of School Planning and Architecture.
Grant Community High School District 124 Fox Lake, Illinois High School Additions OWP/P | Cannon Design 2010 Exhibition of School Planning and Architecture.
Advanced Technology Center Blue Ridge Community College New Construction Project of Distinction Moseley Architects 2012 Exhibition of School Planning and.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Swiftwater Elementary Center Swiftwater, Pennsylvania Project of Distinction Elementary School Gilbert Architects Inc Exhibition of School Planning.
Marco Antonio Firebaugh High School Lynwood, California High School Project of Distinction - New Construction Projects LPA, Inc Exhibition of School.
Lawrence High School Lawrence, Massachusetts High School New Construction Project of Distinction Flansburgh Architects 2008 Exhibition of School Planning.
Groton-Dunstable Regional High School Groton, Massachusetts High School Project of Distinction Submission HMFH Architects, Inc Exhibition of School.
Los Angeles County High School for the Arts Los Angeles, CA Design Concept Award HMC Architects 2008 Exhibition of School Planning and Architecture.
Roosevelt and Jackson Elementary Schools
Malibu High School/Middle School Modernization and Reconstruction Malibu, CA Design Concept Award HMC Architects 2008 Exhibition of School Planning and.
2009 Exhibition of School Planning and Architecture
Kathlyn Joy Gilliam Collegiate Academy Dallas, Texas Project Type: High School Project of Distinction Award – New Construction SHW Group 2012 Exhibition.
DePauw University Judson and Joyce Green Center for the Performing Arts Greencastle, Indiana New Construction Project of Distinction Institutions of Higher.
Samuel Brighouse Elementary School
Sage Point Elementary School Moses Lake, Washington New Construction Elementary School NAC|Architecture 2010 Exhibition of School Planning and Architecture.
Desert Torah Academy Las Vegas, NV Design Concept Entry Projects Under Construction Award TMP Architecture in association with Perlman Design Group 2008.
Quincy High School Quincy, Massachusetts Design Concept Award High School Symmes, Maini & McKee Associates 2010 Exhibition of School Planning and Architecture.
2009 CEFPI Exhibition of School Planning and Architecture Mountain Green Elementary School Mountain Green, Utah Project of Distinction Elementary School.
Columbus Signature Academy New Tech Campus – Phase 1 Columbus, Indiana Lee J. Brockway Award Renovations High School CSO Architects 2009 Exhibition of.
Catherine Kolnaski Elementary School
Atrisco Heritage Academy Albuquerque, New Mexico High School Project of Distinction – new construction Perkins+Will 2010 Exhibition of School Planning.
Eastgate Elementary School Bellevue, Washington Elementary School Design Concept Awards – Projects in the Design Phase NAC|Architecture 2008 Exhibition.
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2011 Exhibition of School Planning and Architecture.
don r. roberts elementary school
Blue Springs High School Blue Springs, MO Project in the Design Phase Design Concept Award Hollis + Miller Architects 2009 Exhibition of School Planning.
CHURCH HILL MIDDLE SCHOOL New Braunfels, Texas Middle School Lighthouse Award SHW Group 2008 Exhibition of School Planning and Architecture.
Glacier High School Kalispell, Montana High School Project of Distinction (New) CTA Architects Engineers 2008 Exhibition of School Planning and Architecture.
Jackson Community College Information & Technology Center Jackson, Michigan New Construction Project Project of Distinction SHW Group 2008 Exhibition of.
Issaquah High School Issaquah, Washington High School Design Concept Award Mahlum Architects 2008 Exhibition of School Planning and Architecture.
River Valley School Sundre, Alberta, Canada Elementary School (K-8) New Construction / Addition Group2 Architecture Engineering Ltd Exhibition of.
2017 Exhibition of School Planning and Architecture
2008 Exhibition of School Planning and Architecture
Silver Lake Regional High School
Glacier View Junior High
Location Category of Entry Award Type
2016 Exhibition of School Planning and Architecture
2019 Exhibition of School Planning and Architecture
2012Exhibition of School Planning and Architecture
2011 Exhibition of School Planning and Architecture
Presentation transcript:

Bow Lake Elementary School SeaTac, Washington Elementary School New Construction BLRB Architects, p.s Exhibition of School Planning and Architecture

Bow Lake Elementary School

Multi-Purpose Room and Stage Community Environment: Formed from a public-public partnership between the city and the district, the City of SeaTac has a community room in the building, which is used as a community childcare center before and after school hours. This synergy between the school district and the city creates additional funding for the program, serving both public agencies at once. Community-use facilities such as the gymnasium and multi-purpose room are also strategically located in the building, allowing for convenient community access.

Student Courtyard - Looking toward the community-use facilities (Multi-Purpose Room & Gym)

Learning Environment: Consolidating two highly disparate schools into one, Bow Lake Elementary School blends the differences of students into a melting pot of educational opportunity. Home to the Deaf and Hard of Hearing Program, the Highly Capable Program and the English Language Learning Center, representing 66 languages, the school seamlessly intermixes students in four “neighborhoods”. Each neighborhood has a distinct identity, creating personalized small learning communities within the larger setting. Uniquely integrated, students are opened to an opportunity for curiosity and a world of perspective. “Grasslands” Neighborhood Entry and the Main Classroom Corridor

Learning Environment Cont.: Because of the small learning neighborhoods, students receive individualized attention, while gaining a broad educational experience. In addition, these communities have helped to retain the feel of a smaller school. Classroom with Operable Partition

Physical Environment: The two-story, 75,000 SF facility is organized to integrate and celebrate the school’s diversity, enriching and strengthening the educational experience for all. The facility provides a centralized administrative area, and offers flexible, personalized learning by creating small communities or “neighborhoods” around shared activity areas. There are 6 classrooms clustered around the shared activity room promoting collaboration and hands-on learning. Shared Activity Area

Shared Activity Area - With Operable Glazed System Open to Outdoors Physical Environment Cont.: The building further invites students to learn from the surrounding outdoor environment by providing operable glazed systems in each community that literally blurs the line between indoors and outdoors. The building's layout not only creates independent team areas, but also provides clearly defined, supervisable and logical internal circulation paths throughout the facility.

Main Entry Planning Process: Highline School District was facing tight budgets and shrinking enrollment leading to the decision to combine Valley View Elementary and Bow Lake Elementary. Each school represented to a unique student body. Bow Lake was home to mostly lower income students, as well as the Deaf and Hard of Hearing Program, and English Language Learning Center representing 66 languages. Valley View served predominantly upper middle class students and housed the District’s Highly Capable Program.

Administration Waiting Area Planning Process Cont.: Designing Bow Lake Elementary School brought together these two diverse communities of students, teachers, and learning styles. Through numerous planning and design meetings with teachers, staff and parents from both schools, new community was formed and a unified goal for the new school emerged. Constant school and district involvement during the design phase helped eradicate any feelings of turf wars. Because of collaborative planning and design meetings, the staff from each school had a large voice in the design of Bow Lake. The design was shaped by the voice of everyone involved, and the students and faculty from both schools ultimately embraced the consolidation.

Exhibition of School Planning and Architecture 2008 Project Data Submitting Firm :BLRB Architects, p.s. Project RoleArchitect Project ContactThomas L. Bates, FAIA TitleManaging Principal Address1145 Broadway Plaza, Suite 1200 City, State or Province, CountryTacoma, Washington Phone(253) Joint Partner Firm: Project Role Project Contact Title Address City, State or Province, Country Phone Other Firm: Project Role Project Contact Title Address City, State or Province, Country Phone Construction Firm:Porter Brothers Construction Project RoleGeneral Contractor Project ContactJerry Munro TitleProject Manager Address2222 Meridian Avenue East, Suite B City, State or Province, CountryEdgewood, Washington Phone(253)

Exhibition of School Planning and Architecture 2008 Project Details Project Name Bow Lake Elementary School City SeaTac State Washington District Name Highline Public Schools Supt/President John P. Welch Occupancy Date September 2007 Grades Housed Grades K-5 Capacity(Students) 600 students Site Size (acres) 8.9 acres Gross Area (sq. ft.) 74,980 SF Per Occupant(pupil) 125 SF/pupil gross/net please indicate Gross Design and Build? No If yes, Total Cost: Includes: If no, Site Development: $2,800,000 Building Construction: $16,918,000 Fixed Equipment: $780,000 Other: Total: $20,498,000

Main Entry

Classroom Wings

View of Classroom Wings and Outdoor Gathering Area

View of Library from Student Courtyard

Library - Entry and Check-out