Last collaboration meeting B. Plaster nEDM February 2008 Collaboration Meeting Attention now focused on construction of a 1/2-scale prototype modified.

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

The magnetic field uniformity and gradient of the B0 coils inside the lower cryostat for the nEDM experiment. S.Balascuta , dr. Ricardo Alarcon ASU Dr.
Magnetic Field Finite-Element Calculations for the Upper Cryostat S. Balascuta, R. Alarcon Arizona State University B. Plaster, B. Filippone, R. Schmid.
Magnetic fields R&D update B. PlasternEDM November 2007 Collaboration Meeting Results from prototype studies of a 1/6-scale B 0 coil with Results from.
Cryostat and Magnet Status Report UIUC EDM Collaboration Meeting LANL June 20, 2005.
TRD ROC Status Clemens Adler TRD Status Meeting TRD ROC Status.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel and.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
Page 1 Christian Grefe, DESY FLC Status of PCMAG fieldmapping analysis Annual EUDET Meeting Paris, Status of PCMAG fieldmapping analysis Christian.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Charged Particles In Circular Orbits
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Coverage Efficiency in Autonomous Robots With Emphasis on Simultaneous Localization and Mapping Mo Lu Computer Systems Lab Final Version.
EDM Magnetic Shielding (WBS 5) and Magnets (WBS 6) B. Filippone and B. Plaster Caltech Internal Cost and Schedule Review February 11, 2004.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Book Reference : Pages To understand how to generate electricity using electromagnetic induction 2.To be able to establish the relative direction.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
The Four-Layer Conventional Magnetic Shield Brad Plaster, Caltech May 25, 2006  “Current” design  Estimated shielding factors  Production and time-scale.
Magnet development experiments B. Plaster Last collaboration meeting (February 2007) x : field direction y : “vertical” z : axial N = 40 cos θ coil 1/7-prototype.
HV-SQUID Compatibility Test Study the SQUID performance in a HV environment. Study the HV breakdown –in superfluid under pressure. –using different materials.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Dressed Spin Simulations Steven Clayton University of Illinois nEDM Collaboration Meeting at Arizona State University, February 8, 2008 Contents 1.Goals.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
AMS-02 tracker mechanics status of construction, assembly, integration Ladder assembly Ladder installation on planes Integration details, cooling loop,
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Polarized 3 He Relaxation Low T N. Boccabello, D. Dutta, H. Gao, K. Kramer, X.Qian, Q. Ye, X. Zong (Duke) L. Hannelius, B. Heyburn, R.D. McKeown,
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Y. R. Roblin Hall A beamline and accelerator status.
Coverage Efficiency in Autonomous Robots With Emphasis on Simultaneous Localization and Mapping Mo Lu Computer Systems Lab Q3.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
NEDM Collaboration Meeting, May 19, 2008 Valve Progress Steve Williamson.
NEDM Collaboration Meeting, November 1-3, 2007 Valve Progress Steve Williamson, UIUC.
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
Correctors for the J-PARC Proton Beam Line Peter Wanderer BNL Superconducting Magnet Div. September 8, 2007 T2K US B280 Collaboration Mtg.
Recent Magnetic Field Results Results from our automated field-mapper system Mappings of N = 8 and N = 40 coil –Coil field profile –Coil + Magnetic Shield.
Magnetic Field and Magnetic Shielding R&D
Cos θ Coil and Magnetic Shielding Progress B. Filippone and B. Plaster Caltech December 3, 2004.
WBS 6: Magnetic Shielding B. Filippone and B. Plaster Caltech December 3, 2004.
Status of MICE Coupling Coil Magnets D. Li and M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory February 16, 2011 MICE CM29-Rutherford.
Lab 10 Hints. Eddy currents (1A-1) Magnet Plate Metal pipe Plastic pipe Drop the magnet through the plastic tube and onto the paper plate, so as not to.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
NuMI Detector NIM Paper Draft MINOS Detectors NIM Paper Status and Job List for this Meeting Dave Ayres & Alec Habig Argonne & Minnesota – Duluth MINOS.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Attempting to Cost Estimate the nEDM Upper Cryostat Larry Bartoszek, PE Bartoszek Engineering 12/2/04.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Solenoidal magnet. The status of manufacture, forthcoming works
LARP Phase II Secondary Collimator RC1
Progress and Issues with VTS Upgrade
LARP Phase II Secondary Collimator RC1
Overview of the Frascati Production Facilities
Chapter Seven Constructions and Scale Drawings
Status of SF Model Dipole Contract with TAMU
nEDM Preliminary Engineering Review Magnets & Magnetic Shielding
Presentation transcript:

Last collaboration meeting B. Plaster nEDM February 2008 Collaboration Meeting Attention now focused on construction of a 1/2-scale prototype modified cos θ coil and ferromagnetic shield acrylic tube 24” O.D. 6’ + 1.5’ (glued) 3-ring set of acrylic “rings” Not “true” cos θ coil; wire positions optimized for uniformity in presence of ferromagnetic shield

Updated status of 1/2-scale coil B. Plaster Status Acrylic materials and drawings on hand since August 2007 Machining to be done at the Caltech HEP shop Plagued by delays at machine shop (i.e., were considered low priority) nEDM February 2008 Collaboration Meeting

Updated status of 1/2-scale coil B. Plaster nEDM February 2008 Collaboration Meeting Still delays … but some (recent) progress 90”-long, 24”-O.D. acrylic tube 72” + 18” now glued Locating slots machined Wednesday: Machine shop notified water-jet cutting of rings complete, but not yet transported to Caltech …

Last collaboration meeting B. Plaster nEDM February 2008 Collaboration Meeting Also in process of upgrading our automated mapping system to accommodate the 1/2-scale coil and the 1/2-scale dewar 27’-tall structure, Caltech HEP high-bay area Goal is first results (perhaps not best !!) by April/May/June time-scale

Status of magnet mapper B. Plaster nEDM February 2008 Collaboration Meeting Lots of progress here … Magnet mapping setup now exists in HEP/astronomy high-bay area Total height ~27 feet Accommodates 1/2-scale dewar 1/2-scale coil 1/2-scale ferromagnetic shield 1/2-scale Pb shield Translation hardware checked out Assuming coil is completed, still on track for April/May/June time-scale ~ 15 ’ (x,y,z) translation hardware