CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.

Slides:



Advertisements
Similar presentations
Master Programme in Space Engineering 300 ECTS = 5 year Luleå 2,5 year + Kiruna 2 year + Master thesis project 1/2 år Courses of ECTS = 5 weeks (some 15.
Advertisements

BillikenSat – II Pico-Satellite that conforms to the CubeSat standard Team Leader: Darren Pais Electrical Eng.: Ben Corrado Payload: Rob Arechederra MISSION:
Senior Design Hardware Presentation David Anthony.
CASTOR Jr. MIT 2LT Corey Crowell 2LT Matt McCormack Lucas de la Garza Spenser Parra.
University of Kansas EPS of KUTEsat Pathfinder Leon S. Searl April 5, 2006 AE256 Satellite Electrical Power Systems.
CINEMA PDR- MEC 1 CINEMA Mechanical Subsystem PDR August 22, 2008 David Glaser/Paul Turin.
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 MAGIC Patrick Brown Imperial College London.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
COMS Transceiver – RF DataTech LRT470 Frequency: MHz Operation: Half-Duplex Max. RF Transmit Power: 750mW Typical Power Draw at 750mW RF: 3.5W Bandwidth:
AMSAT Fox-1 Overview AMSAT Engineering Team 2011 Space Symposium.
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
CubeSat (ENG491CU1) Informational Meeting Get Interdisciplinary Design Experience Working on One of the Worlds Smallest Satellites Fall 2005.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Attitude Determination and Control System (ADCS)
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
CINEMA Mission Readiness Review
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
By P.Pranavi Beyond Night Sky. 1957TILL DATE Beyond Night Sky.
CINEMA (CubeSat for Ions, Neutrals, Electrons & MAgnetic fields) Jerry Kim * David Glaser † Thomas Immel ‡ * Systems Engineer, †
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
Taeyeon Kim. Page  2 1.Vibration test plan for KHU 2.Harnessing 3.STEIN Housing 4.Future work.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
TRIO-CINEMA 1 KHU, 08/10/2010 TRIO-CINEMA Activity in Korea Jongho Seon 10 Aug 2010.
Subsystem Design Review 1 December 2015 Drawing Package Subsystem Design Review Deployment and Intelligent Nanosatellite Operations (DINO)
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
1 Weekly Summary Weekly Summary Formation Flight AEM4332 Spring Semester March 7,2007 Masao SHIMADA.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
SPP FIELDS DFB Quarterly June 16, 2015 Solar Probe Plus FIELDS Instrument Quarterly Q Digital Fields Board (DFB) 1.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
Component Selection and PCB Fabrication Supervisor: Dr. Peter Driessen Presenter: Justin Curran.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Mechanical Systems David Glaser Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester.
TRIO-CINEMA FSW- 1 SSL, 8/10/2010 Flight Software Seyoung Yoon and Sameet Ramakrishnan Space Sciences Laboratory Kyung Hee University University of California,
Introduction: The on-board measurements available for control are a dual-slit sensor to find the elevation of the sun and a magnetometer to measure the.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
TRIO-CINEMA 1 UCB, 2/08/2010 LVPS & Switching Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 Integration and Test Program Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 10/8/2010 Chassis & Avionics Stack Design Jerry Kim Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 End of Summer Review Kevin Jenkins Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
TRIO-CINEMA 1 UCB, 2/08/2010 ACS Dave Auslander, Dave Pankow, Han Chen, Yao-Ting Mao, UC Berkeley Space Sciences Laboratory University of California, Berkeley.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.
USNA Standard CubeSat Bus USNA-P1 CubeSat (USNA-14)
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Preliminary Platform Design for KuaFu-A
Command & Data Handling
CINEMA System Engineering
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Solar Probe Plus – FIELDS Main Electronics Package
MAGIC Interface Issues
Command & Data Handling
Instrumented Walker Status Update 2
Hardware Systems Review
HA1L High Altitude 1U Laboratory
CubeSat vs. Science Instrument Complexity
CONTOUR NGIMS Electronics Test History
Radio Interface Board Status
Presentation transcript:

CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN Scientist Davin Larson, UCB MAGIC Scientist Tim Horbury, ICL Imperial College London CINEMA

9 summer UCB students on CINEMA team. 3 returning now. 4 students from IAUPR and 4 from KHU visited all summer. End of summer review held with all students +4 visiting from KHU with PI Current Mass Budget: 2.7 kg (not including harnessing or thermal materials) Electrical Power – Clyde Space EPS has been tested extensively w/3U battery – 8 Solar Panels constructed, 2 of 10 flight panels now produced. Torque coil and panel have now undergone shake test w/RBSP. C & DH – 3 dsPIC Dev Units, one for each of FSW, EE, and Attitude Control (ACS) groups – FSW 70-80% done Housekeeping, Transmit, Power, Background, I2C, MAG. Next more MAG, CMD and EXEC Radio Communication – S-band downlink patch antenna on 3 rd ETU: Applying for NTIA spectrum assignment. – Helium Radio receiver testing underway. ACS – Simulink control code now converted to C, running on PIC. Debugging issue with k vector determination. – Flight Sun Sensors have been tested extensively, now with new black paint.

Spacecraft Structure – Mockup of Chassis complete and in SSL 214. – Many updates have been made in response to antenna placement, torque coil changes, harnessing issues, P-POD fit. UHF antenna going to fabrication. STEIN (SupraThermal Electrons, Ions and Neutrals) – ASIC specification underway. Sensor design and layout complete. Dev boards fabricated and sensors tested by KHU. MAGIC (MAGnetometer from Imperial College) – ETU sensor and test board are complete and being tested. ETA 1 week. – Simplified plan for sampling ADC driven by dsPIC, not FPGA state machine. Other Components – Instrument interface board laid out complete and quoted, Gerber and drill files going to Imagineering October 1. Working parts list with local assembler ETA Oct 15. – FPGA spec, and now VHDL code developed in close collaboration with Imperial College. – S-band dual patch antenna/splitter/coax mechanical and electrical ETU being fabricated for system tests before purchase of Emheiser Radio. – Harnessing issues drove several mm move of avionics stack. – Consideration of high voltage P/S for STEIN to be breadboarded before PCB order.