23.6.03TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale.

Similar presentations


Presentation on theme: "23.6.03TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale."— Presentation transcript:

1 23.6.03TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale

2 23.6.03TRD Status meetingClemens Adler Material Wacosit (G10) Profiles delayed...  Voltage Divider PCB: waiting for more offers Signal Cables: Cheap polyester cable is OK -> waiting for more offers Padplanes: see Davids talk

3 23.6.03TRD Status meetingClemens Adler Minor Design update Wireledge: proposed design final design Rationale: -Gain low enough -No glue is drawn on Anode wires in test chambers Anodewire cathodewire

4 23.6.03TRD Status meetingClemens Adler Tooling Gluing tables: in work at Hd Wiring frame: first prototype from GSI, test soon Bonding machine: see David‘s talk

5 23.6.03TRD Status meetingClemens Adler Time scale