Mu2e Mu2e CD-2 Review Template Eric Prebys Extinction October 21-24, 2014.

Slides:



Advertisements
Similar presentations
Muon g-2 Inflector AEM Meeting 11/25/2013 Chris Polly Muon g-2 Project Manager.
Advertisements

Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
WBS 2.08 Extinction Independent Design Review of Mu2e 5/3/11 Eric Prebys L3 Manager for Extinction.
Yury CHESNOKOV Crystal Collimation workshop, March 7, 2005 CALIBRATION of CMS CALORIMETERS with LHC PROTON BEAM DEFLECTED BY CRYSTAL CALIBRATION of CMS.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Fundamentals of Information Systems, Second Edition
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Eric Prebys, FNAL.  As you’ll show in homework, the synchrotron tune (longitudinal oscillations/turn) is generally
Advanced Project Management Project Plan Templates
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
 A GEANT4-based simulation was performed of the production target, solenoid, selection channel, and spectrometer.  The acceptance was found to be 8.3x10.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Mu2e Extinction and Extinction Monitoring (2.09) Lehman CD-1 Review of Mu2e June 6-7, 2012 Eric.Prebys Extinction L3 Manager Dr. Smith: We’re doomed! Maureen:
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 Advanced Project Management Project Plan Templates Ghazala Amin.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Eric Prebys, FNAL HB2012, Beijing, China.  Representing the Mu2e Collaboration  24 Institutions  ~120 Collaborators  This talk has direct contributions.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
Eric Prebys Accelerator Physics Center Fermilab *Very much a work in progress 7/24/09.
Eric Prebys Accelerator Physics Center Fermilab 7/30/09.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
1 Beam Extinction and Monitoring at the Upcoming Mu2e Experiment Ryan J. Hooper on behalf of the Mu2e Collaboration DPF 2015 August 5th, 2015.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Linda Bagby - SBN Program Electrical Coordinator ICARUS Electronics Meeting 27 January 2016 SBN Program Operational Readiness Clearance.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
PAC Meeting, December 12, Prebys 1 The Problem.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Extinction Eric Prebys Mu2e Extinction Technical Design Review 2 November 2015.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Simulation of Extinction Channel Eric Prebys Mu2e Extinction Technical Design Review 2 November 2015.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
Beam Commissioning Adam Bartnik.
Resource Loaded Schedule and Budget Profile
T980 STATUS AND CHANGES FOR
Managing the Project Lifecycle
News and brief overview of Beamline plans for the next few months
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Muon Front End Status Chris Rogers,
Chapter 3 Managing the Information Systems Project
Linac LLP Outline LINAC Long Lead Procurements
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
SNS-PPU upgrades the existing accelerator structure
SR Background Update for JLEIC
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

Mu2e Mu2e CD-2 Review Template Eric Prebys Extinction October 21-24, 2014

Mu2e WBS Extinction The Mu2e experiment has very stringent limits on the amount of beam that appears between pulses The extinction task is comprised of –Providing this level of extinction. –Monitoring to verify that we have achieved it. We will address “Extinction” and “Extinction Monitoring” in separate talks 10/21/14-10/24/14Eric Prebys - Extinction2

Mu2e Organizational Breakdown 10/21/14-10/24/14Eric Prebys - Extinction3 WBS 2.08 Extinction E. Prebys Deputy: TJ Gardner WBS Conceptual E. Prebys WBS External Extinction E. Prebys WBS Extinction Monitoring P. Kasper WBS Technical Documentation E. Prebys

Mu2e Organization of Talks My talk: –Extinction System: Requirements Technical design Projected performance Value engineering, risks, etc… –Cost and schedule for both Extinction and Extinction Monitoring P. Kasper’s talk: –Extinction Monitor Requirements Technical design Projected performance Value engineering, risks, etc 10/21/14-10/24/14Eric Prebys - Extinction4

Mu2e Extinction Requirements* The total extinction requirement is This is primarily driven by the need to eliminate radiative pion capture, as described in detail in Mu2e-DOC-1175 Extinction will be achieved in two steps –Our beam delivery technique will “naturally” provide an extinction of ~10 -5 or better. The “Internal Extinction Collimation” discussed at CD-1 will not be needed (see discussion under “value engineering”) –An “External Extinction System” will consist of a set of resonant dipoles and collimation system, such that only in time beam will be transmitted to the production target Aiming for additional extinction. 10/21/14-10/24/14Eric Prebys - Extinction5 *extinction monitor requirements will be discussed shortly < 1 every ~300 bunches

Mu2e Principle of Operation of AC Dipole System An angular deflection at the AC dipole cause a position displacement 90° later in phase advance Define normalized deflection angle In terms of this angle 10/21/14-10/24/14Eric Prebys - Extinction6 Admittance of collimator (set to 40 π-mm-mr β at AC dipole (=250 m)

Mu2e Design Considerations 10/21/14-10/24/14Eric Prebys - Extinction7 Bend strength to extinguish: Stored Energy:  Large  x, long weak magnets - Assume  x =250m, L=6m - Factor of 4 better than “typical” values of  x =50m, L=2m Driving consideration in beam line design!

Mu2e Two Separate Collimation Issues 10/21/14-10/24/14Eric Prebys - Extinction8 AC dipole shifts distribution along x’ axis in phase space Beam core: out of time beam will be steered into the collimator or collimators downstream of the AC dipole Admittance of downstream collimation system High amplitude beam tails will be steered into the collimation channel, so they must be cleaned up upstream of the AC dipole Phase space distribution at location of AC dipole

Mu2e Extinction Optics* 10/21/14-10/24/14Eric Prebys - Extinction9 *E. Gianfelice Extinction collimation Halo collimation

Mu2e Mu2e Beam Line 10/21/14-10/24/14Eric Prebys - Extinction10

Mu2e AC Dipole Design and Prototype AC dipole system consists of 6 identical one meter elements, arranged in two 3-meter vacuum vessels. Extensive tests done with half-meter prototype –meets all specificiations 10/21/14-10/24/14Eric Prebys - Extinction11 Elements individually powered

Mu2e AC Dipole Harmonics The AC dipole elements will be driven by 3 harmonics –2 300 kHz (half bunch frequency), such that beam is transmitted at the nodes. –3 4.5 MHz to reduce slewing during transmission Optimized to maximize transmission of in-time beam. –1 900 kHz, to reduce amplitude and prevent beam pipe scraping upstream of the collimator. 10/21/14-10/24/14Eric Prebys - Extinction12

Mu2e Collimator based on designs previously used in Main Injector and Tevatron Separate motion controllers/LVDTs at each end so position and angle can be precisely controlled Collimator Design 10/21/14-10/24/14Eric Prebys - Extinction13 Collimator and stand: Control and position measurement

Mu2e Extinction Performance 10/21/14-10/24/14Eric Prebys - Extinction14 ­ Extinction Transmission ­ Average Delivery Ring Distribution ­ Average Distribution on Target Two Models Two Models: 1.Beam distribution from ESME longitudinal tracking model in the Delivery Ring. 2.G4Beamline tracking model of extinction section of the M4 beamline. (Mu2e-DOC-5054)Results: Upstream extinction: 1.6 × In-time beam transmission: 99.7% Downstream extinction:8 × † † This number assumes that there is no contribution from long transverse tails.

Mu2e Changes since CD-1 At CD-1, we were still considering the possibility that we might need collimation inside the Delivery Ring to reduce out of time beam. –Simulations showed this will not be necessary, so it was de- scoped. CD-1 design had 5 collimators downstream of the AC dipole. New design has 2 upstream and 1 downstream. The third harmonic has been added to the AC dipole system to prevent particles from scraping upstream of the collimator. 10/21/14-10/24/14Eric Prebys - Extinction15

Mu2e Value Engineering since CD-1 Elimination of internal extinction collimation (see previous slide). Reduction in number of external extinction collimators from 5 to 3 (see previous slide). Low frequency (300 kHz) power supply based on existing standard Fermilab (Krafczyk) design. 10/21/14-10/24/14Eric Prebys - Extinction16

Mu2e Remaining work before CD-3 The following designs are very mature –AC Dipole and power supply –Collimators –Upstream and downstream extinction monitors These require only finalized designs and more accurate cost estimates The only significant work before CD-3 is the finalization of the collimation upstream of the AC dipole to eliminate the large amplitude tails. –Working on this design in conjunction with the beam line design. 10/21/14-10/24/14Eric Prebys - Extinction17

Mu2e Quality Assurance AC Dipole magnets and Power supplies –Magnets will be constructed by Technical Division, which has standard procedures for QA for all devices they build, as overseen by the Quality and Materials Department See –After assembly, magnets will be powered using the final power supply, and fields verified using the same procedure as for the prototype. Collimators –Fabrication will follow best practices, as outlined in the “Fermilab Quality Assurance Plan”. –Collimators will be assembled and fully exercised prior to installation in the tunnel 10/21/14-10/24/14Eric Prebys - Extinction18

Mu2e Risks Both the extinction and extinction monitoring system are based on mature technology, so risks from CD1 have been retired We have budgeted for two collimators upstream of the AC dipole to remove high amplitude tails. It’s possible that modeling will show these are not sufficient, and as many as two additional collimators might be required. –Potential cost impact: $160k 10/21/14-10/24/14Eric Prebys - Extinction19 ACCEL Threat Failure of extinction system to sufficiently eliminate out of time beam ACCEL OpportunityNo need in internal extinction collimation ACCEL-037 Threat Extinction monitor fails to perform to requirements. realized! retired

Mu2e ES&H The AC Dipole, collimators, and internal extinction monitor will be in the beam line enclosure, and must follow established ES&H procedures all such elements. In addition, the AC dipole power supply will require a written LOTO procedure, which will be generated as part of it’s documentation. The external monitor will not be accessible during operation, but simulations show there will not be any significant activation when beam is off. The upstream end of the filter channel will be in an extremely radioactive area, so it has been designed so it can be aligned from a safe location downstream. 10/21/14-10/24/14Eric Prebys - Extinction20

Mu2e Cost Distribution by L4 10/21/14-10/24/14Eric Prebys - Extinction21 Base Cost by L4 (AY $k)

Mu2e Cost Distribution by Resource Type 10/21/14-10/24/14Eric Prebys - Extinction22 Base Cost (AY $k)

Mu2e Quality of Estimate 10/21/14-10/24/14Eric Prebys - Extinction23 Base Cost by Estimate Type (AY$k)

Mu2e Labor Resources by FY 10/21/14-10/24/14Eric Prebys - Extinction24 FTEs by Discipline

Mu2e Labor and M&S by FY 10/21/14-10/24/14Eric Prebys - Extinction25

Mu2e Cost Table Cost is roughly equally divided between the extinction and extinction monitoring 10/21/14-10/24/14Eric Prebys - Extinction26

Mu2e Major Milestones 10/21/14-10/24/14Eric Prebys - Extinction27

Mu2e Schedule 10/21/14-10/24/14Eric Prebys - Extinction28 The extinction and extinction monitoring systems are entirely resource driven, and far from the critical path of the experiment. All beam line elements (AC Dipole, Collimation, Upstream Monitor) are scheduled to be complete by the middle of FY18 The installation of the Target Monitor is intimately linked to construction of the building and beam dump, and therefore sets the critical path for the Extinction Task.

Mu2e Summary We have designed an effective system to provide the extinction required by the Mu2e experiment and to verify that we have achieved that extinction. We are confident that we have met the requirements for CD-2 approval of this system. –Preliminary design complete –Project ready to baseline 10/21/14-10/24/14Eric Prebys - Extinction29