1B.Morozov CNI Meeting 31 July 2009 1 Possible Upgrades for CNI Carbon Polarimeter G. Atoian, R. Gill, B. Morozov.

Slides:



Advertisements
Similar presentations
Advanced GAmma Tracking Array
Advertisements

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Alternatives to CsI(Tl) O. Tengblad/T. Nilsson Phoswich solutions GEANT-4 simulations Read-out electronics Multiplexing Swedish plans (Chalmers/KTH)
Trigger-less and reconfigurable data acquisition system for J-PET
Multichannel Analyzers A multichannel pulse-height analyzer (MCA) consists of an ADC, a histogramming memory, and a visual display of the histogram recorded.
Comments to the AGS pC polarimeter data processing t 0 based calibration Observations of Boris Morozov’s results Dead layer corrections. A novel method.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
L.Royer– Calice DESY – July 2010 Laurent ROYER, Samuel MANEN, Pascal GAY LPC Clermont-Ferrand R&D LPC Clermont-Fd dedicated to the.
Napoli October 2007 WG3 - Pierre Edelbruck FAZIA WG3 – Front End Electronics.
DIS 2006 Tsukuba, April 21, 2006 Alessandro Bravar Proton Polarimetry at RHIC Alekseev, A. Bravar, G. Bunce, S. Dhawan, R. Gill, W. Haeberli, H. Huang,
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
This experiment is to obtain the excitation functions of the 13 C (α, α) 17 O elastic scattering at the initial beam energy 13 C.
Preliminary MC study on the GRAND prototype scintillator array Feng Zhaoyang Institute of High Energy Physics, CAS, China GRAND Workshop, Paris, Feb. 015.
Systematic Errors Studies in the RHIC/AGS Proton-Carbon CNI Polarimeters Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group:
Beam diagnostics in the beamlines
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
DEAR SDD --> SIDDHARTA
Trip-t testing progress report
POLARIMERTY STATUS REPORT FOR RUN-11 November 18, 2010 RSC meerting I. Alekseev b, E. Aschenauer a, G. Atoian a, A. Bazilevsky a, A. Dion a, H. Huang a,
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
A Possible Path Forward Current Polarimeter Upgrades Efforts A Possible Path Forward Current Polarimeter Upgrades Efforts Based on a proposal by Boris.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
A Prototype Diamond Detector for the Compton Polarimeter in Jefferson lab, Hall C Medium Energy Physics Group Amrendra.
Click to edit Master subtitle style Presented By Mythreyi Nethi HINP16C.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region September 30, 2006 RHIC Spin Collaboration Meeting RIKEN, Wako, Japan.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
25 juin 2010DPallin sLHC_Tile meeting1 Tilecal VFE developments at Clermont-Ferrand June 2010 Status G Bohner, J Lecoq, X Soumpholphakdy F Vazeille, D.
1 August CNI Carbon Polarimeter for AGS G. Atoian, H. Huang, Y. Makdisi, B. Morozov, A. Zelenski - Introduction - Detectors and Front-End - Front-End.
Update on works with SiPMs at Pisa Matteo Morrocchi.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Analog Circuits Hiroyuki Murakami. CONTENTS Structure of analog circuits Development of wide linear range CSA system Problem of analog circuits How to.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
Readout Electronics for high-count-rate high-resolution
Study of the Radiation Damage of Hamamatsu Silicon Photo Multipliers Wander Baldini Istituto Nazionale di Fisica Nucleare and Universita’ degli Studi di.
"North American" Electronics
DAQ ACQUISITION FOR THE dE/dX DETECTOR
DAQ (i.e electronics) R&D status in Canada
Journées VLSI-FPGA-PCB Juin 2010 Xiaochao Fang
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Jean-Sebastien Graulich, Geneva
The KLOE calorimeter front end electronics
Alternative FEE electronics for FIT.
Ewald Effinger, Bernd Dehning
Design of Digital Filter Bank and General Purpose Digital Shaper
大強度
EMC Electronics and Trigger Review and Trigger Plan
Conceptual design of TOF and beam test results
Status of n-XYTER read-out chain at GSI
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
X. Zhu1, 3, Z. Deng1, 3, A. Lan2, X. Sun2, Y. Liu1, 3, Y. Shao2
BESIII EMC electronics
ME instrument and in-orbit performance
PHENIX forward trigger review
Presentation transcript:

1B.Morozov CNI Meeting 31 July Possible Upgrades for CNI Carbon Polarimeter G. Atoian, R. Gill, B. Morozov

2B.Morozov CNI Meeting 31 July Introduction Detectors and Front End: Large changes in leakage current (0.02μA to 4μA) Poor resolution (>50 KeV) Poor high rate response (“ghost” peak) Probably “Dead layer” instability during run Expensive custom silicon strips Low dynamic range of the Preamps (~11MeV) Preamp connections can damage vacuum feed- through Large shaper constant (~ 35 ns) Noise pick up due to long distance (~100m) between Preamp and Shaper and cable type Event filtering (Digitizer and “DAQ” Problems): 8-bit WFD limits dynamic range Rate dependence of resolution, gain and efficiency for pulser Adjacent polarimeters give varying results Observe unexplained bunch-to-bunch asymmetry FPGA code limitations Main problems with present system 70 KHz/10mm MeV Carbon “ghost” peak 0.3 MeV carbon

3B.Morozov CNI Meeting 31 July Detectors & FrontEnd Detectors: Hamamtsu Single PIN photodiode for direct detection (S7509) Each detector has 10mm x 2mm active area and ~120 μg thickness. The typical dead layer is 60 μg/cm2 8 detectors were placed on the existing 6 vacuum ports. Light diodes were used for monitoring purpose Front End: Charge sensing Preamps & Shapers(MSI-8) (in one box) were connected to the detectors through the 0.5 m long low capacitance coax. The Shaper has two outputs: “fast” - 20 ns rise time and “slow”- 140 ns rise time. Dynamic range: “slow” - 35 MeV “fast” - 60 MeV Ultra thin Carbon ribbon Target (5  g/cm 2 ) Si single PIN detectors (TOF, E C ) 18cm

4B.Morozov CNI Meeting 31 July Test results (Detector 1cm x 1cm, Hamamatsu S ) The prototype of the setup has been tested on Tandem & RHIC run’09. Tandem (Carbon response): - good linearity (0.3%) over Carbon energy range of 0.3 MeV – 6 MeV - Energy Resolution (~ 20 KeV) is two times better than BNL-strip. - Resolution almost does not change up to Carbon rate of 400 KHz/det

5B.Morozov CNI Meeting 31 July Test results (Hamamatsu S , collimated by 4mm x 8mm) RHIC Run’09 – single bunch Carbon Spectroscopy: low Inverse Bias current (from ~0.02μA to ~0.2μA after four months run. Compare: 0.02μA to 4μA for BNL-strip) excellent and stable energy resolution (<20 KeV) over all run. good intrinsic time resolution (.4ns) carbon mass separation with mass resolution almost three times better than BNL-strip.

6B.Morozov CNI Meeting 31 July Simplified Schematic

7B.Morozov CNI Meeting 31 July Digitizers & Trigger Digitizers: The Peak sensing ADC(MADC-32) is used for deposit energy measurement -11 bits μs dead time - 10 ns Time Stamp - VME The Dead Time-less TDC (V767A) is used for TOF ns bin width - 10 ns double pulse resolution - VME Triggers: The CFD discriminator (V812B) & fast logic(SiS3820) were used for trigger - with “fast” shaper output - protection against multiple pulsing - bunch#0 time synchronization - “Prompt” suppression at the beginning of each bunch.

8B.Morozov CNI Meeting 31 July DAQ update While the detectors and the front end modifications are well motivated by test results, the DAQ system modification is not so obvious. The suggested DAQ is a conventional DAQ based on the Peak Sensing ADC. It is simple and easy to maintain. The present CNI-DAQ has more advanced architecture based on WFD, but: -it samples pulses from shaper, not from preamps output; -it works, so-called, in ADC mode – pulse peak and time obtained “on-the-fly” by using FPGA code, which has limitation for modification. In fact, we were unable to handle the monitoring pulses which have a slightly different shape compared to “Carbon” pulse; -DAQ modification based on WFD requires a lot of man-power as well as time. There are two main drawbacks using conventional ADC: a possible pile-up and dead time losses. A pile-up comes from the fact that the rise time of the digitized pulse is ~140 ns (“slow” shaper output). It gives a pile-up of ~0.7% at the rate of 50 KHz/channel (compared to ~0.2% for present CNI-DAQ). During the test we use the “slow” output for purpose to suppress high frequency induced noise only. (In fact the bits Mesytec MADC32 can digitize pulses with rise time of 20 ns at 11-bits mode of operation.) Unfortunately, our efforts to suppress the high frequency induced noise by using another methods were unsuccessful so far. Thus, conservative strategy is to keep the rate low. MADC32 has 0.8 μs dead time and one gate for 16 channels. It will give ~40% losses at the rate of 50 KHz/channel. The suggested passive splitter will reduce the loss value to ~15%, which is acceptable. It should be noted that the pile-up reduction is important, because pile-up “introduces” directly systematic shift to polarization value, while dead time losses increase the measurement time for given statistics only.

9B.Morozov CNI Meeting 31 July DAQ update cont. The VME can handle 80Mbytes/sec, but it is, probably, hard to realize in practice even MADC32 and TDC use some buffering technique. The ~50Mbytes/sec is more realistic number. The total number of detector is 48 (6 ports x 8 detector). At assumption that background/signal ratio is 1 (run’09 result) and 14 bytes event size (ADC(2) + TimeStamp(4) + TDC(4) + Spare(4)), the data rate is ~70Mbytes/sec at 50KHz carbon rate. It is safe to split system into two VME crates. The buffer of the VME interface has 2Gbyte, which is enough even for ramp mode operation.

10B.Morozov CNI Meeting 31 July Cost Estimation ItemPrice/itemQtyTotal Detector (S7509)~$20200~$4000 Ceramic board~$15024~$3600 Bias power supply system$ ADC (MADC32)$66256$39750 Preamps&Shapers (MSI8)$263624$63264 TDC (V767A)~$40001 CFD (V812B)$55013$16503 VME crate (6023/611)$77832$15566 VME-PC interface (SiS3104/1104)$55002$11000 Logic Unit (SiS 3820)$39001 Multiplexer~$20001 Total for entire system ~$200000

11B.Morozov CNI Meeting 31 July Summary During last the years we tested several detectors for alpha and carbon spectroscopy: Si-strips, Si PIN Photodiode Strips with different terminal capacitance, LYSO scintillators, Si diamond and Si PIN Photodiode Single. Also, several Front End configurations have been tested: Charge Sensing Preamps&Shapers (with different form factors, shaping constants and dynamic ranges), current preamps with 4K and 40K amplifications. Single SI PIN Photodiode with the charge sensing preamps&shapers (20ns/140ns shaping and 60MeV/35MeV) one box form factor gives the best performance in terms of the energy and time resolutions, dead layer uniformity, rate behavior and noise suppression. It is very robust set up, easy to handle and… also cheap. On our strong opinion it is the best choice for CNI polarimeter so far. The conventional DAQ with modern Peak Sensing ADC (thanks to MADC32) is also simple and well suitable for our purpose, especially, if one uses the shaper filtering and prompts noise suppression on the level of the events triggers. Besides that it is to programming without an any “magic touch” technique. Estimate less than 1 man-year for DAQ software development. The detectors set up and DAQ are based completely on commercial available devices. Concerning the RHIC polarimeters we still have two main problems, and therefore, we have to pay attention: to the rate control and the system monitoring.